Current location - Trademark Inquiry Complete Network - Tian Tian Fund - A Summary of Li Qing Studies
A Summary of Li Qing Studies
[1] Theoretical research and application of evaluation on the integration development level of informatization and industrialization (6 1 174 168), National Natural Science Foundation, 20121-2015.

[2] Close-range high-precision relative navigation and guidance technology for indoor environment, XX Pre-research Fund, July 2065438+June 2065438, project leader.

[3] Research on control allocation and reconfiguration technology of advanced multi-control fighter (20 100758002), Aviation Fund, 20 10 -20 12, project leader.

[4] Research on Performance Evaluation of Informatization in Industrial Fields at Home and Abroad (PGYJ02), Information Promotion Department of the Ministry of Industry and Information Technology, August 2065438+00—February 2065438 +065438, project leader.

[5] Research on the Construction of National Engineering Science and Technology Think Tank-Research on the Development of Consulting Work, initiated by the Ministry, 20 1 1 month-20 1 2 years1February, mainly completed by people.

[6] Research on the Theoretical System, Overall Framework, Index System and Key Technologies of the National Major Special Collaborative Supervision Information System (approval number: 20 10BAH56B0 1), the National Science and Technology Support Plan, September 2065438-September 2065438+February 2002, mainly completed people and projects.

[7] Research on Key Technologies of Redundancy Configuration of Flight Control System, National Major Special Sub-project, 2009 -20 10, project leader.

[8] Research on Problems and Countermeasures of Recycling Industry for Asian Manufacturing Industry (Youth C 1), Tsinghua University Asia Research Center, project leader.

[9] Flight management guidance, performance algorithm research and simulation analysis, enterprise project, 20 12 1 month-201March September, mainly completed by people.

[10] Research on advanced autonomous flight control technology of XX aircraft, the 11th Five-Year Plan project, from June 5438+ 10 to June 5438+February 2000, was mainly completed by people.

[1 1] The research and development of functional modules of flight management system and information fusion software of integrated navigation system, a major sub-project of national civil aircraft, was mainly completed by people from June 2009 to 2065438 10+February 2000.

[12] Research on advanced flight management technology to realize "free flight" such as four-dimensional guidance-application research of flight management system, a major national civil aircraft project, 20 10, 1 -20 10, mainly completed by people.

[13] heterogeneous system integration service platform for business process management (2007AA04Z 1A6), national 863 project, from June 2007 to June 2009, project leader.

[14] Research on standardization of information integration framework and reference model of national defense science and technology industry enterprises, Institute of Standardization of National Defense Science and Technology Industry, 2 10 Weapons Department, April 2005-June 2007, project leader.

[15] Research on Evaluation Technology of Beijing Material Recovery and Recycling Manufacturing System (9072007), Beijing Natural Science Foundation, from June 2007 to February 2009, project leader.

[16] Research and development of reverse logistics system based on product life cycle (0630 100 10), China-akg Cooperative Research Fund, June 2007 to February 2008, the second undertaker.

[17] demonstration project of Dalian direct storage of central grain reserves-research and system development of information collection, real-time storage and comprehensive analysis technology, National Development and Reform Commission, Zhengzhou Research and Design Institute of State Grain Reserve Bureau, March 2006-May 2006, project leader.

[18] Tenth Five-Year National Major Science and Technology Project-Research on Important Technical Standards-Research and Formulation of International Standards for Superior Technologies in China-Formulation of International Standards for Reference Architecture of Integrated Systems, China National Institute of Standardization, June 2005-June 2007, 65,438+February, the second undertaking unit.

[19] Beijing science and technology commission's soft paper project "Research on MES standard specifications and implementation methods of manufacturing enterprises", Beijing science and technology commission, June 2005 -2007 10, project leader.

[20] Research and Application of Economic Outlook Theory for System Integration (Grant No.60474060), National Natural Science Foundation, from June 2005 to February 2007, project leader.

[2 1] Beijing Excellent Textbook Construction Project of Beijing Municipal Education Commission, from June 2004 to February 2005, project leader.

[22] Overall design of Xiangtan Electric Co., Ltd., deputy head of overall group of Xiangtan Electric Co., Ltd., June 2004-June 2005.

[23] Beijing Networked Manufacturing Demonstration Project-Overall Design Project of Networked Manufacturing Demonstration Project of Tongniu Group, Beijing Municipal Science and Technology Commission, Tongniu Co., Ltd., 10, March 2003-2004, mainly undertaken by the unit.

[24] "Beijing Science and Technology Rising Star Talents Program", Beijing Science and Technology Commission, from June 2004 to February 2006, served as the project leader.

[25] "CIM System Overall Design Basis" Postgraduate Excellent Course Construction, 985 Project, 65438+February 2002-65438+February 2004, project leader.

[26] Innovative Engineering of Modern Integrated Manufacturing and Automation Equipment for Ships, 863 Project, 20065438+065438+00-200265438+02, deputy head of the overall group.

[27] General Enterprise Reference Architecture and Implementation Methodology (approval number 200 1AA4 1534), 863 project, 200 1 year1month -20031month, project leader.

[28] Review of Master Planning and Design of CIMS Project of Pioneer Machine Tool Plant, Guizhou Pioneer Machine Tool Plant, from June 2002 to June 2003, project leader.

[29] Overall Design of CIMS Engineering Construction of Sanjiang Group, 066 Base of Aerospace Electromechanical Group, July 5438+0, 2006-March 2002, second undertaking unit, deputy head of the overall group.

[30] Feasibility demonstration of "CIM and Digital Engineering for Special Ships", Shipbuilding Heavy Industry and Industry Group Corporation, February 5438+0, 2006-June 5438+0, the second undertaking unit.

[3 1] Development of process modeling software and model base management system, 863 project,1March 999 -2000/month, project leader.

[32] "Networked Agile Manufacturing Information Infrastructure" sub-project "Architecture and Implementation Methodology", 985 project, 1998 -2002, the main undertaker.

[33] Architecture and Implementation Methodology of Ladder CIMS Based on China's National Conditions (Grant No.69784005), supported by National Natural Science Foundation of China,19981-200012.

[34] "Aviation CIMS Plan", National 863 Plan,1February 998 -20001February, main undertaker, member of the overall group.

[35] Research on 3D Digital Map Acquisition Technology in Low-altitude Penetration (ApplicationNo. 95E52043), Aviation Science Foundation, 1996 65438+ 10-0/99865438+February, the main undertaker.

[36] TF/TA2 and low-altitude penetration technology are studied by using digital maps (contractNo. 98-0303-0 1), Aviation Institute 6 15, 1997 65438+ 10/99.

[37] Research on Autonomous Low-altitude Penetration System (No.:36.6. 1), Science, Technology and Industry Committee of National Defense, 1 9961-200012, mainly undertaken by1,BPR and the system.

2. Integrated Information System Architecture (ARIS)- Business Process Modeling, 2003,230,000 words, Machinery Industry Press.

3. Information Project Management-Essential Skills of Information Supervisor and Integration Consultant, 2004,350,000 words, Machinery Industry Press.

4. Overall Design of Enterprise Informatization, 2004,520,000 words, Tsinghua University Publishing House.

5. Manufacturing Execution System, August 2007, 280,000 words, China Electric Power Press.

6. Modeling and Analysis of Enterprise and Information System, September 2007, 660,000 words, Higher Education Press.

7. Modeling and Analysis of Enterprises and Information Systems, June 5-4, 2009+10, Higher Education Press and springer.

Among them, The Overall Design of Enterprise Informatization is an excellent teaching material construction project of Beijing higher education. In 2004, it was rated as an excellent teaching material in Beijing and recommended by the Department of Degree Management and Graduate Education of the Ministry of Education as a "teaching book for graduate students". In 2008, "Modeling and Analysis of Enterprise and Information System" was awarded as an excellent textbook in Beijing.