Current location - Trademark Inquiry Complete Network - Tian Tian Fund - 5 standard model of commitment letter.
5 standard model of commitment letter.
How to write the letter of commitment? The following is my written commitment letter to you, I hope it will help you!

Article 1: Written Commitment Letter

letter of commitment

In order to maintain the order of the construction market and strengthen the daily management of construction enterprises.

, our unit solemnly promises as follows:

1. According to relevant laws and regulations, the personnel sent by our unit to this project meet the project scale and stick to their posts.

Two, my unit will resolutely stop illegal, illegal, in violation of the relevant provisions of the Feidong county construction market during the construction activities.

Three, my unit resolutely put an end to the occurrence of complaints and petitions about wage arrears of migrant workers during the hair period.

4. Our unit solemnly promises that if the above situation happens in our project department and causes serious consequences, our unit will bear all responsibilities.

Legal name of the promisor (official seal of the enterprise):

Legal address of the promisor: No.4, Building 3, Sanshan Street, Sanshan Town, Fuqing City

Commitment or authorized representative (signature or official seal of legal person)

Tel: 055 1-4392470 Fax: 055 1-4392470

April 28th, 1965 438+02

Power of attorney of legal person

Statement of power of attorney: I, Wei Changgui, am the legal representative of Fujian Changhong Construction Engineering Co., Ltd., and I hereby authorize Guo Zijian of Fujian Changhong Construction Engineering Co., Ltd. as the legal agent of our company to sign the tender, explain the tender documents, negotiate, sign the contract and handle all matters related to the tender, filing, construction, completion and warranty of Anhui Yi Kai Industry and Trade Co., Ltd.

The agent has no right to entrust, and hereby entrusts.

Agent: (signature) Gender: male age: 47 ID number: 34012319660765438 Position: manager, bidder: (seal) Legal representative: (signature or seal)

Date of authorization: 2065438+April 28, 2002

Chapter II: Commitment Letter of Testing Unit (New)

Annex 8:

Project leader of Hengyang construction engineering testing unit

Commitment letter of quality inspection responsibility

Project name:

Test unit name:

Hengyang Housing and Urban-Rural Construction Bureau System

Quality inspection responsibilities of the project leader of the inspection unit

power of attorney

I promise to earnestly perform the following duties in the quality inspection of this project, and undertake the inspection responsibility.

1, undertake testing tasks in strict accordance with qualification level and business scope, and do not transfer testing business; No other unit or individual may undertake testing business in the name of the unit; Sign a written entrustment contract with the project entrusting unit; Carefully prepare the inspection plan, define the quality requirements and implementation standards, and report to the engineering quality supervision institution for the record. 2. According to the relevant national laws, regulations and mandatory standards for engineering construction, select qualified inspectors to carry out engineering quality inspection, and timely notify the project construction and supervision units and report to the engineering quality supervision institutions for violations of laws and regulations and violations of mandatory standards for engineering construction and unqualified projects.

3, issued by the test report signature formalities are complete, truly reflect the engineering quality, never issued false reports, timely collect test data and archive.

4. Witness testing and sampling, be responsible for the source of samples, be responsible for the test results, and bear other legal responsibilities arising therefrom.

Signature of the promisor:

Time: Year Month Day

Note: This letter of commitment is made in triplicate, one of which shall be submitted to the project quality supervision institution for filing, one of which shall be submitted to the urban construction archives management department for filing and verification together with the archives after the completion and acceptance of the project, and the other shall be kept by their respective responsible units for future reference.

Power of attorney of legal representative

We hereby authorize our comrades to be the project leader of the testing unit of this project, and earnestly perform the corresponding duties of the project leader on behalf of our unit, and be responsible for the source of the samples and the testing results.

Name of project leader: gender

ID number code:

Name of qualification certificate:

Vocational qualification certificate number:

Authorized unit (seal): legal representative (signature):

Date of Issue: Year Month Day

Remarks: A copy of the qualification certificate and ID card of the project leader is required; Copy of ID card of the legal representative.

Article 3: Commitment Letter of the Construction Unit

Commitment letter of lifelong responsibility system for project quality of construction unit

Project name: I promise that during the construction of this project, I will earnestly perform the following corresponding responsibilities and undertake the corresponding lifelong quality and safety responsibilities.

1. Contract the project within the business scope permitted by the qualification grade, and nothing else is allowed.

Units or individuals undertake projects in their own names, sign contracts according to law after undertaking projects, and start construction only after obtaining construction permits.

2, without the consent of the construction unit, do not contract any part of the project at will.

Subcontract. All contracted projects shall not be subcontracted or dismembered and subcontracted to others in the name of subcontracting.

3, in strict accordance with the provisions, equipped with key positions in the construction project department personnel, and ensure that

All personnel are on duty.

4, in strict accordance with the construction drawing review institutions to review qualified and stamped with special.

Chapter of the engineering design documents and the technical standards and quality standards agreed in the construction contract carefully organize the construction, do not modify the engineering design without authorization, and do not cut corners. And the building materials, building components, equipment and commercial concrete used in the construction shall be witness sampled in strict accordance with the regulations, and the inspection shall be recorded in writing and signed by a special person; Without inspection or unqualified inspection, it shall not be used in engineering.

5, establish and improve the quality and safety inspection and acceptance system, strict process management.

, completes the concealed engineering quality inspection and record. Before the concealed works are concealed, the construction, design and supervision units and engineering quality supervision institutions shall be notified in time for inspection and acceptance.

6. The data collection is true, accurate and complete, and the signing procedures are complete and timely.

Organize and hand over to the construction unit for the record.

7, the quality problems in the construction or unqualified project completion acceptance, responsible for the repair. Issue a quality warranty to the construction unit, specifying the warranty scope, warranty period and warranty responsibility of the construction project. In case of quality problems in construction projects within the warranty scope and warranty period, the warranty obligations shall be fulfilled in strict accordance with laws and regulations, and the losses caused thereby shall be compensated.

8. Duties stipulated by other laws and regulations.

Commitment unit (official seal):

Commitment (Project Manager):

date month year

Article 4: Commitment Letter of the Construction Unit

Commitment letter on quality and safety of construction projects

According to "People's Republic of China (PRC) Construction Law", "Regulations on Quality Management of Construction Projects", "Regulations on Safety Production Management of Construction Projects" and relevant laws and regulations, in order to strengthen the quality and safety production of construction projects, promote our unit to strengthen the sense of responsibility for quality and safety, and ensure zero quality accidents and zero safety production accidents, we solemnly promise as follows:

(a) my unit shall obtain the qualification certificate of the corresponding level according to law, and undertake the project within the scope permitted by its qualification level.

It is forbidden to go beyond the business scope permitted by the qualification grade of the unit or undertake projects in the name of other construction units. It is forbidden to allow other units or individuals to undertake projects in the name of their own units.

Our unit shall not subcontract or illegally subcontract the project.

(2) My unit is responsible for the construction quality of construction projects.

My unit should establish a quality responsibility system and determine the project manager, technical director and construction management director of this project.

In the case of general contracting of construction projects, the general contractor shall be responsible for the quality of all construction projects; If one or more of the survey, design, construction and equipment procurement of a construction project are contracted by the general contractor, the general contractor shall be responsible for the quality of the construction project contracted or the equipment purchased.

(3) If the general contractor subcontracts the construction project to other units according to law, the subcontractors shall be responsible to the general contractor for the quality of the subcontracted project according to the stipulations of the subcontract, and the general contractor and subcontractors shall bear joint and several liabilities for the quality of the subcontracted project.

(4) Our unit must carry out the construction according to the engineering design drawings and construction technical standards, and shall not modify the engineering design without authorization, and shall not cut corners.

My unit found errors in the design documents and drawings during the construction, and should put forward opinions and suggestions in time.

(five) my unit must be in accordance with the engineering design requirements, construction technical standards and contract, inspection of building materials, building components, equipment and commercial concrete, inspection shall be recorded in writing and signed by a special person; Without inspection or unqualified inspection, it shall not be used.

(6) Our unit must establish and improve the construction quality inspection system, strictly manage the process, and check and record the quality of concealed works. Before the concealed works are concealed, the construction unit shall notify the construction unit and the supervision unit. The regulatory authorities conduct spot checks.

(seven) the construction personnel shall take samples on the spot under the supervision of the construction unit or the project supervision unit, and send them to the quality inspection unit with corresponding qualification grade for testing.

(eight) construction projects with quality problems or construction projects that fail to pass the final acceptance shall be repaired by our unit.

(nine) my unit shall establish and improve the education and training system, and strengthen the education and training of employees; Personnel who have not received education and training or failed the examination shall not work at their posts.

(ten) the duties that should be performed in accordance with laws and regulations.

(1 1) Our unit promises to punish the projects under construction that are not fulfilled in place according to the following principles:

1. In case of a production safety accident during the construction process, and less than 2 people are killed, they shall be severely punished according to the Regulations on Quality Management of Construction Projects, Regulations on Safety Production Management of Construction Projects and other relevant regulations, and have a bad record for 9 months.

2. In case of a production safety accident during construction, and three or more people are killed, according to the Regulations on Quality Management of Construction Projects, Regulations on Safety Production Management of Construction Projects and other relevant regulations, the upper limit shall be severely punished, and the bad record shall be recorded 12 months.

3. The spot check of the supervision team found that the construction unit refused to rectify the rectification notice issued by the supervision unit within one year, the installation, disassembly and acceptance of the construction hoisting machinery did not meet the requirements, the safety protection was not set at the limb entrance, and the special construction plan was not edited or demonstrated. If the subproject fails to perform its duties according to the procedures and requirements, the bad record will be recorded for 3 months for the first time and 6 months for the second time, and administrative punishment will be imposed; The third time, the bad record was recorded for 9 months until it was blacklisted.

4. If the rectification notice issued by the regulatory authorities fails to reply within the time limit, it shall be deemed that the rectification has not been implemented, and the bad record shall be recorded for the first time for 2 months; Bad record for the second time within 4 months, and subject to administrative punishment; The third time, the bad record was recorded for 6 months until it was blacklisted.

After reply, the first bad record that has not been rectified in place is 1 month; The second bad record was 2 months and was subject to administrative punishment; The third time, the bad record was recorded for 3 months until it was blacklisted.

For those who continue to produce after issuing the notice of suspension of production and rectification, the bad records shall be kept for 6 months and reported to the relevant departments for further punishment and blacklisting.

5. Make bad records for employees who fail to perform their duties, and impose corresponding penalties according to the regulations of the Provincial Housing and Construction Department [2065 438+04] 124, QIAN Tong [2065 438+04]409, etc.

Construction unit (official seal)

Date: Year Month Day

Legal Representative: Tel:

Authorized representative: Tel:

Chapter V: Letter of Commitment Style

Attachment: 2- 1

Project quality of the project leader of the construction unit

Commitment letter of lifelong responsibility

I promise: I will earnestly perform the following duties during the project construction, and bear the corresponding lifelong quality responsibility.

1. The principle of survey first, design later and construction later should be adhered to in engineering construction. Provide true, accurate and complete original materials related to the construction project to the survey, design, construction, supervision, testing and construction drawing review units.

2. Timely handle the procedures such as project site selection, land use planning permission, construction project planning permission, project construction drawing review and filing, quality and safety supervision, contract filing, and start-up safety production conditions review, and start construction only after obtaining the construction permit.

3. Contract the project to the construction, supervision, survey, design, testing and construction drawing review units with corresponding qualification levels, strictly implement the project bidding that must be tendered according to laws and regulations, and do not dismember the construction project, force the contractor to bid below the cost price, and arbitrarily compress the reasonable construction period. Provide the construction drawings, design changes and other relevant design documents that have passed the examination by the construction drawing examination organization and are stamped with special seals.

4. It is not allowed to express or imply that survey, design, construction, testing and other units violate the mandatory standards for engineering construction or use unqualified building materials, building components and equipment to reduce the quality of the project.

5. Our company will timely sort out the documents and materials in strict accordance with the Code for Filing Construction Project Documents (GB/T50328-20 14), establish and improve the project files, and ensure the truthfulness, accuracy and completeness of the documents and materials. Before the completion of the project, it shall submit the quality responsibility information document and the acceptance project data to the urban construction archives management institution, and the construction project archives shall be handed over to the urban construction archives management institution within three months after the completion of the record.

6. Our unit will undertake the maintenance of residential engineering quality problems during the warranty period in accordance with the relevant provisions of the state.

7. Seriously perform other relevant statutory duties and assume corresponding lifelong responsibilities. This undertaking is made in quadruplicate, one of which is submitted to the project quality supervision institution for the record, and three of which are included in the project quality lifelong responsibility information file by the construction unit.

Attachment: 2-2

Project quality of the project leader of the survey unit

Commitment letter of lifelong responsibility

I promise: I will earnestly perform the following duties during the project construction, and bear the corresponding lifelong quality responsibility.

1. Carry out survey business in strict accordance with the qualification level and business scope of engineering survey approved by the unit, and shall not undertake survey business beyond the level and scope or in the name of other engineering survey units, and shall not subcontract or illegally subcontract the survey business undertaken. Sign engineering survey business contracts according to law, consciously implement the charging standards for engineering survey stipulated by the state, and do not drive down prices through vicious competition.

2. Strictly implement the engineering survey standards and the witness system of engineering survey site, resolutely put an end to cutting corners, practicing fraud, and not providing false survey results.

3. Organize and inspect the original records of engineering investigation in time during the investigation to ensure the authenticity and accuracy of sampling records, and do not leave the site to write down or fabricate data.

4. The unit shall ensure that the survey documents provided to the owner are true and accurate, and the relevant signature and seal procedures are complete, which meets the requirements of the depth of preparation of survey documents stipulated by the state, and timely file the survey report and relevant original materials.

5. Seriously perform other relevant statutory duties and assume corresponding lifelong responsibilities. This letter of commitment is made in quintuplicate, one for the reconnaissance unit, one for the record of the project quality supervision institution, and three for the lifelong responsibility of the construction unit for the project quality.

Any information file.

Attachment: 2-3

Project quality of the project leader of the design unit

Commitment letter of lifelong responsibility

I promise: I will earnestly perform the following duties during the project construction, and bear the corresponding lifelong quality responsibility.

1. Carry out design business in strict accordance with the approved engineering design qualification grade and business scope, do not design beyond the grade and scope or undertake design business in the name of other engineering design units, sign engineering design business contracts according to law, and do not subcontract or illegally subcontract the contracted design business. Consciously implement the charging standards for engineering design stipulated by the state, without vicious competition.

2, in strict accordance with the mandatory standards of engineering construction and related engineering construction norms and standards for design. The construction drawing design shall be carried out in strict accordance with the survey results witnessed on the spot and the approved preliminary design documents.

3. This unit guarantees that the design documents provided have gone through strict internal audit and proofreading procedures, and the relevant signature and seal procedures are complete, which meets the requirements of the depth of document preparation stipulated by the state, and the design documents and related materials are filed in time.

4. Supervise the construction unit to submit for approval in time, and deliver the drawings that have passed the examination to the construction unit for construction. Unqualified drawings will not be accepted by our unit.

5. Provide relevant units with legal and effective construction drawings stamped with the special seal for drawings of the design unit, the seal for practitioners and the special seal for review institutions. In accordance with the provisions, do a good job of design disclosure to the construction unit and supervision unit, and actively do a good job in design follow-up services.

Related articles:

1.

2. Model letter of commitment format

3. Style construction written commitment mode

4. Model Personal Commitment Letter

5. Personal Commitment Letter