The term "building energy efficiency" as mentioned in these Measures refers to the use of energy-saving technologies and products in construction activities, so that buildings can meet the design standards for building energy efficiency. Fourth municipal construction administrative departments responsible for the city's wall material innovation and building energy conservation management.
County (city) construction administrative departments responsible for the area of wall material innovation and building energy conservation management.
City, county (city) wall material reform building energy efficiency office is responsible for the daily work of wall material innovation and building energy efficiency. Fifth to encourage the use of new building structure system, the development and promotion of the use of new non-clay bricks, blocks, building plates and high-content waste and other new wall materials.
Encourage scientific research and technological development of building energy conservation, and promote the use of advanced energy-saving technologies, materials and equipment. Sixth units and individuals that have made outstanding contributions to the innovation of wall materials and building energy conservation shall be commended and rewarded by the Municipal People's government or the administrative department of construction. Seventh municipal construction administrative departments shall, in accordance with the relevant national technical norms and standards, register and confirm new wall materials and building energy-saving products, and regularly publish the catalogue of new wall materials and building energy-saving products to the society. Article 8 It is forbidden to build, expand or rebuild solid clay brick production lines. Ninth new construction, expansion, renovation of the city's construction projects above the zero line of the wall and temporary construction facilities, stop using solid clay bricks time limit:
(1) The construction in the area within the inner ring road has been stopped since February 3, 20031day;
(two) in the area within the second ring road construction, since February 3, 20041day to stop using;
(three) the construction in the urban planning area of this Municipality has stopped since June 30, 2005.
After the use of solid clay bricks is stopped in the areas specified in the preceding paragraph of this article, it belongs to the construction projects and other maintenance projects that need to maintain the original architectural style in the first, second and third types of protected buildings and protected blocks, and it is necessary to use solid clay bricks, which shall be reviewed and agreed by the municipal office of wall material reform and building energy conservation. Article 10 The product quality of new wall materials shall conform to national standards, industrial standards and local standards. New wall materials that do not meet the quality standards shall not be produced and sold. Eleventh wall materials produced by solid waste shall comply with the relevant provisions and standards of environmental protection. Twelfth new construction, expansion and reconstruction projects, the construction unit shall pay the special fund for new wall materials in accordance with the relevant provisions. The special fund for new wall materials is included in the cost of Jian 'an project.
No unit or individual may, in violation of state regulations, change the object of collection, expand the scope of collection, raise the collection standard or reduce, exempt or postpone the special fund for new wall materials. Thirteenth new wall materials special fund into the financial budget management at the same level, earmarked for the following expenses:
(a) loan interest on the introduction, construction, expansion and transformation of new wall materials production line projects;
(2) subsidies for demonstration projects of new wall materials (including imported projects) and pilot projects for popularization and application;
(3) Research on new wall materials, development and promotion of new technologies and new products;
(four) the development of new wall materials publicity;
(five) to support the construction of new wall materials production base;
(six) other expenses related to the development of new wall materials;
(7) charging fees.
The total expenditure of items (1), (2), (3), (4) and (5) of the preceding paragraph of this article shall not be less than 90% of the total expenditure of the special fund for new wall materials in that year. Fourteenth new wall materials special funds use plan, by the office of wall materials reform and building energy conservation is responsible for the preparation, reported to the finance department at the same level for approval. Fifteenth construction projects use published new wall materials, after the completion of the project, the office of wall material reform and building energy conservation for the record.
According to the proportion of new wall materials used in the project, the office will refund the special funds for new wall materials to the construction unit in accordance with relevant state regulations. Sixteenth new construction projects should adopt energy-saving walls and roofs, choose advanced and reasonable heating methods, adopt efficient pipeline insulation and thermal control metering technology, and energy-saving equipment and appliances.
If the existing building does not meet the building energy efficiency standards, it should gradually carry out technical transformation of its envelope and heating system, in which large-scale repair of the building must be carried out. Seventeenth construction units shall, in accordance with the relevant provisions of national and provincial building energy conservation, use all kinds of energy-saving and environmentally friendly doors and windows. Eighteenth construction units shall entrust engineering design in accordance with the requirements of building energy efficiency and mandatory standards for building energy efficiency.