The so-called energy difference actually refers to the difference between the fixed manufacturing cost budget and the fixed manufacturing cost standard cost.
Or use the standard allocation rate to calculate the difference between the standard working hours and the actual business volume, reflecting the loss caused by the failure to make full use of the existing production energy.