Management fee: 7 yuan /m2 3 drawing review fee: the construction area of the Construction Bureau is within 2 million m2 1.98‰ and over 2 million m21.65 ‰; 4. Engineering quality based on engineering cost.
Framework of construction bureau for supervision fee: the high-rise 2.2 yuan /m2, multi-storey 2 yuan /m2 workshop and decoration works are levied at 2‰ of the total project cost: 1.5 yuan /m25 Labor Insurance Co-ordination Construction Bureau is charged at 3.4% of the project cost; 6 termite control fee; Termite Control Institute 2.5 yuan /m2 7 civil air defense relocation site.
Project cost: non-residential 36 yuan /m2, residential 30 yuan /m2 8, new wall material development fund bulk cement 8 yuan /m2 9.
Special Fund of Building Materials Bureau 1.5 yuan /m2 10 Urban Archives
Urban construction archives management fee 1 over ten thousand m2, 0.4 yuan /m2.
Below 10000 m2, 0.5 yuan /m21/planning service fee. The Municipal Planning Bureau will charge the freight outside the muck 12 for the section from1.6 to 2.3 yuan/m2. City Council 1.5 yuan /m2 13 area surveying fee, and the market office of real estate bureau 2.4 yuan /m2 14 gas pipe network sharing fee (renamed) gas company. M2 15 6 yuan /m2 for new water supply network (renaming) for non-resident commercial houses of water supply company, and 800 yuan/household for newly installed commercial outlets with a building area of 20m2 (inclusive); Within 20~50m2, 1200 yuan/household; Over 50m2, 2,000 yuan/household 16 lightning protection and disaster reduction fee: 0.2 yuan /m2.
Construction supervision and completion acceptance fee of lightning protection device: 0.9 yuan/m2.