In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reach an agreement on the construction of this construction project and conclude this contract.
Article 1 General situation of the project
Project name: _ _ _ _
Project location: _ _ _ _
Article 2 Term of Contract
Commencement date: after signing the contract, the project will start within two days after receiving the advance payment.
Duration: 20 days for pipeline maintenance and 5 days for compressor replacement.
The total calendar days of the contract duration is 20 days.
Article 3 Maintenance Contents
____________________。
Article 4 Contract Price and Payment Method
Contract amount (in words): one hundred thousand yuan only (RMB) 65,438+000,000 yuan. Payment method: 30% of the contract amount shall be paid as the commencement advance payment after the contract is signed, 30% of the contract amount shall be paid within three days after the compressor is replaced, 30% of the contract amount shall be paid after the project is completed, and the balance shall be paid one year after the contract.
Article 5 Party B promises to Party A to carry out the construction and completion in accordance with the contract, and shall undertake the project quality warranty responsibility within the quality warranty period.
Article 6 Party A promises to pay the contract price and other payables to Party B within the time limit and manner agreed in this contract.
Article 7 Liability for breach of contract
If one party breaches the contract, the other party has the right to terminate the contract, and the liability for breach of contract shall be borne by the breaching party.
Article 8 Adhere to the principle of safety first, and all safety losses in the construction process shall be borne by Party B. ..
Article 9 This contract shall come into effect as of the date of signing, and each party shall hold one copy.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model contract of the second maintenance unit
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
According to the Interim Measures for the After-sale Management of Public Housing and the Interim Measures for the Sale of Public Housing and related documents, Party A and Party B sign this contract on the management and maintenance of the housing purchased by Party A..
1. Party A agrees to entrust Party B to repair the house located atNo. 1, a branch lane in the city (county) district (street) with a building area of square meters.
2. Party B shall, in accordance with regulations, combine and store the first-phase housing maintenance fund provided by Party A and the one-time housing maintenance fund provided by the selling unit, and use it exclusively for the maintenance and updating of Party A's housing parts and equipment, and make rational use of the housing maintenance fund. Party A is responsible for supervision.
Three. Party A agrees to pay Party B an annual and monthly management fee of RMB yuan in accordance with the Interim Measures for After-sale Management of Public Housing, Detailed Rules for the Sale of Public Housing and the requirements of socialized management. Party B is used to manage personnel expenses and office expenses.
Four. Party B shall provide high-quality paid services for unused parts or equipment of the house maintenance fund. Party A agrees to pay the maintenance fee according to the regulations and provide convenience for Party B's maintenance (including common parts and adjacent rooms).
Verb (abbreviation of verb) Party B shall be responsible for the maintenance of Party A's house and ensure the normal use of the parts and facilities used by * * *. * * * Equipment and * * * facilities are artificially damaged, and the damaged person shall be responsible for repairing or compensating.
6. According to the Interim Measures for the After-sale Management of Houses, when the house maintenance fund is insufficient to pay the maintenance expenses, Party A agrees to pay the house maintenance fund according to the area. If Party A delays the payment of the maintenance fund, resulting in Party B's failure to maintain the house and equipment in time, Party B will not be liable for the resulting economic compensation.
7. This contract is made in triplicate, one for each party and one for the management department of Party B.. This contract shall come into effect after being signed and sealed by both parties.
Eight. Other matters that need to be supplemented:
Party A:
Party B:
Date of signature: year month day.
Model contract for maintenance unit 3
Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A * * * owns _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Rule number one. Party A agrees that Party B is the designated vehicle maintenance unit of _ _ _ _ _.
Article 2. Service scope of Party B
Vehicle overhaul, maintenance at all levels, minor repairs, annual inspection of vehicles and other services related to automobile maintenance.
Article 3. Procedures for sending and handing over maintenance vehicles.
Party B shall undertake the vehicle maintenance business according to the arrangement of the vehicle management leader of Party A. After the vehicle maintenance is completed, Party B shall provide the printed fixed-point maintenance settlement list and submit it to the maintenance unit for review.
Article 4. Maintenance time
Automobile minor repairs, primary and secondary maintenance should be sent for repair within _ _ _ _ _ hours, and engine tertiary maintenance should be sent for repair within _ _ _ _ _ _ hours; Overhaul the engine _ _ _ _ days before leaving the factory; Party B shall bear a penalty of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 5. maintenance service
Party B shall provide _ _ _ _ _ hours service (including holidays), and the vehicle shall be maintained as required. When Party B is on the road to repair the rescue vehicle, the city will be exempted from the rescue fee.
Article 6, Quality Assurance
Our factory implements three guarantees (return, exchange and compensation) for the quality of automobile maintenance, and the quality standards are strictly in accordance with the quality standards of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ The warranty period of automobile overhaul vehicles is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 7. Rights and obligations of Party A
1. In view of the long-term cooperative relationship established between Party A and Party B, Party A has the right to ask Party B to give priority to maintaining the vehicles maintained by Party A. ..
2. If the finished car is found to be unqualified or inconsistent with the "maintenance list", Party A has the right to ask Party B to rework it for free until it meets the requirements.
3. Party A shall settle the vehicle maintenance fee with Party B according to this contract.
Article 8. Rights and obligations of Party B
Party B has the right to require Party A to settle the vehicle maintenance fee on time; Party B shall give priority to providing maintenance services for vehicles sent by Party A for repair; Party B shall not transfer the obligations agreed in this contract to any third party; Party B shall complete the maintenance work within the time specified in the "Maintenance Delivery Form"; Party B shall ensure the safety of vehicles to be repaired; Party B shall guarantee the maintenance quality; Party B guarantees that all accessories are brand-new original factory accessories that meet the national quality standards, and shall not replace automobile accessories with inferior ones or at will;
Article 9. settlement method
Settle _ _ _ _ times every quarter. Party B shall issue a statement for each maintenance in the current period to Party A. ..
Article 10 Validity of Contract
This contract is valid for _ _ _ _ years, from the date of signing this contract to _ _ _ _ _ _ _.
Article 11 Disputes and solutions
Any dispute arising from the performance of this contract shall be settled through negotiation as far as possible. If negotiation fails, either party has the right to bring a lawsuit to the people's court where Party A is located.
Article 12 For matters not covered in this contract, Party A and Party B may sign a supplementary agreement through consultation. The supplementary agreement has the same legal effect as this contract.
Article 13 This Contract is made on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A (official seal): _ _ _ _ _ _ _ _ _ _ _ Party B (official seal): _ _ _ _ _ _ _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _ Legal representative (signature): _ _ _ _ _ _ _
Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model contract of the fourth maintenance unit
Party A: Party B:
This agreement is agreed by both parties through consultation. In order to ensure the normal use of weak current intelligent system equipment, Party A entrusts Party B to maintain the existing weak current intelligent system and peripheral equipment, and through friendly negotiation, both parties sign the following maintenance contract:
I. Term of the contract:
The term of this contract is from year month day to year month day.
Second, the service content
Regular maintenance and troubleshooting of weak current system equipment. See the attachment for the maintenance list.
Third, the service requirements
1. In order to ensure the normal operation of Party A's weak current system, Party B will assign technicians to serve Party A. ..
2. Party B shall arrive at Party A's company within 24 hours (except in special circumstances) after receiving Party A's equipment failure notice to eliminate the failure as soon as possible;
3. When Party A's system fails and needs to be replaced, Party B shall provide the configuration at the lowest market price and be responsible for installation;
4. During the contract period, Party B shall visit regularly (at least twice a month) for maintenance and optimization.
5. If special operations (such as adding points and wiring) are notified outside the contract, Party B will quote separately.
6. If the total amount of accessories required for Party B to replace the equipment once during the maintenance process does not exceed 65,438+000 yuan, Party B shall be responsible for the payment. If the total amount of spare parts for equipment replacement exceeds RMB 65,438+000 at one time during maintenance, Party A will pay separately.
Four, maintenance costs:
The maintenance items of Party A's weak current system include: monitoring system, conference system, background music system, parking lot management system, ups system and lightning protection system. See the annex for a detailed list. Based on the above situation, through negotiation between Party A and Party B, Party B charges Party A the maintenance fee of _(6500.00) Qian Lu Wu Bai Yuan only _ _ _ _ _ _ _ _, with a term of 12 months, and * * is seventy-eight thousand yuan only (78,000.00).
Verb (abbreviation of verb) payment method:
The maintenance fee shall be charged by Party B every six months: 50% of the total amount (36,000.00 yuan) shall be paid within ten days after the contract is signed and 50% of the total amount (36,000.00 yuan) shall be paid within ten days after the contract expires.
The responsibility of both sides of intransitive verbs
(1) Party A's responsibilities
1. In case of hardware or software failure, Party A shall notify Party B in time.
2. Party A shall not dismantle or change other connections of the equipment at will, and shall not let a third party intervene in the services under this contract;
3. Party A shall not require Party B to provide illegal services during the service period;
4. In the maintenance process, if Party A has important data to save or process, it shall notify Party B first, otherwise Party B will
For the loss of important data caused by Party A's ignorance, Party A shall not bear any responsibility, but shall bear it by itself. However, Party B shall try its best to repair or restore the data or equipment lost by Party A: if Party A's equipment or data is damaged due to Party B's reasons; Party B shall be responsible for the repair or restoration; The required expenses shall be borne by Party B. ..
(2) Party B's responsibilities
1. During the maintenance process, Party B shall keep Party A's business information confidential and shall not disclose it to a third party;
2. During the maintenance period, Party B shall meet the legal requirements of Party A and ensure the normal operation of the weak current system and other related equipment.
Seven. any other business
This contract is made in duplicate, one for each party, with the same legal effect, and shall come into force after being signed and sealed by both parties. Either party shall not change or cancel it without authorization. Unilateral dissolution or modification of this contract shall bear all relevant responsibilities.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model contract of the fifth maintenance unit
Employer (hereinafter referred to as Party A):
The Employer (hereinafter referred to as Party B):
According to the Economic Contract Law of the People's Republic of China, combined with the specific conditions of the project, this contract is signed for the maintenance project of No.71of Huaihai South Road in Huai 'an City, in order to clarify the responsibilities of the project and both parties, and in line with the principle of mutual cooperation to ensure the smooth completion of the construction project.
First project
(1) Project Location: No.71Huaihai South Road, Huai 'an City
(II) Project Content: Water Pipe Maintenance
(3) Contracting method: quantity contracting.
Article 2 The project cost is RMB 1000 Wu Bai dollars.
Article 3 the contract time limit for a project
1. The total construction period agreed by both parties is 1 day.
Commencement date: 20xx165438+1October 6, and completion date: 20xx165438+1October 6.
2. In case of any of the following circumstances, the construction period may be extended upon the visa of Party A's representative.
(1) Force majeure caused by natural disasters (typhoon, fire, earthquake), etc.
(2) Due to the modification of design drawings, the workload is increased and affected.
(3) due to water, electricity and other reasons. More than six hours.
(4) When Party A is affected due to lack of financial resources or failure to prepay the project preparation fee and project progress payment as stipulated in the contract.
⑤ Party A fails to hand over the construction site and connect the construction water and electricity five days before the commencement of construction as stipulated in the contract.
Article 4 Project Quality Standards and Warranty Period
(a) engineering quality standards should be accepted according to the current national construction specifications.
(2) The project warranty shall be implemented according to the relevant regulations of construction, and the warranty shall be calculated from the date of signing the completion acceptance.
(3) If the project within Party B's construction scope is damaged due to construction quality problems, Party B shall repair it free of charge.
Article 5 Supply of Materials and Equipment
(1) The materials needed for the project shall be purchased by Party B according to the brand and model specified by Party A. ..
(two) the materials and equipment are attached with the factory certificate, and the materials and equipment have objections to the inspection.
Article 6 Payment Terms
After the project is completed, Party A will make acceptance and pay after it is qualified.
Article 7 Scope of Responsibility
(1) Party A's responsibilities:
1, responsible for solving construction and domestic water, electricity and roads;
2. Organize the project completion acceptance in time;
3. Handle the completion acceptance within the time limit stipulated in this contract, and pay the project payment to Party B..
(II) Party B's responsibilities:
1. Ensure the construction quality according to the construction safety specifications, carefully construct, and finish it on time. Party B shall be responsible for any construction quality and safety accidents during the construction period.
(1) The contractor shall strengthen the safety education on fire prevention and theft prevention for on-site construction personnel, and the construction personnel shall not violate the law and discipline at the construction site. If you have any problems, you will be at your own risk.
(2) Party B's on-site construction personnel shall unconditionally obey and abide by all the management regulations of the construction site, unconditionally obey the on-site public security management, and properly handle the relationship between adjacent units, otherwise all consequences will be borne by themselves.
(3) If the original buildings and fire control facilities are damaged during the construction period, Party B shall be responsible for all the consequences.
2. Responsible for the procurement and storage of materials and equipment;
3, responsible for cleaning up the construction waste in time, after the project construction, responsible for cleaning up the construction waste.
Article 8 Other matters
(1) After the contract is signed, when Party A requests to add or change projects, it must follow the following principles:
1. The "Design Change Notice" shall be issued after full consultation by both parties.
2. After Party B submits the design drawings, quotations or project adjustments, Party A shall sign and seal them respectively for approval;
3, increase or change the content of the required materials must be implemented;
(2) Any loss caused by improper construction of Party B's personnel shall be borne by Party B;
(3) If Party A does not have the construction conditions, Party A shall bear the responsibilities and compensate Party B for the losses caused by the shutdown;
(4) Matters not covered in this contract shall be studied and supplemented by both parties and have the same legal effect as this contract. Any dispute arising from the execution of this contract shall be settled through friendly negotiation. If negotiation fails, it may be submitted to the relevant arbitration institution for adjudication.
(V) This contract shall come into effect after being signed and sealed by both parties, and shall become invalid after the project is completed and accepted and the project payment is settled.
Article 9 This contract is made in duplicate, with Party A and Party B holding one copy respectively, all of which are equally authentic.
Signature of the person in charge of Party A: