1, deed tax, 3-5% of the total purchase price (the tax rates of different provinces, municipalities and autonomous regions are different), and ordinary commercial housing is halved, that is, 1.5-2.5%.
2. Stamp duty, 0.05% of the total purchase price.
3, housing maintenance fund, 2-3% of the total purchase price, 2% in most places.
4. Non-staple food price adjustment fund, 2 yuan /m2, not used in some places.
5. Transaction cost: residential 3 yuan/m2; Non-residential 1 1 yuan/square meter.
6. Housing registration fee: residential 80 yuan/set; Non-residential 550 yuan/piece.
7. Stamp duty on license: 5 yuan/copy.
8. Cost: 10 yuan/copy.
If you take out a mortgage, you will also need the following fees:
1, appraisal fee, 0.2-0.5% of the total purchase price.
2. Insurance premium: the total purchase price multiplied by the loan term multiplied by 0. 1% multiplied by 50%.
3. Notarization fee, the loan amount multiplied by 0.03%.
4. Mortgage registration fee, 100 yuan.
What are the precautions for closing the blank room?
1. All exterior wall finishes of rough houses, including balcony and rain cover, shall be completed according to the design documents.
2. If prefabricated floor slab or cast-in-place slab ceiling is used in each room inside the door, it should be leveled with putty first, without plastering, so that the slab joint is dense and crack-free, the joint is flat and error-free, the surface is smooth, the color is basically uniform, and the line angle is straight; The ground concrete base of each room in the door should be flat and dense, so as to be firmly bonded and free from cracks.
3. All kinds of pipes in the blank room should be inspected and accepted by water supply, pressure test, ball test, heating and thermal debugging.
4. The floor of the room with waterproof requirements in the delivery standard of rough house should be planned in strict accordance with the architectural requirements of waterproof layer and protective layer, and two water storage tests should be carried out during acceptance to ensure no leakage.
5, public parts, public facilities, all kinds of pipes (air supply, exhaust, rain, heating, heating), electrical equipment (distribution box, cabinet, plate, socket, switch, lamps and lanterns, etc. ) should be completed in accordance with the design documents, all kinds of test items should be completed in accordance with the provisions.
6, rough house roof engineering project for water storage, water spray test.
7, floor drain and flashing slope comply with the design requirements, not flashing, joint tight smooth, no leakage.
8, all kinds of room cement floor elevation at the grass-roots level, should consider the height of the reserved size requirements when decorating.