Research report on strengthening the management of safe drinking water in rural areas

Research report on strengthening the management of safe drinking water in rural areas

#report# Introduction In our ordinary daily life, the number of reports used is increasing. We must pay attention to the rationality of logic when writing reports. The following is a research report on strengthening the management of safe drinking water in rural areas. Welcome to read it!

Part 1 Research Report on Strengthening Rural Safe Drinking Water Work Management

In order to promote the construction and management of rural safe drinking water projects in our district and effectively improve the level of safe drinking water work, according to the 20xx consultation work plan According to the arrangement, some members of the District CPPCC organized some members to conduct preliminary research on 13 villages, 5 resettlement sites and 1 water supply company in 6 towns including Yecun and Yaoshi from October 10 to 17; on October 22 On the same day, some committee members were organized to go to the centralized water supply point in Dajing Town, the Jianfang Limin Water Supply Station in Yecun Town, and the Hejiayuan water supply point. Through on-site inspections, household visits, listening to reports, and face-to-face discussions, they conducted on-site inspections, home visits, report listening, and face-to-face discussions to conduct safety inspections on rural safety in our district. A centralized survey was conducted on drinking water work. The investigation situation is now reported as follows: 1. Current situation and characteristics

Since 20xx, our district has completed an investment of xx million yuan in rural drinking water project construction and built xx various water supply projects. Among them, there are xx underground water sources and xx surface water sources, with a designed water supply capacity of xx thousand m3/day. The water supply covers xx towns and offices in the region, solving the drinking water problem of xx people. The penetration rate of tap water in rural areas reaches xx%, and the water supply is guaranteed. The rate reaches xx%. The region's rural safe drinking water work has achieved phased results, mainly showing the following four characteristics:

First, leaders pay attention to and implement responsibilities. The district government attaches great importance to the construction and management of safe drinking water projects in rural areas, and regards rural drinking water safety work as an important livelihood project to speed up farmers to get rid of poverty and become rich in an all-round way to build a moderately prosperous society. It has established a system with the district chief as the general commander and the deputy district chief in charge as the deputy chief commander. The Rural Safe Drinking Water Project Construction Headquarters, with the development and reform, finance, water affairs and other departments as members, strengthens organizational leadership and departmental collaboration. The organizational leadership, main responsibilities and departmental collaboration responsibilities were clarified, the work tasks were consolidated, time nodes were delineated, and promotion measures were strengthened, which provided a strong guarantee for the orderly and effective implementation of the construction and management of rural safe drinking water projects in the region.

The second is to adapt measures to local conditions and plan scientifically. The district government and functional departments adhere to the work ideas that are conducive to the utilization of water sources, cost savings, post-construction management and tilt towards areas with drinking water difficulties, tourist attractions, immigration development areas and urban planning areas, and strengthen rural drinking water safety engineering planning and town-run village layout planning , the construction of immigration development zones and other plans, focusing on the overall deployment of poverty alleviation in the region, and in accordance with the principles of overall planning, highlighting key points, and adapting measures to local conditions, adopting the method of centralized water supply as the mainstay and decentralized water supply as the supplement, scientifically and rationally compiled the Rural drinking water safety project construction planning.

The third is to focus on quality and standardize construction. In order to build a safe drinking water project in rural areas, the district government and water affairs department strictly control the quality during the construction of drinking water safety projects, conscientiously implement the basic construction procedures of the project, strictly enforce the system, and select design units and supervision units with corresponding qualifications for project design and quality supervision. , equipment procurement and construction units are all determined through public bidding. Construction units are required to strictly implement the "three inspection system" during construction to achieve safe production and civilized construction. During the implementation of the project construction, a quality assurance system will be established with the legal person responsible for the project, control by the supervision unit, guarantee by the construction unit, and supervision by the quality supervision station, so as to steadily advance the quality assurance of the safe drinking water project construction.

The fourth is to establish rules and regulations and strengthen management. In order to strengthen the operation and management of water supply projects in towns and villages in the district and ensure the normal operation of water supply facilities, the district government has successively issued two policies: "Measures for the Operation and Management of Water Supply Projects in Towns and Villages in xx District" and "Measures for the Management and Use of Maintenance Funds for Water Supply Projects in xx District" documents, and pay close attention to the operation and management of rural drinking water projects. At present, the management of rural drinking water safety projects in our district has initially formed a model in which single-village water supply projects are independently managed by villagers, and joint-village centralized water supply projects are managed by water supply stations. Water supply prices are reasonably determined, and independent management and self-financing are adhered to, so as to effectively solve the problem of water supply Related costs. At the same time, the sampling testing of drinking water has been strengthened to ensure drinking water safety to the maximum extent. While introducing clean water to thousands of households, it has also fulfilled the people's long-awaited desire for convenient and safe water, and has become a popular project that satisfies the masses.

2. Existing Difficulties and Problems

Although the rural drinking water safety work in our district has achieved obvious results, according to the research and understanding, there are still some outstanding problems that cannot be ignored. , mainly in the following aspects:

(1) Inadequate ideological understanding. Some departments and town offices have not fully understood the importance of drinking water safety. The publicity and implementation of the "xx District, Town and Village Water Supply Project Operation and Management Measures" are just a formality. The general public is not aware of the current national rural safe drinking water project construction management methods, investment mechanisms and other policies. The awareness rate is low, and there is a lack of awareness of water conservation, paid use of water resources and water source protection, and serious ideological needs; leaders in charge of relevant departments, business personnel and town and village cadres have few regular studies and trainings, and the implementation of policies and regulations and business capabilities are slowly improving, and they cannot It is conducive to the effective development of work; some people have little awareness of paid water use and are resistant to the collection of water fees. The collection of water fees is difficult and seriously affects the normal use of water supply facilities.