According to the plan, from June of 20 17 to March of 20 18, the average concentration of PM2.5 in the "2+26" city of Beijing-Tianjin-Hebei air pollution transmission channel decreased by more than 15% year-on-year, and the days of severe pollution decreased by more than 15% year-on-year. Therefore, the construction industry is required to stop production during this period, with special emphasis on the cement building materials industry.
At present, Tianjin has issued a document and Beijing has also issued a document, but it is not that serious. The literature of Hebei has not been published, but it is estimated that some areas will follow suit.
Extended data:
(three) clear the scope of work stoppage, to ensure that the dust control standards.
1. Downtime: 20171.05 to 20 18.03 15.
2. Work stoppage scope: all areas in Dongcheng District, Xicheng District, Chaoyang District, Haidian District, Fengtai District and Shijingshan District; Tongzhou District, Daxing District, Fangshan District, Mentougou District, Yanqing District, Changping District, Huairou District, Miyun District, Pinggu District, Shunyi District, Yizhuang Economic and Technological Development Zone and built-up area.
3. Work stoppage content: stop all kinds of earthwork operations such as road engineering, water conservancy engineering and house demolition and construction.
For major livelihood projects and key projects involving earthwork, it is really impossible to stop work, the project construction unit shall apply, which belongs to the preliminary examination of the regional housing and urban-rural construction Committee, and declare to the municipal housing and urban-rural construction Committee in the name of the district government, and implement it after being approved by the municipal government.
(four) to strengthen law enforcement inspection, severely dealt with according to law.
1. During the heating season, the Municipal Commission of Housing and Urban-Rural Development scored the real estate development enterprises that refused to stop earthwork operations and house demolition projects according to law, and included them in the dynamic supervision and management of the qualifications of real estate development enterprises in Beijing, suspended the examination and approval of newly started projects, and suspended the bidding qualifications of supervision units and construction units in the Beijing construction market for six months.
2. During the period from the date of publication to 5438+05 June/kloc-0, if the dust control project is found to be unqualified, the bidding qualification of the construction enterprise of this project in Beijing construction market will be suspended for 30 days; 65438+1October 16 to165438+1October/October 15, found that the dust control project is not up to standard, suspended the bidding qualification of the project construction enterprise in Beijing construction market for 60 days;
165438+1October16 to 65438+February 15, found that the dust control project is not up to standard, and suspended the bidding qualification of the project construction enterprise in Beijing construction market for 90 days; During the period from 20 17 12 16 to 20 18 03 15, a project with substandard dust control was found, and the bidding qualification of the project construction enterprise in Beijing construction market was suspended for 6 months.
3. Within one month, it is found that three or more projects of the same construction enterprise are not up to standard, and all the projects under construction in this city are suspended for 30 days for rectification, and its bidding in Beijing construction market is suspended for 6 months according to law. For three consecutive months, it was found that the dust control of the same construction enterprise was not up to standard, and its bidding in Beijing construction market was suspended for six months.
4. Within one month, it is found that three or more projects of the same real estate development enterprise are not up to standard in dust control, and all their subordinate projects are suspended for rectification for 30 days. At the same time, the examination and approval procedures for newly started projects were stopped, and the municipal planning and land commission and other departments were requested to suspend their trading qualifications in the Beijing land market for three months.
5. If three or more projects are found to be unqualified in dust control within one month or the same supervision company fails in dust control for three consecutive months, its bidding qualification in Beijing construction market will be suspended for three months.
6. During the heating season, it is found that the dust control on the construction site of major livelihood projects and key projects that can carry out earthwork operations with the approval of the municipal government is not up to standard. In addition to the above penalties, the qualification for earthwork operation is cancelled.
7. See the Special Inspection (Acceptance) Table of Dust Control on Construction Site for the inspection standard of dust control on construction site (see annex). If the inspection score reaches 85 points (inclusive) or above, and the score of each participating item is not less than 50% of the total score, it is up to standard, and if it is lower than the above standard, it is not up to standard.
8. The Municipal Housing and Urban-Rural Development Committee regularly informs the whole city of enterprises and projects that have been investigated and dealt with due to dust pollution violations.
(5) Strengthen the joint law enforcement of departments and make concerted efforts.
City, District Housing and Urban-Rural Development Committee and environmental protection, urban management and other departments regularly carry out law enforcement inspections on dust control at construction sites, and take measures such as joint prevention and control, joint investigation, joint management, and high-limit punishment for problems such as inadequate dust control measures at construction sites, failure to use muck transport vehicles as required, and poor coverage of bare earthwork.
(six) to strengthen the management of construction waste, establish a responsibility traceability mechanism.
The construction unit shall choose the transportation enterprise that has obtained the business license to undertake the tasks of engineering construction waste, earthwork removal and earthwork backfilling, and ensure the use of qualified transportation vehicles.
Construction units shall use containers or pipelines to transport construction waste in buildings and structures, and it is forbidden to throw it into the air. A closed garbage station should be set up in the construction site, and it should be removed in time according to the regulations, and a special person should be arranged to be responsible for cleaning the transport vehicles entering and leaving the construction site.
City, District Housing and Urban-Rural Development Committee environmental protection, urban management and other departments should be responsible for the illegal behavior of the muck truck on the construction site, and seriously investigate the responsibility of the construction unit and the construction unit on the construction site. Enterprises that illegally use substandard vehicles to transport muck shall be submitted to the Municipal Urban Management Committee for blacklisting, and the business qualification of transport enterprises shall be suspended for 6 months.
Dust control in the construction site of Baidu Encyclopedia -20 17-20 18 autumn and winter construction system