How to write a personal annual work summary for a data clerk

A written material that summarizes the review and analysis of study, work and life in a period, a year, and a stage. It can help us straighten out the knowledge structure, highlight key points, and break through difficulties. I Guess we need to write a summary. Have you thought about how to write the summary? The following is the personal annual work summary of the data clerk that I compiled for everyone. I hope it can help everyone!

Personal annual work summary of the data clerk 1

1. Work aspects

(1) Organize and complete construction site information in a timely manner, collect and save documents and meeting documents issued by the company and relevant departments, and organize those that were not specifically organized before The documents are sorted and put into folders according to categories to provide convenience for everyone to check the documents; do a good job in issuing, circulating and delivering various documents and drawings and archive the original documents, and do a timely job of reviewing and filing the information; Documents are issued, circulated, and delivered by relevant departments. The receiving department signs and confirms the original document, archives the original document, and prepares a data borrowing registration form to urge the borrower to return the data.

After a period of study, I learned that the main job of the data clerk is to organize and complete the construction data in a timely manner, collect and save the documents issued by the company, and keep the minutes of the project department meetings, and organize the original work that was not detailed Organize the documents according to categories and put them into folders and number them; at the same time, do trivial things such as issuing, circulating and delivering various documents and drawings.

The quality of our products remains an issue. For example, every time E882 makes a large-scale product, there will be quality problems of varying degrees. Fortunately, the clothing factory is more cooperative, and there is no big claim in the end. If there is a problem and there is no claim in the end, it does not mean that I am OK. If we change to another garment factory, no one can guarantee the result. Nowadays, the supply of product production capacity exceeds demand in many fields. Therefore, customers are more selective. For customers, the channels for product sources have increased, and the substitutability of product sales has increased, so customers' purchasing behavior has become more rational. Whether to buy, what to buy, and how much to buy, demand is very selective. Therefore, under such conditions, product "survival of the fittest, survival of the fittest" has become a reality. In this regard, we must accurately grasp changes in market demand and improve product quality. Quality is the cornerstone of winning orders.

In addition, this project is being designed and constructed at the same time, with frequent project changes, design changes, and project negotiations. Design changes and project negotiations directly affect construction progress and project settlement. If changes and negotiations are not communicated in a timely manner and cause economic losses, then the hard work of the entire project department will be meaningless. Therefore, changes and negotiations must be distributed to relevant personnel of the project department in a timely manner, and technical personnel must communicate them to the construction team at the forefront of the construction as soon as possible.

(2) Under the guidance of manager _, verify the completeness of the project data, repair, cut, and fold the wrinkled, damaged, and uneven documents to keep the appearance as good as possible. Neatly and uniformly, classify the documents and materials according to the characteristics of the data content, bind the materials belonging to the same volume in file boxes and store them in cabinets, and check the documents and materials regularly, trace the missing documents, and find out the reasons. The project data should be filled in carefully , the results are neatly bound and clearly visible at a glance, so as to facilitate future inspection and filing. Register and keep various books and information sheets of the project department.

(3) Responsible for the timely handling of the relationship coordination between the project department and the Urban Reform Office and the submission of materials for review.

(4) Responsible for meeting minutes within the project department, writing meeting minutes, entering documents, archiving drawings, contracts and other paperwork, as well as answering phone calls in the office.

2. Ideological aspect

On February 11, 20__, he set off from Korla to the southwestern oil base of Tarzan to start participating in the construction of natural gas projects to benefit the people in southern Xinjiang. The original plan was to carry out the work in the second bidding section. By chance, a series of changes occurred in the middle, which made me transition from the position of process supervision engineer to the position of data clerk.

At the beginning of the work, I was at a loss when I took over the data work halfway through the adjustment with my new colleagues, the disapproval of Party A, and the unfamiliarity with the construction unit. Just when I was at a loss, Director Xiao, XCMG and Liang Dan, the data clerk from Southwest China, gave me timely help.

Since the work of a data clerk is relatively tedious, I have always dealt with things encountered at work with a positive working attitude since I entered the company. Although some emotional problems occasionally occur, I can deal with them quickly. Solve your own problems, actively engage in work, and treat every job correctly and seriously; carefully study the company's rules and regulations, conscientiously abide by labor disciplines, ensure timely attendance, and ensure that work can be completed on time.

3. Existing deficiencies and future work directions

Although I have been working as a data clerk in a real estate company, since I did not graduate from the civil engineering major, I have nothing to master. Is it very systematic? Some things are still being gradually explored and explored, so there are some detailed issues, such as the writing of meeting minutes and document archiving, which require further study and improvement, especially the identification of drawings, which requires continuous learning.

In the future, I will make up for my shortcomings at work, improve my working methods, improve work efficiency, learn more and ask more questions, and effectively improve my working ability. And in the improvement of work, we will strengthen theoretical study, strive to bring ideological awareness and work efficiency to a new level, and contribute to XX's tomorrow.

Data Clerk’s Personal Annual Work Summary 2

Based on the work plan formulated at the beginning of the year, I completed the following tasks this year.

1. In terms of civilized and high-quality services: Taking "customer-centered" as the guiding ideology and based on more than six years of business knowledge accumulation, I provide enthusiastic and efficient services. At the same time, we consciously divert simple services handled by small and medium-sized customers to self-service terminals to increase the usage of self-service terminals.

2. In terms of marketing: "High-quality service is the best marketing tool." On this basis, I adhere to "one-sentence marketing" and promote products such as online banking, funds, credit cards, and Huolibao. At the same time, accumulate target customer groups and prepare for daily marketing and future marketing.

3. In terms of internal control: start by doing your own work well, ensuring that all work is completed with the lowest error rate, and achieving true efficiency. Be good at introducing, helping and guiding new colleagues. Assist the business manager to complete various self-examination tasks. In the work of bank-enterprise reconciliation, we use face-to-face, telephone reminders, and collection methods to improve our bank's reconciliation rate.

4. In terms of self-study and improvement: with the purpose of doing a good job and improving one's own quality, actively participate in various trainings, such as: personal finance, afp follow-up training, etc.

In the past year, various tasks have been completed relatively well, but problems still exist.

In terms of business accumulation and learning: the knowledge is not comprehensive enough, because the needs of customers are all-round, and the current knowledge is not enough. In the future, learning in this area should be strengthened, and self-study should be the main focus through training, supplemented by consulting colleagues after class, in order to "improve individual combat capabilities."

In the new year, the intensity of our bank’s reforms and the depth of assessments will be unprecedented. I must change my concepts, keep up with the pace, obey orders, resolutely implement, give full play to my advantages, and address my own shortcomings. Keep learning and working hard.

Looking back on the past year, all experiences have turned into good memories. Combined with my own work position, I have achieved some results in the past year, but there are still certain shortcomings. Our bank conducts branch transformation, improves service quality, and strengthens branch marketing. Our branch has partially adjusted its staffing and arranged low-counter sales staff. The personal financial management business has achieved initial development and has begun to try to provide professional comprehensive personal investment and financial management services to mid-to-high-end customers. I also adjusted from the low cabinet to the financial office to engage in personal financial management business. Although I encountered many difficulties and problems at work.

However, under the guidance of the Wealth Management Center of the Personal Finance Department of the branch and the great attention of the branch leaders, we have built teams, cultivated talents, focused on business development, expanded the market with new products, and increased marketing efforts. In 21 years, our bank has made some achievements in our financial management work. score.

Data Clerk’s Personal Annual Work Summary 3

Time flies by, and in a blink of an eye, it is already my second year as a data clerk in the project department.

My main job on the project is to collect, organize and manage the ___ project data and communicate with the company, supervision unit, urban reform office and subcontracting units in a timely manner, and handle it carefully Responsible for negotiating changes during construction, responding to supervision notices and submitting other relevant information for inspection, sending and receiving contact sheets for supervision and subcontracting units, as well as project atlas and standardized distribution management. Cooperate with the project department, supervision and subcontracting units as much as possible, and provide them with the required information to do their jobs well. I will now make the following report on my personal year-end summary. I hope all leaders and colleagues can provide valuable opinions and suggestions.

Summary of work situation

1. Work aspects

(1) Organize and complete construction site information in a timely manner, collect and save documents and meetings issued by the company and relevant departments Document work, and organize the documents that were not specifically sorted out by category and put them into folders to provide convenience for everyone to check the documents; do a good job of issuing, circulating and delivering all kinds of documents and drawings, and archive the original documents, Carry out the review and filing of materials in a timely manner; issue, circulate, and deliver documents to relevant departments. The receiving department signs and confirms the original documents, archives the original documents, and prepares a data borrowing registration form to urge the borrower to return the data.

(2) Under the guidance of manager _, verify the completeness of the project data, repair, cut, and fold the wrinkled, damaged, and uneven documents to keep the appearance as good as possible. Neatly and uniformly, classify the documents and materials according to the characteristics of the data content, bind the materials belonging to the same volume in file boxes and store them in cabinets, and check the documents and materials regularly, trace the missing documents, and find out the reasons. The project data should be filled in carefully , the results are neatly bound and clearly visible at a glance, so as to facilitate future inspection and filing. Register and keep various books and information sheets of the project department.

(3) Responsible for the timely handling of the relationship coordination between the project department and the Urban Reform Office and the submission of materials for review.

(4) Responsible for meeting minutes within the project department, writing meeting minutes, entering documents, filing drawings, contracts and other paperwork, as well as answering phone calls in the office.

2. Ideological aspects

Since the work of a data clerk is relatively cumbersome, since I entered the company, I have always dealt with things encountered at work with a positive working attitude. Although occasionally Some emotional problems occurred, but I was able to deal with my own problems quickly, actively devoted myself to work, and could treat every job correctly and seriously; seriously studied the company's rules and regulations, conscientiously abided by labor disciplines, and ensured attendance on time. Make sure the work is completed on time.

3. Existing deficiencies and future work directions

Although I have been working as a data clerk in a real estate company, since I did not graduate from the civil engineering major, I have nothing to master. Is it very systematic? Some things are still being gradually explored and explored, so there are some detailed issues, such as the writing of meeting minutes and document archiving, which require further study and improvement, especially the identification of drawings, which requires continuous learning.

In the future, I will make up for my shortcomings at work, improve my working methods, improve work efficiency, learn more and ask more questions, and effectively improve my working ability. And in the improvement of work, we will strengthen theoretical study, strive to bring ideological awareness and work efficiency to a new level, and contribute to XX's tomorrow.

Since joining the company, I have been responsible for the data compilation, collection and management of the Linqiao community living affordable housing project. The project data truly reflects the construction results of the project. In the spirit of "all work data comes first" "Principle, strictly follow national standards and regulations and various regulations, and proactively work with relevant departments and responsible persons to sort out and improve various information in a timely manner as the construction progresses. My main work and summary are as follows:

1. Cooperate with professional engineers to strictly control the project data of the construction unit. Data are various forms of information records formed during the project construction process. Only and This work can only be completed and done well with the full cooperation of professional engineers, construction unit data clerks, and supervision units. The organization and collection of data is a gradual accumulation process. It is necessary to ensure the authenticity and completeness of the data and provide timely, effective and applicable data for project acceptance.

2. Accumulate, organize and archive the documents formed by the early geological survey and construction drawing design.

3. Responsible for recording construction site meetings, ensuring true and effective records, sorting out meeting minutes, and issuing them after being countersigned by all participating units.

4. Responsible for sending and receiving documents, contact letters, and construction drawings between the engineering department and various participating units, keeping records, and filing them.

5. Responsible for shooting, organizing and archiving image data of important construction parts of the project. For future reference and project settlement purposes.

The above is my main work in the engineering department in the past six months, and there are also some shortcomings:

There is a certain degree of laxity in the supervision of the construction unit’s submission of engineering materials for inspection. Units do not pay attention to the preparation of project data, and often report project data only after a certain sub-project has been completed, resulting in delays and lags. Project data should be collected, organized and handed over in accordance with the construction progress simultaneously. In the future work, I will strictly require the construction unit to prepare and submit the project data for inspection to ensure the authenticity, validity and completeness of the project data, laying the foundation for the smooth acceptance of the project.

Work plan for 20__:

1. The project will enter the foundation and main construction stage. There are many construction teams and many construction projects. The technical data items involved are complicated. This It is also a test for my working ability, and I will continue to perform my responsibilities seriously. Strengthen the supervision of civil engineering, installation, and safety data of each construction unit, and review them regularly to ensure that technical data are compiled in a timely and complete manner, and meet the acceptance requirements of the quality inspection station.

2. Carefully do a good job of sending, receiving, recording, and archiving all important documents and correspondence during construction.

3. Assist professional engineers in the engineering department to organize and archive various construction materials.

I feel very lucky and proud to be able to participate in the construction of Linqiao Community Living Affordable Housing, a project with a large scale, many construction projects and complete supporting facilities. Compared with other colleagues, my strength is insignificant. I hope all leaders and colleagues will criticize and correct any shortcomings in my future work. I will summarize the shortcomings of the past, continue to work hard, and contribute my own meager strength to the construction of the company!

Personal annual work summary of the data clerk 4

20__ has already passed, and 20__ My work has also come to an end. During this year, I have overcome various difficulties through my own efforts, especially with the strong support of the leadership and the cooperation of my colleagues. I have completed various tasks well. All aspects have also been improved. This year is meaningful, valuable and rewarding. Now I will summarize the study and work situation of this year as follows:

1. Work:

In March 20__, I came to the __ project, mainly engaged in measurement , statistics and calculation work. This job requires me to be dedicated first. You must devote yourself to work with a positive attitude. Since you have chosen this career and this position, you must go all out and complete it with due diligence. The second is to treat work with a rigorous and meticulous attitude. You must strictly demand yourself to be meticulous in your work.

Measurement, statistics and calculation work is a meticulous job for me. Its requirements are very strict and it requires me to be serious and meticulous. To ensure that the data is accurate, the correct data will facilitate future audits, so it must be serious, careful and error-free. This requires us to treat our work with a rigorous and meticulous attitude when doing our work. The third is responsibility. Work is a responsibility for us.

We have an obligation to fulfill our responsibilities with all our heart and be responsible. Therefore, the quality of your work also depends on your sense of responsibility for your work. The fourth is high efficiency of work. For me, improving the efficiency of my work means learning more and absorbing good knowledge that can improve efficiency from learning. Next, I need to refine the problem and make a decision in a short time. I must make a prompt decision and set a specific time to arrange the work. Give yourself strict deadlines. The fifth is confidentiality. The work I do is highly confidential, especially when it comes to outsourced construction teams, unit prices, etc. must be kept confidential. Here I also experienced that work has been very beneficial to me. Although the work is very hard, it is really a learning opportunity for me. From this, I experienced the nature of work and learned a lot of things and knowledge that I had never been exposed to before. There are also many shortcomings. In the new year, I ask myself to have a brand new self. Clarify your thoughts and do your work in more detail.

2. Ideology:

If a person likes his or her work, it may not be possible, but if we want to like it 100%, it depends on how we do it. I should look at this job with a good attitude. That is to say, since I have chosen this job, I should devote myself to it without hesitation and reflect my own values. Many people who have successful careers do not like their jobs too much. , but they have a high sense of responsibility and perseverance in professionalism. They are engaged in ordinary work every day, but they have made extraordinary achievements. You can imagine that as long as you pay, you will get good rewards.

This year I have also welcomed the test of work with gratitude. I often think that because of this job, I have reflected my own value; because of this job, I have honed my skills. will. When I calm down, I will reflect and realize that compared with many laid-off and unemployed people, I am grateful that I have a generous salary; compared with the old and infirm, I am grateful that I have youth and health; compared with the mediocre people, I am grateful. I work fulfillingly every day. When you do a good job and you are satisfied with your actions, you will be happy.

3. Specific measures to complete the work plan:

General corporate statistical work sample In 202_, I was mainly responsible for the measurement, statistics and calculation of the __ project. To do this job well, you must first be familiar with the construction drawings and bill of quantities, check them carefully, and establish a ledger. This will be of great help in finding and comparing data, guiding construction production, etc. in the future. The second is to timely complete the forms required for monthly project measurement work and statistics, conscientiously perform job responsibilities, communicate with supervisors, owners, etc. in a timely manner to establish a good external environment. The third is to communicate in a timely manner with the on-site quality inspectors and construction teams, to be aware of the completed project volume and progress, and to complete the results desired by the leaders on time.

IV. Suggestions for enterprise development:

(1) Full management. Cost management should be managed by all employees. To achieve full participation and establish economic awareness among all employees, we can sign corresponding economic contracts within the company to straighten out the company's internal economic relations, so that all units are interconnected, collaborate with each other, restrict each other, have a clear division of responsibilities, and have clear powers. Interests are matched.

(2) It is cost control, do a good job in pre-event control: calculate first and act later, and know what you are doing. Before undertaking a project, risk prediction technology can be used to conduct a risk assessment on the feasibility of the project to minimize risks. Use value engineering to analyze the functional requirements of the project. On the premise of ensuring the quality of the project, various construction plans are proposed and comparatively evaluated technically and economically. It has positive significance for future calculations.

In addition, the reliability of bidding project quantity estimation should be improved as much as possible to facilitate macro-control of bidding prices, which not only ensures the winning rate of bids, but also ensures the costs and reasonable profits of each professional project.

(3) It is necessary to comprehensively consider the relationship between quality, construction period and cost. During the entire project operation process, we must correctly handle the relationship between quality, construction period and cost, strive to improve the efficiency of fund use and reduce financial costs. and administrative costs.

(4) It is necessary to establish a clear and effective cost control system, implement standardized management, encourage incentive mechanisms and contract mechanisms, and assign cost responsibilities to each position and designated personnel. Corresponding reward and punishment measures should be implemented to balance responsibilities, rights and benefits, making cost reduction a conscious action for every manager.

Looking forward to the work in 202_, I will work harder. I will continue to make progress in my job and achieve greater results. I believe that in the continuous growth, I will make my contribution to the development of the company. I believe that I will be able to do better in 202_!

Data Clerk’s Personal Annual Work Summary 5

Time flies by, and in a blink of an eye, it is my second year as a data clerk in the project department. My main job on the project is to collect, organize and manage the __ project data and communicate with the company, supervision unit, urban reform office and subcontracting units in a timely manner, and carefully handle the change negotiation and supervision during the construction. Responsible for the submission of notification replies and other relevant information, sending and receiving contact sheets for supervision and subcontracting units, as well as project atlas and standardized distribution management. Cooperate with the project department, supervision and subcontracting units as much as possible, and provide them with the required information to do their jobs well. I now summarize my personal year-end work as follows:

1. Work aspects

(1) Organize and complete construction site information in a timely manner, collect and save documents and meetings issued by the company and relevant departments Document work, and organize the documents that were not specifically sorted out by category and put them into folders to provide convenience for everyone to check the documents; do a good job of issuing, circulating and delivering all kinds of documents and drawings, and archive the original documents, Carry out the review and filing of materials in a timely manner; issue, circulate, and deliver documents to relevant departments. The receiving department signs and confirms the original documents, archives the original documents, and prepares a data borrowing registration form to urge the borrower to return the data.

(2) Under the guidance of the manager, verify the completeness of the project data, repair, cut, and fold the wrinkled, damaged, and uneven documents to keep them as tidy as possible in appearance. Uniformly, classify the documents and materials according to the characteristics of the data content, bind the materials belonging to the same volume in file boxes and store them in cabinets, and check the documents and materials regularly, trace the missing documents, and find out the reasons. The project data should be filled in carefully. The writing is neatly bound and clearly visible at a glance, so as to facilitate future inspection and filing. Register and keep various books and information sheets of the project department.

(3) Responsible for the timely handling of the relationship coordination between the project department and the Urban Reform Office and the submission of materials for review.

(4) Responsible for meeting minutes within the project department, writing meeting minutes, entering documents, filing drawings, contracts and other paperwork, as well as answering phone calls in the office.

2. Ideological aspects

Since the work of a data clerk is relatively cumbersome, since I entered the company, I have always dealt with things encountered at work with a positive working attitude. Although occasionally Some emotional problems occurred, but I was able to deal with my own problems quickly, actively devote myself to work, and treat every job correctly and seriously; study the company's rules and regulations conscientiously, abide by labor disciplines conscientiously, and ensure attendance on time. Make sure the work is completed on time.

3. Existing deficiencies and future work directions

Although I have been working as a data clerk in a real estate company, since I did not graduate from the civil engineering major, I have nothing to master. Is it very systematic? Some things are still being gradually explored and explored, so there are some detailed issues, such as the writing of meeting minutes and document archiving, which require further study and improvement, especially the identification of drawings, which requires continuous learning.

In the future, I will make up for my shortcomings at work, improve my working methods, improve work efficiency, learn more and ask more questions, and effectively improve my working ability. And in the improvement of work, we will strengthen theoretical study, strive to bring ideological awareness and work efficiency to a new level, and contribute to XX's tomorrow.

How to write a personal annual work summary for a data clerk Related articles:

★ Five personal work summaries for a data clerk

★ Personal annual work summary template for a data clerk (5 (Article) 2021

★ Personal work summary of the data clerk (selected 5 articles)

★ 4 personal summary essays of the data clerk

★ Personal work of the construction data clerk Summary

★ 5 short personal work summary reports for data clerks

★ Sample personal year-end work summary for data clerks

★ 3 year-end work summaries for data clerks

★ 5 personal year-end work summaries for 2020 data clerks