Current location - Trademark Inquiry Complete Network - Futures platform - Quality commitment letter
Quality commitment letter
Quality Commitment 1 In order to comply with relevant national laws and regulations and ensure the quality, safety and effectiveness of drugs produced by our company, as a quality agent, I hereby make the following commitments:

First, consciously abide by the provisions of the Drug Administration Law, the Regulations for the Implementation of the Drug Administration Law, the good manufacturing practice and other laws, regulations and administrative rules, so as to consciously study and abide by the law, engage in drug production activities according to law, and voluntarily bear all legal responsibilities caused by illegal production.

Second, firmly establish a sense of responsibility for quality and safety, strengthen self-discipline and quality awareness, adhere to the principle of putting the public interest first, and earnestly perform their duties.

Three, organize and standardize the enterprise quality system establishment, internal self-inspection, external quality audit, verification, adverse drug reaction report, product recall and other quality management work, and monitor the quality management system to ensure effective operation.

4. Take responsibility for product release, and ensure that the production and inspection of each batch of released products comply with relevant laws and regulations, drug registration requirements and quality standards; Before product release, issue product release audit records according to relevant requirements, and incorporate them into batch production records.

5. Failing to submit the drug quality and safety risk analysis and evaluation report, drug GMP implementation report and annual quality review and analysis report to enterprises and drug regulatory authorities every quarter and every year.

Six, when the enterprise has serious drug quality problems, it must promptly report to the drug regulatory authorities and bear the corresponding legal responsibilities.

If I violate the above commitments, deliberately evade supervision and practise fraud, all the consequences and responsibilities arising therefrom shall be borne by me.

(Seal of unit)

Signature of person in charge of quality management:

date month year

Quality Commitment 2 This unit and the main person in charge of this project promise to earnestly perform the following corresponding responsibilities during the construction of this project, and undertake lifelong quality responsibility according to law:

( 1)

Establish and improve the quality management system, equipped with corresponding professional and technical personnel, and personnel in key positions should be trained before taking up their posts.

(2)

In strict accordance with the equipment management system and operating procedures, the weighing system, mixing system and transportation equipment of ready-mixed concrete are calibrated, verified and maintained regularly to ensure the normal use of all kinds of equipment.

(3)

Strictly control the quality of raw materials, adhere to the principle of "inspection before use", and ensure that raw materials such as cement, aggregate, mineral admixture and admixture used meet the requirements of national standards.

(4)

In strict accordance with the national standards GB/T 14902-20xx Ready-mixed Concrete, Code for Design of Mix Proportion of Ordinary Concrete and Code for Acceptance of Construction Quality of Concrete Structure Engineering, the ready-mixed concrete is produced to ensure that the concrete strength meets the design requirements and the current national standards, and the factory certificate is submitted to users.

(5)

The enterprise laboratory samples the produced ready-mixed concrete according to the relevant technical standards, so as to achieve standardized operation, true records and accurate conclusions.

(6)

Ensure the continuity and timeliness of concrete transportation, and do not add water during concrete transportation. If quality problems occur due to failure to ensure continuity, users should be compensated for their losses.

(7) If the ready-mixed concrete products of this unit can't meet the requirements of relevant technical specifications, after identification and confirmation, this unit shall bear corresponding responsibilities and corresponding economic losses, and bear relevant legal responsibilities.

(8)

Improve product quality files to ensure product traceability.

(9)

Quality responsibilities and obligations stipulated by other laws and regulations.

Signature of legal representative (official seal of the unit):

date month year

Quality Commitment 3 I. Quality Assurance

1, two years for small sealed batteries (below 17AH), three years for medium sealed batteries (below 12V200AH) and five years for large sealed batteries (2V series) from the date of spontaneous shipment. Due to the quality defects of the battery itself, our factory will repair it free of charge and only charge the maintenance fee after the warranty period.

2. If users complain about the quality of our products, our factory will put forward handling opinions within half a working day (4 hours). If necessary, our factory will arrive at the scene for treatment within 24 hours if traffic conditions permit.

3. Our factory is responsible for life-long maintenance service for the products sold, and provides permanent technical support for users.

Second, the service commitment

1, 3-7 days from the second day of contract signing; Futures are 30 days, the shortest is 15-20 days, and delivery is within 10 days under special circumstances.

2. Engineering installation: If our factory wins the bid, our factory promises to send technicians to the site to assist users in installation and debugging.

3. Technical support and training Our factory provides technical lectures for users free of charge. According to the specific circumstances, the two sides can send personnel to teach or train each other. The supplier is responsible for providing technical training to the electric power maintenance management personnel, explaining the usage rules of batteries, general fault handling and electrochemical theory and principle of valve-controlled batteries.

4. Set up a special after-sales service hotline: 020-* * * * * * * *.

5. Liability for breach of contract If we breach the contract, users can complain to the relevant departments of consumption management or bring a lawsuit to the court. After arbitration, our factory will compensate the economic losses.

* * * Battery General Factory

time

Article 4 of the quality commitment to _ _ _ _ _ _ _:

Our unit was lucky enough to win the bid in the _ _ _ _ _ _ project bidding. Thank you very much for the trust of the judges and the construction unit. During the implementation of this project, in addition to responding to all the terms in the bidding documents and the contents of the performance contract, we also made the following commitments to achieve excellent project quality:

1, in the construction of this project, we must carefully organize and plan, arrange the corresponding construction organization design, and ensure the realization of the construction period.

2. In the construction of this project, we will closely cooperate with the supervision unit, strictly control the quality of materials, never cut corners, and create first-class quality with first-class construction.

3, mobilize our positive factors, small faults, major accidents do not appear, to ensure the realization of excellent engineering goals.

4. We guarantee that after the completion of the project, our construction project will be accepted by the relevant acceptance department, and our construction project will be qualified, and at the same time, we will provide the acceptance report of the relevant acceptance department to make the quality reach the qualified standard.

5. After the project is completed, we will guarantee the quality of the project for 2 years free of charge, and realize our faithful promise with high-quality service.

The above is my unit's commitment to the project quality. If we fail to meet the owner's requirements or our commitment standards during the construction process, and we are directly responsible for the quality problems in the construction process, we are willing to be fined (_ _ _ _ _ _)% of the project cost. If the circumstances are serious, those who are willing to accept the punishment of laws and regulations will automatically withdraw from the scene.

Commitment unit: (official seal) _ _ _ _ _ _ _

Legal representative or authorized agent (signature): _ _ _ _ _ _

Date: _ _ _ _ _ _ _ _ _ _ _ _

Quality Commitment Article 5 XXXXXXXX:

I am the owner of the elevator apartment in building 1. I have decided to decorate my own property, and consciously pay the decoration deposit of 1000 yuan, and hereby promise to the office of Times Square Property Management Center:

1. My house decoration consciously accepts the supervision and management of Times Square Office Property Management Center;

2. I voluntarily abide by the Agreement on the Management of Interior Decoration of Times Square → Residence → Facade and the Measures for the Management of Interior Decoration of Residential Buildings of the Ministry of Construction and other relevant decoration laws and regulations;

Three, I decorate the construction waste should be bagged from the edge of the building to the garbage dump designated by the management office, and pay the construction waste removal service fee. I would never throw construction waste down from the balcony and other places. Once you find littering, you can be fined according to the regulations. If I find a fine of 50.00 yuan, I will deduct it from the deposit.

I promise not to change it during the renovation.

And change the building structure (including beams, slabs, columns, external walls, load-bearing walls, indoor walls, etc.). ) without changing the appearance of the building;

Five, the kitchen, bathroom, floor waterproof has been closed water test and inspection, I promise not to destroy the original waterproof layer during decoration, and waterproof again, not to paper, sand, cement and other decoration garbage fall into the sewer. I am responsible for any decoration quality problems caused by decoration and water seepage in the pipes and walls of the upper and lower households. I am willing to bear all responsibilities and economic losses and deal with them in time, and the handling expenses shall be borne by me, and I will also accept the punishment and fine from the office;

Six, the installation of anti-theft net is made of white stainless steel, which will not attack the wall;

Seven, the decoration staff working in this office to ensure that obey the supervision and management of the property management center, in accordance with the provisions of the time in and out of the scene and special operations;

Eight, consciously pay the house decoration management fee of 200.00 yuan;

Nine, when I decorate, the total amount of indoor stacking materials (including coarse sand, fine sand, stone powder and cement) does not exceed 1000 kg. If it exceeds 1000 kg, after the decoration is completed, I am responsible for the cracking of beams, plates and walls, which has nothing to do with developers and property management.

Commitment:

20xx year month day

Quality commitment 6 1. Our company guarantees that all bidding products are brand-new, original, unused, genuine brand products that meet national standards, and promises not to be replaced by fake and shoddy products; In case of the above quality problems, the buyer has the right to return the goods; If direct economic losses are caused, the buyer may demand compensation from our company. The bidding products (including all spare parts) provided by our company are brand-new products produced by the original factory, otherwise our company will bear all the consequences arising therefrom.

2. Be responsible for warranty defects or failures caused by design, process or material defects within the specified quality guarantee period; Unless otherwise stipulated in the contract, in case of the above situation, Party B shall be responsible for repairing or replacing the defective parts free of charge within 30 days after receiving the notice from the user; If losses are caused, agree to compensate according to relevant regulations and bear the liability for breach of contract;

3. Our company promises not to disassemble, replace or intercept product parts; Don't fill more with less, don't fill the old with new, don't fill the bad with superior, and don't fill the fake with truth; Do not provide products that lower product grade standards or have defects.

4. Our company promises to provide free installation, debugging and simple training services for the bidding products. At the same time, we will implement strict "three guarantees" service and make service commitments that are more conducive to safeguarding the legitimate rights and interests of consumers and stricter than the national three guarantees.

5. Our company guarantees the stability and reliability of the technical performance and comprehensive quality of the bidding products provided; Ensure that the bidding products provided meet the requirements of national laws, regulations and policies such as quality, technology, environmental protection, safety, energy saving and commodity inspection standards.

6. Our company promises to provide the manufacturer's ex-factory inspection report, certificate of conformity and certificate of origin.

7. This letter of commitment is valid within the validity period of supply.

xx

20xx65438+1October 5th

Quality Commitment Article 7 In order to ensure the smooth completion of the Jinhua-Wuyi experimental section project in gas transmission pipeline project, our unit leaders make the following commitments:

1, quality objective:

Resolutely implement the quality policy of Sinopec No.4 Construction Co., Ltd. "Quality first, continuous improvement, and providing customers with high-quality projects/products and perfect follow-up services", strictly control the quality, and ensure that the quality of contracted projects meets the national acceptance standards for excellent projects.

2, the construction quality:

1) The information on the special equipment operator's certificate (welder's certificate) held by the unit welder is true.

2) Abide by the management regulations of the project department and the owner, obey the on-site management, accept supervision and inspection, and make timely rectification when problems are found.

3) In order to ensure the construction quality, our construction unit earnestly implements the relevant provisions of construction quality specifications and standards (including mandatory standards);

4) Before construction, all our staff (including unit leaders, welders, plumbers, etc. ) will seriously study technical disclosure, until every worker is familiar with the operation process of each working procedure, the requirements of welding construction and joint repair construction, and carry out construction in strict accordance with the operation process, and self-check the construction quality. If the self-inspection is unqualified, the previous procedure will not be accepted, and the next procedure will not be handed over.

5) If each working procedure is not inspected or does not meet the quality requirements, the next working procedure will never be constructed to ensure the engineering quality.

6) Abide by professional ethics, be honest and trustworthy, and do not practise fraud or sabotage.

I will strictly abide by the above commitments, and I am willing to accept the corresponding punishment if I violate them. Those who cause serious consequences are willing to bear corresponding economic and legal responsibilities.

Commitment (signature): xxx

Person in charge (signature): xxx

Xx,xx,XX,XX

Quality Commitment Article 8 Project Name:

I promise to take full responsibility for the engineering quality and the design life of the building during the construction. Earnestly perform the following duties in the process of engineering construction:

1, strictly abide by relevant laws, regulations and standards, and earnestly perform the responsibilities and obligations stipulated in the construction project contract.

2. Contract or entrust the project to construction, supervision, survey, design, construction drawing review institutions and testing units with corresponding qualifications, and the construction project shall not be dismembered, forcing the contractor to bid below the cost price and arbitrarily compressing the reasonable construction period (cycle).

3, to survey, design, construction, supervision, construction drawing review institutions and testing units to provide true, accurate and complete original information related to the construction project.

4. Submit the survey and design documents to an examination institution with corresponding qualifications for examination, and provide qualified survey and design documents to the construction site in time. If there is any survey and design change, the relevant provisions on the management of survey and design change shall be strictly implemented.

5. Strictly abide by the basic construction procedures, go through the quality supervision procedures before construction and obtain the construction permit.

6. It is not allowed to express or imply that survey, design, construction, testing and other units violate the mandatory standards for engineering construction or use unqualified building materials, building components and equipment to reduce the quality of the project.

7, after the completion of the project, according to the provisions of the organization survey, design, construction, supervision and other relevant units for acceptance, and accept the program supervision of engineering quality supervision institutions. Within fifteen days after the acceptance of the project, the completion acceptance formalities shall be handled.

8. Organize the documents in time, establish and improve the project files, and hand over the construction project files to the urban construction archives management department within three months after the completion acceptance.

9, urge the survey, design, construction, supervision and other relevant units to implement the quality responsibility, for the project without supervision, organize the relevant personnel of the construction unit to perform the duties of the supervision unit.

10, other quality responsibilities stipulated by laws, regulations and standards.

This letter of commitment is made in triplicate, one of which shall be submitted to the quality supervision organization when going through the supervision formalities, one of which shall be submitted to the urban construction archives management department together with the archives after the completion and acceptance of the construction project, and one of which shall be kept by the construction unit.