These Provisions are formulated in the Measures for Compensation and Resettlement of Land Requisition and Demolition in Qingcheng District. Second requisition of Yuzhong District, Nan 'an District, Jiulongpo District, Shapingba District, Jiangbei District,
This book is applicable to the compensation for young crops and attachments of collective land in dadukou district, Beibei, Banan and Yubei districts.
Rules. In addition to the above areas, other districts, cities and counties may refer to the basic principles of these Provisions and combine local conditions.
The actual area, formulate compensation standards, and report to the Municipal People's government for the record. Article 3 No compensation shall be given in the following circumstances: (1) Houses without land use right certificates and other legal warrants; (two) after the issuance of the "Notice", the pre-trial office of construction land will rob to plant and insert flowers, trees and green spaces.
Miao and rushing to build buildings (structures), etc. (three) leased collective land and illegally occupied buildings (structures); (four) beyond the approved use period or although there is no prescribed use period, it has been used for more than two years.
Demolition of buildings (structures) on the land in time; (5) Natural and wild shrubs. Article 4 The compensation for young crops shall be calculated according to the actual planting area, and the compensation for buildings (houses) shall be calculated.
The closed area of the retaining wall shall prevail, and the structure shall be calculated in real terms. Article 5 Compensation standard for young crops and attachments 1 and compensation standard for young crops (see Annex1); Two. Compensation standards for attachments: (1) Compensation standards for buildings (houses) (see Annex II); (2) Compensation standard for structures (see Annex 3); (three) forest compensation standards (see table four). Article 6 The expropriation of sporadic collective land shall be compensated per mu according to the standard of grain crops 1 ratio 1 in this area.
2 times the subsidy for land acquisition units to adjust contracted land and develop collective economy. Seventh levy (occupation) of water conservancy projects and their ancillary facilities and forest land recognized by the government, according to
The relevant provisions of this Municipality shall be compensated. Eighth land acquisition is not the object of housing demolition of agricultural personnel can refer to this.
If it is really necessary to build a house in a different place, it shall be solved by the local economic cooperative.
According to the relevant regulations, it is allocated to the homestead, and the demolished people build their own houses. Farmers' housing is not within the scope of land acquisition, and compensation and resettlement for demolition shall not be granted. but
The area of the homestead occupied by the house shall prevail (the area determined by the collective land use certificate shall prevail).
According to the compensation standard of 3 to 5 times per mu of grain crops in this area, it will be given to the rural collective economic group.
Weave a one-time payment of comprehensive compensation for farmers' occupation of homestead. After compensation, the farmers all agreed.
Enjoy the same treatment as local agricultural personnel in using public facilities and public welfare undertakings. Silver fruit
When the homestead needs to be requisitioned for residential construction, the compensation and resettlement for house demolition shall be based on the amount of house demolition at the time of requisition.
This is stipulated to be dealt with. Ninth for the relocated households within the specified time, the relocation subsidy is calculated and paid by each household at one time.
Every household with 3 people or less is in 300 yuan, and every household with more than 3 people is in 400 yuan. Temporary transitional households are distributed in two times. Tenth due to construction needs, the relocated households have to move ahead of the transition, from the date of transition to.
The household registration at the time of approval of land acquisition shall prevail, and the relocation transition fee shall be paid. Is a unified placement, according to the actual.
Time calculation, 50 to 80 yuan per person per month; Is a self-built housing, one-time payment of 3 per person.
00 to 500 yuan. Eleventh land acquisition units (excluding land acquisition member households) of hydropower facilities.
Appropriate compensation for international installation fees. Twelfth closed-circuit television lines, natural gas installation according to the actual installation cost compensation. Telephone frequency
According to the regulations of the telecommunications department, the transfer fee is compensated. House decoration will not be compensated. Thirteenth enterprises that need to be relocated within the scope of land acquisition shall be handled according to the relocation construction.
The compensation fee is calculated according to the replacement cost of the house, and the structures and trees are in accordance with the standards stipulated in Article 5 of these Provisions.
Make compensation. After the house is compensated according to the replacement cost, the original house belongs to the state and is responsible for the land acquisition management department.
Settings. The land relocated by the enterprise shall be subject to the actual area of the original enterprise and levied according to the local average level at that time.
Calculation and composition of land cost. In the process of relocation, the movable property equipment consumption and relocation expenses of the relocated enterprise are combined into relocation loss expenses, relocation loss
The loss is calculated from 5% to 10% of the depreciated net value of the normally used movable equipment. Agreed relocation
During the period, if the loss of work stoppage is caused by relocation, the registered employees during the actual production stoppage of the relocated enterprise may be referred to.
The daily standard wage is determined by the relocation enterprise and the land management department. Fourteenth buildings (houses), structures and other attachments within the scope of land acquisition after compensation
The disposal of the object shall be handled in accordance with the provisions of Article 12 of the Measures for Land Acquisition, Demolition and Resettlement in Chongqing. Fifteenth national staff in the land acquisition work, bribery, dereliction of duty.
, abuse of power, extortion, according to the "Chongqing land acquisition and relocation compensation and resettlement measures" in Chapter VI.
Relevant provisions on punishment. Sixteenth young crops attachment compensation standards are divided into three categories, among which, urban construction planning
A standard is applicable to this area; Economically developed towns (streets) outside the urban construction planning area.
Road) is applicable to the second standard; The three types of standards are applicable to other fields beyond the above scope. The specific application areas of various standards are determined by the people's governments of various districts according to the economic differences in their respective jurisdictions.
, streets, towns as a unit, clear the scope and amount of application, and report to the Municipal People's government for the record. Seventeenth these Provisions shall be interpreted by the Chongqing Municipal Bureau of Land and Resources. Eighteenth the provisions shall come into force as of September 15th, 1995. Schedule 1: standard unit of young crops compensation: yuan/mu ┏ ┏ ┏ ┏ ┏ ┏ ┏ ┏ ┏ ┏ ┏ ┏.
┃┃┃┃ Calibration
┃┃┃┠┬┬┬┬┬┬┬┬┬┬—
┨┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃
Vegetables ┠┼┼┼┼┼┃
┃ 1300- 1600 │ 1200- 1500 │ 1 100- 1400 ┃┠───┰
╂╂┼┼┼┼┃┃┃┃┨┃┃┃.
┃1000-1300 ┃ 900-1200 ┃ 800-100 ┃ grain ┃.
┠┼┼┼┼┼┼┃┃┃┃┃┃┃┃┃┃┃6
00-800 │ 500-700 │ 400-600 ┃┗━━━┻━━━━┻━━━
━ ━ ┛ Description: 1. Crops on the land designated by the government for grain seed production may be compensated according to the grain compensation standard.
Calculate the compensation fee by floating 30%; ; 2. Vegetables include a variety of crops. 3. Special fish ponds are compensated according to the water area (including fry loss), and the compensation standard is the same as that of vegetables.
To. Schedule 2: Standard unit of housing compensation: RMB/m2 ┌┬┬┰┰—
──────────┐│ │ ┃
Compensation for single price, structural category and housing structure
────┬────┬────┤│ │
┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
╂╂┼┼┼┼││┤││││││││││││││││││││947
Cover making ┃140-160 │130-150 │120-140 ├-
╂╂┼┼┼┼ │ Brick wall (
Stone) tile cover ┃130-150 │120-140 │130 │ ├-
───────────╂────┼────┼────┤│
│┃┃┃┃┃┃100-120 │ 90-10 │ 80-100 │
├────────────╂────┼────┼────┤│
Brick and wood structure ┃ Brick wall (flaky) tile cover ┃ 80- 100 ┃ 70-90 ┃ 60-80
││ ├────────────╂────┼────┼──
── ┤ │ Brick wall tile surface (including linoleum and wave fiber) ┃ 70-90 │ 60-80 │
50-70 │├────┼────────────╂────┼───
┼┤│││┃┃┃┃┃││││┃┃┃┃┃││││││││││947
0-90 │ 60-80 │ Earth wall structure ├ ├ ╂ ╂-│
┼┼┼┼┤│││┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
70 │ 40-60 │ 30-50 │├────┼────────────╂
┼┼┼┼│││││││││││││││││││││││││947
┃ 30-50 │ 20-40 │ 10-30 │ Jane's 30-50-30-30-
╂╂┼┼┼┼┼┼┼┤ │ Simple hut
┃ 30-40 │ 20-30 │ 10-20 │└────┴─────
┸┴┴┴┴┘ Description: 1 The height of the building is below 2.4m, and the height is 1.5m (inclusive).
On the other hand, compensation is calculated according to 70% of similar standards; 2. If the building height is lower than1.5m, the compensation shall be calculated according to 50% of the similar standard; 3. Prefabricated board is used as the floor of multi-storey tile house. If a layer of tile-roofed house is used, it should be supplemented by tile-roofed house.
━━━━━━┯━━━━━━━━━┓┃ │ │ │
Single price/name/name
Structure │ Unit├┬┬┬┬┬┬┤
┃┃┃┃│││││││││││││││││││││││││947
┃ Note ┠ Three standards ─1.1.1.1.1. . 1 . 1 . 1 . 1 . 1 . 1 . 1 . 1 . 1 . 1 . 1 . 1 . 1 . 1
┼┼┼┼┼┼┼┼┼┼┃┃││││┨┃┃
Stone square meters, 35-50, 30-45, 25-40, collective land reclamation and soil improvement.
, ┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃9
30 ┃ ┃ ┃ (including fish ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃)
│ 25-40 │ 20-35 │ Compensation ┃ ┃ Tangkan) ┃ Earth fence
│ Square meters │ 4-6 │ 3-5 │ 2-4 │
┃┠───┼────┼───┼─────┼─────┼─────
┼┼┼┃┃┃┃┃┃││││││││││││││││││││947
┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
│ │ │ No compensation, water ┃ ┃
│ Stone) Mud knot │ Square meter │ 50-60 │ 40-55 │ 35- 50 │ Mud knot
Pavement thickness10 ┃┃┃┃┃┃┃┃┃┃ 30-40 ┃┃┃┃24-
35 │ 20-30cm ┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
│12-14 │10-/3 │10/2 ┃┃┃┃┃┃┃┃
(Tractor lane) │ │ │ │.
┃┠───┼────┼───┼─────┼─────
┼┼┼┼┃┃┃┃┃┃┃┃Block 40
00-5000 │ 3500-4500 │ 3000-4000 ┃ Waste bricks and tiles, lime kilns ┃ lime kilns ┃
│ │ │ Not allowed.
Return ┃ ┠ ┼ ┼ ┼ ┼ ┼ ┼ ┼—
┼┼┼┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
│ 30-40 │ 25-35 │ Well: calculated by volume ┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃
│ Square meters │ 20-30 │15-25 │10-20 │ Not after compensation.
┃┃┃┃┃││││││││││││││││││││││││947
│ Calculation of material compensation ┃┠┼┼┼┼┼┼┼┼┼—
┼┼┼┼┼┼┼┼┼┼┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃
Plot180-200 │190 │160-180 ┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃
Lord.
, scheduled to move, overdue ┃ ┃ ┃ ┃ ┃ ┃
┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
│ 280-300 │ 270-290 │ 260-280 ┃ ┃ ─
─┼────┼───┼─────┼─────┼─────┼───
┨┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
│ 3-4 │ Earth dam: refers to the formally formed ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
8- 10 │ 7-9 │ 6-8 │ Sun dam or courtyard dam, informal ┃┃┃┃
Concrete │ square meters │ 4-5 │ 3-4 │ 2-3 │ shapeless zero.
Star patch ┃ ┃ ┃ soil ┃ ┃ square meter ┃ ┃ 2 ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
2 ┃┃┃┃┃┃┃│││││ │ │ │ │ │ │ │ │ │ │ │.
┃┃┃┃┃┃┃┃┃┃┃┃┃┃
│ │ │ No compensation is calculated.
┃┠───┼────┼───┼─────┼─────┼───
──┼─────────┨┃ │ │ │
┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ 94
Square meters │ 25-35 │ 20-30 │ 15-25 │ and bird's nest-shaped cesspits are on display.
┃┃│││││││││││││││││││││││││││947
There is no compensation. According to the standard ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
2-4 │ 1-3 │ Septic tanks, water storage tanks ┃ ┃ cement soil │
│ │, its materials are no longer compensated. ┃┠─
──┼────┼───┼─────┼─────┼─────┼──
┨┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
40-50 │ 30-40 │ 25-35 ┃ Special Canal ┃ ┃
│ Concrete) │ 20-25m2 │15-20 │10-15 │
┃┠───┼────┼───┼─────┼─────┼
┼┼┼┼┃┃┃┃│││││││││││││││││││││947
│ ┃ ┃ Pole ┃ ┃ electricity
Rod cement root 80-90 75-85 70-80
┃┃┃ Square bar (┃┃┃┃)
│ Telephone poles and wires refer to villages and towns ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
│ 35-45 │ 30-40 ┃ ┃ Round rod
The following collective and individual voting
┃┠───┼────┼───┼─────┼─────┼────
-┤ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃
1 │ 1 │ capital ┃┃┃┃┃┃ wire ┃┃
│ │ │ │ ┃
┃┃┃┃│││││││││││││││││││││││││947
┃┠───┼────┼───┼─────┼──
┼┼┼┼┼┼┼┃┃┨┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃
│ 2 │ 2 │ 2 │ excluding municipal pipe network ┃ ┠-
──┼────┼───┼─────┼─────┼─────┼──
┨┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
00 │ 2000-2500 │┃┃┃┃┃┃┃
│ │ │ ┃┗━━━
┷━━━━┷━━━┷━━━━━┷━━━━━┷━━━━━┷━━━━
┛┛┛ Description: 1. According to the compensation standard of septic tanks, the normal use of biogas digesters will increase by 10 yuan per cubic meter.
Compensation; 2. The original structures after compensation shall be handled by the land-expropriated units and individuals themselves. Schedule 4: Forest Compensation Standard
━━━━━━━━━━┯━━━━━━━━━┓┃ │ │
Single price/name
Call │ Structure │ Unit ├ ┬ ┬ ┬ ┬.
┃┃┃┃│││││││││││││││││││││││││947
│ standard notes ┃ ┼ ┼ ┼ ┼ ┼ ┼ ┼ ┼ ┼ ┼—
┼┼┼┼┼┼┃┃┃┃┃││││││││││││││
│ │ │ Regardless of tree species, the diameter is ┃ ┃.
Miao Di without planting, 0.8- 1, 0.7-0.9, 0.6-0.8, trunk off the ground 1.
M disposal┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃2-4 cm (including m2 │1.5-0.2 │1.7).
5│││16 cm above, 2 cm per ┃┃┃ fruit tree) ││ plants │ 18-20
│17-19 │16-18 │ increased by 2 cm, and the completion ┃┃┃┃┃┃┃┃┃┃││ φ 4-7 cm was added (below).
Plants │ 20-30 │19-25 │18-20 │ 20 yuan, orchard according to ┃ ┃.
│ ditto) │ Plants │ 30-50 │ 25-45 │20-40 │ Last year's output value
2 times┃┃┃┃┃┃┃┃┃7-10cm │ strain │ 50-80 │ 45-75 │40-7.
0 │ Calculate the compensation fee. ┃ ┃ ┃ ┃10-13cm ┃ strain ┃ 80-10
│75- 105│70- 100│┃┃│φ 13- 16cm│
│ │ │ │ ┃┠──
─┼─────┼───┼────┼────┼────┼─────
┨ ┃ Banana ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
-2.0│ 16 or more, but ┃ ┃ 5- 10 │ nest │ 25-40.
│ 20-35 │ 15-30 │ merged into corresponding regulations ┃ ┃ (octagon) │10/5.
Nest 35-50 30-45 25-40 lattice calculation
─┼─────┼───┼────┼────┼────┼─────
┨┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
2.0 ┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃
│1.0-1.5 │1.8-1.2 │ For every increase in 1cm, we should increase Grape ┃ ┃/kloc.
│ 5-6 │4.5-5.5 │ 4-5 │ 10 yuan ┃ ┃ ┃.
│ φ 2-3 cm │ strain │ 6- 10 │5.5-9.5 │ 5-9 │.
┃┃┃┃┃┃┃┃┃│ 3-4 cm │ strain │10-20 │ 9-1
8 │ ┃┠───┼─────┼───┼────
┼┼┼┼┼┃┃┃┃││││││││││││││││││││947
Every additional mulberry tree is planted │1.5-2.0 │1-1.5 │10 cm.
Trees ││ φ 2-5cm │ plants │ 2-5 │1.7-4.5 │ 3-4 │1cm to increase 5 yuan.
┃┃┃┃│││││││││││││││││││││││││947
│ ┃ ┃ ┃ 8-10 cm │ strain │ 10-20
│9.5- 19 │ 9- 18 │ ┃┠───┼─────┼
───┼────┼────┼────┼─────────┨┃
Pieces of saplings, square meters, 4-5, 3.5-4.5, 3-4, with trunks off the ground.
Surface1.2m ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ │ │ │ │ │ │ │ │ │ │ │ │ │
.6 │ with ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
│1.8-4.5 │1.6-4 │1cm, and 5 yuan, belonging to to to ┃ ┃ ┃ ┃ ┃ ┃ φ 5-10cm.
Plants │ 5-9 │4.5-7.5 │ 4-7 │ Precious tree species can be improved by one.
│ φ 10- 15cm │ strain │ 9-18 │ 7.5-15 │ 7-13 │ specification calculation supplement.
Compensation ┃ ┃ ┃15-20cm ┃18-30 ┃15-26 ┃13-2.
3 │ ┃┠───┼─────┼───┼────
┼┼┼┼┼┃┃┃┃││││││││││││││││││││947
Plants │ 7-12 │ 6.5-1│ 6-10 │ include walnuts, millet, palm oil and dried fruits.
Trees │5- 10 cm │ plants │12-20 │1-kloc-0/9 │18 │ olive Gleditsia sinensis, etc.
,16cm ┃ ┃ ┃ │10-15cm │ strain │ 20-30 │19-29 │18-2.
8 │ Every increase of 1cm,10 ┃┠┼┼┼┼┼—
┼┼┼┼┼┃┃┃┃┃┃┼┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃947
│ │/kloc-more than 0/0, more than 40 ┃ ┃ kindness.
Bamboo │ below the root │ cage │ 20-40 │15-35 │10-30 │ as the case may be.
Into a big cage (21cage-30-50-25-45-20-
40 ┃┃┃┃┃-40) ┃┃┃
│ │ │ ┃┠───┼─────┼
───┼────┼────┼────┼─────────┨┃
│ ││││││││││││││││││││││││││││94
Straight male ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ │ │ │ │ │ │
│ ┃ ┃ ┃ ┃ ┃ ┃ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │
14-24 │ 13-23 │ ┃┠───┼─────┼─
──┼────┼────┼────┼─────────┨┃
│ │ nest (20-30 │ │ 20,50)
The root is ┃┃ Eichhornia crassipes ┃ root) ┃ nest ┃ 8-13 │ 7-12 │ 6-11.
┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃ (30-50- 10-20)
9-19 │ 8-18 ┃ lattice calculation ┃ ┃ root)
│ │ │ │ ┃┠───
┼─────┼───┼────┼────┼────┼──────
┨ ┃ ┃ Evergreen ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃.
│ ┃┠───┼─────┼───┼────┼
┼┼┼┼┼┼┼┼┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃┃.
Square meters │ 5-6 │ 4-5 │ 3-4 ┃ potted flowers will not be compensated.
│ │ Mubenhua │ Plants │ 3 │ │ 2 │ 1.5 │ │.
┃┃┃┃ (including herbaceous flowers) ┃┃┃┃
│ ┃┗━━━┷━━━━━┷━━━┷━━━━┷
┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┛ ┙ ┙ ┙ ┙ Wang Wei, Land Department of Hebei Jigang Law Firm.