1 fresh air unit
X- 1 fresh air unit control system (without humidification)
X-2 fresh air unit control system (with humidification)
Control system of X-3 fresh air unit (cold coil and hot coil are separated)
X-4 fresh air unit control system (fan frequency conversion)
Control system of X-5 fresh air unit (with purification part)
2 air conditioning units
K- 1 air conditioning unit control system (single fan, no humidification, no exhaust)
K-2 air conditioning unit control system (single fan, with humidification, without exhaust)
K-3 air conditioning unit control system (double fans, no humidification and exhaust)
K-4 air conditioning unit control system (double fans, humidification and exhaust)
K-5 air conditioning unit control system (fan frequency conversion)
K-6 air conditioning unit control system (with secondary return air)
K-7 VAV air conditioning unit control system (total air volume control, common terminal)
K-8 VAV air conditioning unit control system (total air volume control, reheat terminal)
K-9 VAV air conditioning unit control system (total air volume control, fan end)
K- 10 VAV air conditioning unit (constant/variable static pressure control, common terminal) control system
K- 1 1 VAV air conditioning unit (constant/variable static pressure control, reheat terminal) control system
K- 12 VAV air conditioning unit (constant/variable static pressure control, fan end) control system
K- 13 clean air conditioning control system
K- 14 clean air conditioning control system
3 cold and heat sources and exchange stations
L- 1 control system of freezing station (main pump system)
L-2 Refrigeration Station Control System (Secondary Pump System)
L-3 external deicing and refrigeration control system
L-4 internal melting ice storage control system
L-5 heat exchange station control system (connecting system)
L-6 heat exchange station control system (interconnection system, secondary pump frequency conversion)
L-7 heat exchange station control system (mixed water system)
L-8 thermal storage control system
L-9 Refrigeration Station Control System (Air-cooled Unit)
L- 10 water source heat pump control system
4 water supply and drainage
S- 1 water supply control system of high water tank
S-2 variable frequency pump water supply control system
S-3 domestic hot water supply control system
S-4 sewage pit drainage control system
5 power distribution and dynamic lighting
D- 1 high and low voltage distribution monitoring system
D-2 elevator and escalator control system
D-3 public lighting control system
6 Control equipment, actuators and sensors
Y- 1 frequency converter control schematic diagram
Control schematic diagram of Y-2 blower and exhaust fan
Control schematic diagram of Y-3 exhaust and smoke exhaust two-speed fan
Wiring diagram of Y-4 electric water valve
Wiring diagram of Y-5 electric air valve
Wiring diagram of Y-6 temperature and humidity sensor
Wiring diagram of Y-7 flowmeter
Installation drawing of Y-8 air valve actuator
Installation drawing of actuator of Y-9 electric control valve
Installation drawing of Y- 10 air duct temperature sensor
Y- 1 1 Installation drawing of waterway temperature sensor
Y- 12 installation drawing of waterway pressure sensor
Y- 13 flow transmitter installation drawing
Y- 14 water flow switch installation drawing
Y- 15 differential pressure switch installation drawing
7 engineering example
Building Equipment Monitoring System of Shandong Weifang International Finance Building
Building equipment monitoring system of comprehensive office building of Jilin Provincial Local Taxation Bureau
Building Equipment Monitoring System of Shandong Jiaonan Electric Power Dispatching Center
Building Equipment Monitoring System of East Building of Beijing Hotel
Dalian Futures Building Construction Equipment Monitoring System Project
Monitoring System for Building Equipment of Wuhan International Convention and Exhibition Center
Building Equipment Monitoring System of Tsinghua Tongfang Science and Technology Plaza
Building Equipment Monitoring System of Building D in Tsinghua Tongfang Science and Technology Plaza Phase II
Monitoring system of building equipment in the second area of thermal reconstruction project of Great Hall of the People
Monitoring system of building equipment in the main building of CCTV new site construction project
Automatic control project of clean air conditioning system in Shandong Cancer Hospital
Equipment monitoring system of athletes' apartment building in National Olympic Sports Center
Monitoring System for Construction Equipment of Nanjing Metro North-South Line Phase I Project
Building equipment monitoring system of Changchun municipal government's new office building
S appendix
Brief introduction of Taikang control system
……