"Power capacity increase fee" (i.e.; The subsidy has been cancelled long ago. The State Council about; 48 kinds of unreasonable expenses, such as urban construction supporting fees, commercial network construction fees, non-staple food adjustment funds, power capacity increase fees, young crops compensation, etc., have long been cancelled, and only the education surcharge has been retained.
you use electricity for construction, or keep the original transformer.
when the project is officially put into operation, power will be supplied according to the new distribution system. Above 8 kva, high-voltage measurement must be adopted. The power sector only recognizes one household. That is, only one high-voltage metering cabinet is allowed, and you can set two low-voltage rooms (in their own buildings).
if the enterprise is managed by yourself in the future, your two transformers can be connected in sections, which can save a lot of operating costs. Namely; Turn off one transformer in the trough, concentrate all the load on one transformer, and reduce the no-load loss of the transformer. Low voltage compensation can also be used in one set.
For the planning and application of construction projects, please visit my website in Chinese; The corner of the builder. There is my mailbox on it.