MengMeng's mud-wood project decoration diary.
I just experienced hydropower renovation, and I thought I would have a lot of peace of mind in the future. But it was not until the mud-wood project that MengMeng "suddenly woke up" and there was no peace of mind in every link of decoration. The slow progress of the construction period, the unqualified timber materials, and the wrangling of wages have made MengMeng understand the truth that "the villain first, the gentleman later". It seems that everything should be explained first.

House information: 12_

Decoration style: Nordic IKEA

Decoration method: half package

Residential area: Lily Huafu

Decoration progress: mud wood project

Decoration period: 44 days

June 18, 215

After a few days of heavy rain, the house drifted. I bought a second-hand house. When I bought it, there were leaks in the bay window and several places where the air conditioner was hung. I specially asked someone to work high above it and repaired it. A layer of roof waterproof material (SBS) was laid on the bay window. Originally, I was most satisfied, and the place that I thought would not leak water was the bay window. Today, when I left, I was dumbfounded. Take a closer look, and it feels like a hole has been punched in these two places where the water originally leaked.

Get the agent here quickly, because when buying a house, it was stated in the contract that there was a deposit of 1, yuan to wait until the rainy season passed at the end of June to see if it would seep. I feel very depressed, I don't know where the cause of water leakage is, and I'm afraid of repeated water leakage in the future, so buying this house is troublesome. But it's all right, it hasn't been painted yet, and everything was found in time. I hope it will go smoothly.

June 19th, 215

On June 15th, the bricklayer entered the site. The bricklayer and his wife live in my house, and they can also do some odd jobs in the evening. Only the kitchen, bathroom and balcony in my home are paved with floor tiles, and I bought the vitrified tiles from Kyle Polo. I still have some regrets about the choice of tiles. Vitrified tiles need to use special tile adhesive, and additional items need to be added, and 15 yuan is used for a square package of materials. It cost 8, yuan to buy bricks, and with the addition, it will cost 1, yuan to lay bare tiles. I also blame myself for not working hard on the choice of ceramic tiles and making a choice casually, which can be regarded as paying tuition for decoration.

June 2, 215

I must spit out my endless and snail-like construction period!

On the afternoon of June 15th, the bricklayer came into the field, full of expectations. Because a couple of them live in my house and feel that the progress must be great! However, it turns out that it's just a feeling!

On June 16th, the bricklayer went out to work for others, expressing his understanding. After all, he had to finish the work for others' homes.

on June 17th, bricks and cement were laid on the security door, and the wall was polished.

on June 18th, I did waterproofing. The whole morning passed, and the bricklayer didn't show up until noon. I guess he came back to cook and eat. Before he left, he knocked out the empty concrete in the kitchen. When he went to the construction site at 6: 3 in the evening to meet the project manager, he had just begun to mend the wall! All afternoon, just taking a nap?

on June 19th, I went off work, but the bricklayer was not here. Come with zongzi, and go back with fire. Call the project manager and ask him why the workers are not here and when to put the bricks. The project manager told me that he had something to go out today, and he would come back in the evening and start laying bricks tomorrow. Ok, since it will be posted tomorrow, I will bear it!

On June 2th, I went to send zongzi to the bricklayer in the morning, and I was filled with joy. I went there and found that the bricklayer was not there! I have to ask again. Where is he? We agreed. Where's the bricklayer? The project manager's answer is, go home for the holidays, come back at five o'clock in the afternoon, and officially put up bricks tomorrow!

I'm going home for the holiday. Why did you stay at my house last night? Why don't you just go home? When my home is a hotel? The most terrible thing is, after you calm down, you have to tell yourself not to annoy the bricklayer, and you have to rely on him in the future. What a humbling!

June 21, 215

The bricklayer finally started to paste bricks, and the speed was quite fast. When I went in the afternoon, the two walls of the bathroom had been pasted. Just feel better. I'm so easy to satisfy, okay? Looking forward to the bricklayer's perfect work!

because of the renovation, I didn't go out to travel for the whole first half of the year. I really want to go out to play! Hurry up and end it, looking forward to my warm nest!

June 23, 215

Very fast! It's almost time for the kitchen today! The waterproof of the bathroom floor has been done! When it is dry, you can do a 24-hour closed water test!

the threshold stone was delivered, and I went there stupidly and left without looking. Although the tiles are very simple, there are no complicated patterns, but I believe the road is simple! There is nothing wrong with insisting on simplicity! I hope everything will go well in the future, my little heart can't stand the toss!

Jun. 29, 215

Since I started tiling, I feel new every day! Yesterday, the kitchen was completely paved and the balcony was fine! Just the floor tiles in the bathroom! Compared with the next door, my bricklayer's work really has nothing to say, and all kinds of irregular places are handled well! Imitate teacher Jin, the word "perfect"!

With Apple's own level tester, the level values of the walls and floors are all "perfect"! After paving, I still feel that the bricks in the bathroom and balcony look better, but the more expensive wood grain brick in the kitchen is a bit inferior. However, with white cabinets, I hope there will be different effects!

going to the bathroom at night should have been paved! Cement yellow leveling is about to start! This week, you need to install smoke pipes, water heaters, ceilings and cabinets. Everything goes well!

July 2, 215

Today, all leveling is over. Go to the site and have a look at my annoying downspout. As a result, 5 pipes are used in the kitchen and 4 pipes are used in the toilet and balcony. There was only one floor drain in the toilet, but it was changed to three. I really don't know what kind of hair will block the toilet if I accidentally fall in. In fact, I really don't understand. The gas pipes in the kitchen are all 5 pipes. Why don't I use 5 pipes for my downpipe?

There is also the floor drain left by the balcony. The decoration company clearly knows that I want to hit the cabinet, and also told me that the distance to the wall is more than 6 cm, and the general cabinets are all 6 cm deep. I feel relieved that what the manager said is definitely true, but today I went to the scene to measure it and found it was only 55 cm!

July 5, 215

Finally, woodworking materials are coming into the market! Under the haze of sweeping away the floor drain and water heater, my husband and I went to the construction site early in the morning to prepare the acceptance materials.

I can only say that all the excitement has been drowned out by reality. We wrote in the contract to use the paint-free board in the green field. When signing and signing the contract, we have been entangled in whether to use the green field or the bunny. The designer told us that it takes 55 yuan a square to use the bunny and 46 yuan a square to use the green field. The green field has been acquired by the bunny. So when my husband and I thought about it, of course we used the green field!

Let's talk about popular science. The authentic green field is Jiangxi Green Field, with the Chinese trademark LUYE (unregistered) and the English trademark Luye (registered), so many green fields in the market are not authentic Jiangxi Green Field bought by Bunny, such as GANSHAN, which was given to me by my home decoration company. This is like the difference between Master Kong and Kang Shuaifu. To put it bluntly, it is a cottage! .

Seeing that the workers are working so hard to carry materials, and it is going to be raining again and again in Nanjing, I thought I would use this fake product, but please look at the seams of these cross sections. If they are one piece, they can be understood as normal seams, and half of them may be because I didn't make it clear. The project manager was going to exchange the goods the next day, and when he confirmed with me, he said that he was sending Bunny's Chinese fir plywood. What I want is paint-free cedar board. The price difference between these two boards is 7 yuan, so I refuse decisively! I think this is playing a word game with me. If I want to change it to Bunny's Chinese fir paint-free board, I feel that the whole person is not good if I want 62 square meters! In a rage, I told the designer angrily that all carpentry work was cancelled!

July 9, 215

I rushed over as soon as I got off work today, and I felt good when I saw the carpenter's cloakroom! The cloakroom is made of wood from Moganshan, and the quality is satisfactory. Although I knew from the beginning that it would not be too big to separate a cloakroom, it felt much smaller than I thought. No way, for the sake of the spaciousness of the whole room, we can only compromise this cloakroom.

The sideboard next to it is also made of paint-free board. I've been wondering if it's too much trouble to paint it all white, and it's definitely not so environmentally friendly if it needs to be painted with a lot of paint!

Looking at the carpenter's workmanship, I'm thinking about whether to let the master beat the tatami and wardrobe in the second bedroom. If so, I think it's also white with wood grain color, which should be more environmentally friendly!

July 14, 215

Woodworking has been going on for a week, and everything is going well. The carpenter's craft is good, but he feels particularly fond of bragging, and then when he bragged, he was quite awkward, and when he did, he hit him with a nail gun! But the whole cabinet is still very strong. However, carpentry is a very difficult place to deal with. There are two methods for woodworking edge sealing, one is to use a card strip, 6 yuan each, and stick it with nail-free adhesive; One is to seal the edge with Ausong board and then paint it. No matter which method, it is not as perfect as the customized edge sealing, but after a Sophia wardrobe cost me 5 yuan, I dare not customize it lightly, and the carpentry skill is good, so let the carpenter come!

July 18, 215

On July 18, 215, all carpentry work was finished. Generally speaking, the carpentry work is satisfactory, except for some details that have not been handled well, the others are good, mainly because the quality of the board is very good, and I like it again for Moganshan.

But we are still young. When we decided to hire a carpenter privately, we felt that we didn't discuss the price with the carpenter in advance, but only asked the price roughly. When it came to the settlement, the carpenter suddenly changed his face.

I used a piece of joinery board, three pieces of plasterboard, various hardware and nail-free glue from the master, and the false price is certain, so I'm too lazy to care about it with him. Learn from mistakes! At the beginning, all these things could be sent by Moganshan, but he bought everything the master said, and his heart softened and he followed him.

you must learn to be a villain before a gentleman in the future! Everything is discussed in advance!

August 1, 215

Before I mentioned to you, the hateful 4cm downspout was found after the tiles were pasted up, and the washing machine and basin on the balcony fell into the water as a downspout, which was very close to the floor drain. The floor drain was dug very shallowly, and once the water was poured slightly, the floor drain would return to the water.

after communicating with manager Cao, he didn't say much after he personally experimented. He simply said "change"! The first local reconstruction only turned the downspout to the floor drain into a corner, which was not only useless, but also the plumber dug too deep at the downspout, and the water not only returned to the floor drain, but also accumulated water.

after communicating with manager Cao, I decided to tear down all the bricks, which happened to leave three bricks at home. The drainage of the washing machine is directly connected to the original drainage pipe, the downspout is 5 cm, and the floor drain position is shifted outward by 5 cm. This time, I tried several times to make sure that the water usually does not return, and then I asked the bricklayer to re-lay the bricks.

More exciting reading recommendations:

Secrets that the decoration company won't tell you

Diary of the "natural enemy" supervisor of the decoration company for decoration acceptance

Nine commandments of decoration: be a law-abiding owner

Teach you to read the "code words" in the decoration model room

What to do if it is cold in winter? Is it better to warm the floor or heat it?