The reasons for the acceptance application must be sufficient, reasonable, and realistic, and cannot be exaggerated or fabricated, otherwise it will be difficult to obtain approval from superiors. Below is the sample application letter I brought to you, I hope it can help you!
Sample application letter 1
__ Investment Development Co., Ltd. Responsible company:
Subject matter: Application report for delivery quality inspection of the sixth contract section of the North Shore Connection Line Project of __ Bridge
Report content:
Hangzhou Bay Bridge North Connection Line The sixth contract starts from the Buyun hub of the Shanghai-Hangzhou Expressway, with the station number K24+000, and ends at the north bridge head of the ____ Bridge, with the station number K48+785, with a total length of 24.785 kilometers. The total price of the pavement contract is 272.237 million yuan. The ASEAN Company won the bid on January 24, 20__. The contract period is from February 15, 20__ to November 15, 20__. After careful organization and reasonable planning and arrangement by our department, all construction contents have been completed in accordance with the contract.
Our unit is based on the highway engineering inspection and evaluation standards JTG F80/1-20__ formulated by the Ministry of Communications, the "Highway Project Completion (Delivery) Acceptance Methods" promulgated and implemented by the Ministry of Communications on March 31, 20__ and Self-inspection of project quality was carried out in accordance with the requirements of relevant regulations. All sub-items and sub-projects are qualified, and all sub-items and sub-projects have a score of more than 90, with an excellent and good rate of 100%. The self-assessment grade is excellent and meets the design and quality requirements.
Now our unit has organized personnel to prepare the completion data. All the data are complete and have been compiled in strict accordance with the content stipulated by the Ministry of Communications and meet the regulatory requirements. Our project management department and supervision engineer have completed the work summary of this contract period.
So far, our unit has completed the work completed before the delivery quality inspection stipulated in the "Measures for the Acceptance of Highway Project Completion (Delivery)" promulgated and implemented by the Ministry of Communications on March 21, 20__, and has the qualifications for delivery Quality inspection conditions, now our unit applies for quality inspection of the sixth contract section of the __ Bridge North Bank Connection Line Project.
This is reported.
___
__month__day, 20__
Please provide sample text for application acceptance 2
1. Project overview and completion status :
____Changchang fund-raising building project for returned overseas Chinese workers is located in the compound at No. 26, Wuxu Section, Youyi Road, Jiangnan District, Nanning City. The project cost is 3.188 million yuan and the total construction area is 3,009.552 square meters. , the structure is a concrete frame structure/6 floors above ground, the total building height is 17 or 15 meters, and the indoor and outdoor height difference is 300mm. Sample application form for acceptance report. The building structure category is Category 3, the seismic fortification intensity is 6 degrees, the building has a reasonable service life of 50 years, the waterproofing level is Level 3, and the building structure safety level is Level 2.
In accordance with the requirements of the design drawings and relevant design documents, our company has completed the foundation and foundation sub-projects, the main structure sub-projects, the building decoration and decoration sub-projects, the building roof sub-projects, and the construction sub-projects of this project. Construction tasks of water supply, drainage and heating branch projects, building electrical branch projects, and building energy-saving projects.
2. Inspection results of acceptance conditions:
According to the relevant provisions of the "Uniform Standards for Acceptance of Construction Quality of Construction Projects", this project has completed the construction tasks according to the design requirements, and the project structure is safe and usage functions all meet the requirements, and the preliminary acceptance conditions for project completion have been met. After the initial inspection of the remaining individual details and finishing work, the construction and supervision units will put forward rectification requirements. After completing the rectifications as required, our company will submit a written report to the construction and supervision units.
____Construction Engineering Co., Ltd.
____Phase II Project Department
Project Manager:___
____year__month __Day
Please provide sample text 3 for application acceptance
__Municipal Public Security Fire Department:
The ___ school project, fire-fighting facilities and equipment developed by my unit The construction has been completed in accordance with the design and construction plan. The fire inspection company has conducted a comprehensive inspection of the fire alarm system level linkage system in this project and obtained the corresponding report. All the information is complete. I am now applying to your fire department for the fire protection acceptance of our project.
Hereby report!
Please provide sample text 4 for application acceptance
1. Project completion status:
__ County __ Home 1. The 2# building project was started by the 11th Project Department of __ County Housing Construction Company on November 15, 20__, and was fully completed at the end of March 20__, which lasted 16 months. The main project has been completed according to the design and approved plan, namely : Civil decoration and renovation projects; water supply and drainage projects; electrical equipment installation projects.
2. Inspection results of acceptance conditions:
According to the relevant national regulations, the project has completed the main construction tasks according to the design requirements. The investment in the project has been reasonably used, the completion documents have been fully prepared, the construction quality of the project has passed the quality inspection of the quality supervision station, and a "Project Quality Inspection and Assessment Report" has been issued. The quality of the project is qualified and the formal acceptance conditions are met.
3. Suggested acceptance time, location and participating units:
According to the completion of the project and the relevant requirements of the provincial and municipal authorities, __ County__ Home Building 1 and 2# The project completion acceptance work is proposed to be carried out on the year, month and day. The acceptance location is at. The participating units include project legal persons, design, supervision, construction, quality supervision and other relevant units.
In summary, the __ County__ Home Building 1 and 2# projects have met the conditions for completion acceptance. We sincerely request the superior authorities to arrange formal acceptance.
__ County Housing Construction Company Project Department
1. The construction unit should provide the following information when applying for completion acceptance of the construction project and fire protection filing
1. "Completion of the Construction Project" Acceptance Fire Protection Registration Form";
2. A copy of the "Construction Project Fire Protection Design Registration Acceptance Certificate" or a copy of the "Construction Project Fire Protection Design Review Opinion"
(1) Fire protection design If the filing is determined to be the subject of random inspection, you need to check in the filing system whether the fire protection design filing has passed the spot inspection. If it fails the spot inspection, you must also provide the "Fire Protection Design and Fire Protection Review Opinion of the Construction Project";
(2 ) If the fire protection design filing is not identified as the subject of random inspection, planning permission documents must also be provided. If a construction project that has been put into use before September 1, 1998 or has obtained a real estate certificate is required to apply for fire protection design filing, the building property certificate and other legal certification materials for the building can be provided;
3. Project completion acceptance report .
2. The construction unit that is randomly inspected shall provide the following materials to the fire protection agency of the public security organ within 5 days from the date of receipt of the registration certificate
1. "Fire Protection Registration for Completion Acceptance of Construction Projects" Form";
2. A copy of the "Acceptance Voucher for Fire Protection Registration of Construction Projects";
3. A copy of the "Acceptance Voucher for Fire Protection Design Registration of Construction Projects" or the "Acceptance Voucher for Fire Protection Design Registration of Construction Projects" Copy of "Design Review Opinion";
4. Legal identification documents such as the construction unit's industrial and commercial business license;
5. Legal identification and qualifications of the construction, engineering supervision, and testing units Grade certification documents;
6. Project completion acceptance report;
7. Fire-fighting product quality certification documents (compulsory product certification and certification inspection report of fire-fighting products, or type Approval certificate and certification inspection report, or type inspection report within the validity period; fire protection products that have not yet established national standards or industry standards should provide appraisal opinions and type inspection reports; the above information must be stamped with the official seal of the manufacturer, and provide product ex-factory qualifications Certificate);
8. Product type inspection reports for building components, building materials, and interior decoration materials that have fire protection performance requirements. Flame-retardant products and components used in public places are provided with "Flame-retardant Products" Logo Use Certificate" and inspection report;
9. Legally valid certification documents for fire protection facilities and electrical fire protection technology testing ("Fire Protection Facilities Qualification Documents" can be issued by institutions with corresponding fire protection facility testing qualifications: "Electrical fire protection technology testing qualification certificate document" is not required as filing information for the time being);
10. Fire protection product supply certificate (to be filled out by the manufacturer and stamped with the official seal);
11. _Construction plan and records for spraying steel structure fire-retardant coatings and a copy of the business license of the construction unit;
12. Concealed project records;
13. Construction project completion drawings (civil engineering and fire protection The facility construction unit shall stamp the completion stamp on the corresponding as-built drawings respectively).
3. Other requirements
For the masses who bring the "Project Completion Acceptance Report" and the "Construction Project Completion Acceptance Fire Filing Registration Acceptance Voucher" to the business window and ask for the seal of the public security agency's fire protection agency, If the filing acceptance voucher presented is consistent with the query result in the fire service hall filing system, and the above filing materials can be submitted, the window business acceptance seal can be stamped on the filing acceptance voucher.
Sample text for application for acceptance 5
____(unit name)
About ___ project completion acceptance application report
1. Project Completion status
The __ County (township) __ project was started by __ (construction unit) on __ month __ of __ year, and was fully completed by the end of __ year __, which took __ Months have passed and the main projects have been completed in accordance with the approved design (plan), namely:... (such as civil decoration projects, water supply and drainage projects, electrical equipment installation projects, etc.).
2. Inspection results of acceptance conditions
According to relevant national regulations, the project has completed the main construction tasks according to the design requirements. The investment in the project has been reasonably used, the completion documents have been fully prepared, the construction quality of the project has passed the quality inspection of the quality supervision station, and a "Project Quality Inspection and Assessment Report" has been issued. The quality of the project is qualified and formal acceptance conditions have been met.
3. Application for Project Completion Acceptance
Based on the completion of the project and the relevant requirements of the superior authorities, the leading group for the completion acceptance of the county construction project (project) is now applying for __ County ( Township) __ project completion acceptance work will be organized as soon as possible.
Hereby report
Name of applicant (stamped)
Year, month and day
Sample application letter 6 for acceptance
< p> The project completion acceptance application report is based on the project fund application report to comprehensively assess the availability of funds, fund use and management, completion of project construction content, construction project quality and technical equipment operation, production A project construction status statement issued after a series of project completions such as preparation status.1. Basis for completion acceptance
(1) Project approval (recording) documents, project fund application report, and project investment plan.
(2) Environmental impact assessment report and approval, energy conservation assessment report and review opinions, as well as approval of land, planning, production safety and other matters.
(3) National and provincial standards, specifications and product technical standards related to engineering construction, environmental protection, energy conservation, production safety, etc.
(4) Project supervision, bidding and important equipment and raw material procurement contracts.
2. Acceptance conditions
(1) The project is completed in accordance with the requirements of the fund application report and project investment plan, and the production and economic and technical indicators meet and can meet the production and use requirements. Production preparation work can meet the needs of production.
(2) The main process equipment and supporting facilities have passed the joint load trial operation, can produce qualified products that meet the requirements of the fund application report, form production capabilities, and can achieve expected economic and social benefits.
(3) The project quality meets relevant national standards and the products meet technical standards.
(4) Environmental protection, energy saving, production safety, fire protection and other facilities have been built and put into use simultaneously with the main project in accordance with the design requirements and meet national requirements.
(5) The final financial account report for project completion has been prepared and audited by an accounting firm with corresponding qualifications.
(6) Project technical documents and materials are filed as required and can meet the needs of production, use and maintenance.
The project basically meets the conditions listed in the previous paragraph. There are still sporadic civil works that have not been completed or a few non-major equipment are not in place. However, this does not affect the normal production and use of the main project, and the unfinished investment accounts for the total estimated investment budget. If the proportion is less than 10%, you can also apply for completion acceptance with the consent of the industry and information technology department and the financial department.
3. Completion acceptance content
(1) Investment completion status. Including the availability of project funds, the use and management of special funds for technical transformation, the audit of completed financial accounts and the bidding situation, etc.
(2) Completion status of project construction content. Including project land acquisition, civil engineering, equipment purchase and installation, construction of public auxiliary facilities, etc.
(3) Construction project quality and technical equipment operation status. Including the effectiveness of environmental protection, production safety, energy-saving facilities, fire-fighting facilities, etc.
(4) After the project is completed and put into production, the level of process equipment, product technology level, quality level, production capacity, economic and social benefits, energy conservation and environmental protection, and safety production, etc.
(5) Production preparation status. Including production working capital, raw material supply, energy supply, personnel training, etc.
(6) Project technical documents and data archiving status. Including approval, design, supervision, bidding and other aspects of documents, as well as construction and installation projects, process equipment, public auxiliary facilities and other technical documents and drawings filing status.
(7) The elimination of backward production capacity projects that need to be eliminated.
Sample document 7 for application for acceptance
Lin'an Municipal Environmental Protection Bureau:
This is Hangzhou Lin'an __ Co., Ltd., which has been approved by environmental protection on _month_20__ , it has been put into trial production on _month_, 20__ to date. Approval number: Lin Environmental Protection [200_] __ or registration form approval [200_] __; Project name: Annual production of ____ tons or (pieces); Address: ----------; Contact person: -----------; Contact number: ----------. According to the environmental impact assessment approval opinions, our company has entrusted ____ Environmental Protection Company to carry out planning and design, and has carried out the following environmental protection work in accordance with the design requirements:
1. Wastewater: A rainwater and sewage diversion system is implemented in the factory area, and rainwater is connected to Discharge from rainwater ditches (pipes) outside the factory; domestic wastewater. If there is no production wastewater, (the canteen wastewater is treated by the oil tank and then put into the underground wastewater treatment device) and other domestic wastewater is treated by the three-cell underground wastewater treatment device. Discharge in compliance with standards" and production wastewater shall be discharged in compliance with standards after being treated by ____ method.
"After the wastewater from enterprises in the park is pre-treated and meets the management standards, it will be included in the park's sewage pipe network together with domestic wastewater (a copy of the wastewater management agreement is attached)".
2. Waste gas: After the __ waste gas produced in the __ process is collected by the fan, processed by the __ adsorption purification device, it is discharged through the __ meter high chimney; the boiler waste gas is dedusted by the water film After treatment, it is discharged through a __ meter high chimney. The dust removal wastewater is dosed and precipitated in a three-format sedimentation tank and then recycled without being discharged.
3. Noise: The mechanical equipment has been installed with anti-vibration sound insulation pads. All doors and windows in the workshop are made of sound-insulating glass for sound insulation. Doors and windows are sealed and closed during production and processing to ensure that noise emissions can meet the standards.
4. Solid waste: (1), industrial waste: classified and collected for comprehensive utilization; (2), domestic waste: after unified collection, it is regularly collected and disposed of by the environmental sanitation department.
4. Dust: Use ____ dust removal facilities to collect and treat it and then discharge it to meet the standards.
5. Canteen oil fume: An oil fume purifier has been installed, and the generated oil fume exhaust gas is discharged at high altitude after being treated by the purifier (or there is no canteen in this project).
Now that everything has been implemented, I would like to request your bureau to organize completion acceptance monitoring of the environmental protection facilities supporting our company's construction project. (Environmental impact assessment materials and approval documents are attached, and park enterprises need to provide sewage management agreements)
Hereby report!
Hangzhou Lin'an__ Co., Ltd. (seal)
____month__day, 20__
Sample application form 8 for application acceptance
Note: This form must be submitted in duplicate (original); national confidential projects must be submitted in each country Mark the confidentiality level on the application materials.
Shanghai __ Bureau System 20__-3
Statement: It is hereby confirmed that the content filled in this application form and the attached documents and materials are true. I/my organization promises to be responsible for the authenticity of the materials submitted and bear the consequences of untrue content.
(Seal of the construction unit)
Construction Project Completion Environmental Protection "Three Simultaneities" Acceptance Registration Form
Project Manager (Signature):
p>
Form-filling unit (seal): Filling-in person (signature):
Note: 1. Emission increase or decrease: (+) means increase, (-) means decrease
2. (12)=(6)-(8)-(11), (9)= (4)-(5)-(8)- (11) +(1)
< p> 3. Units of measurement: wastewater discharge—10,000 tons/year; waste gas discharge—10,000 standard cubic meters/year; industrial solid waste discharge—10,000 tons/year; water pollutant discharge concentration—mg/ Liter; air pollutant emission concentration - mg/cubic meter; water pollutant emission - tons/year; air pollutant emission - tons/yearPlease provide sample text for application acceptance 9
___Construction unit
The first bid section of the Wushan East Road roadbed project undertaken by our company has been completed. The supervision unit has verified that the quality of the projects in this branch is qualified, and the quality control data and relevant functional testing data are complete. To this end, your unit is specifically requested to organize the acceptance of the ancillary structures branch project before November 26, 20__. All technical archives of this sub-division project have been organized in accordance with relevant regulations and sent with the report for future reference. < /p>
The Xinjiang Electric Power Engineering Quality Supervision Center Station hereby appoints our unit to be responsible for the construction of the Shichengzi Level 1 Hydropower Station Project and the Shichengzi Level 2 Hydropower Station Project. The project construction has been completed in accordance with relevant national regulations and design requirements. We are now submitting an application for acceptance to your organization.
1. Project completion status
The Shichengzi Level 1 Power Station project is designed by the Engineering Design Institute of Sichuan University, supervised by Yunnan Lubuge Consulting Co., Ltd., and overseen by Xi'an Municipal Water Conservancy Engineering Construction Group Co., Ltd. is responsible for the construction. The project started construction in June 20__ and was fully completed by the end of January 20__, which lasted 19 months.
All projects have been completed in accordance with the approved design plan, namely: water diversion system project and factory hub project. The Shichengzi secondary power station project is designed by Sichuan University Engineering Design Institute, supervised by Sichuan Chengdu Kejian Water Conservancy Civil Engineering Supervision Co., Ltd., and Xi'an Water Conservancy Engineering Construction Group Co., Ltd. is responsible for construction. The project started construction in September 20__ and was fully completed at the end of November 20__, which lasted 14 months. All projects have been completed in accordance with the approved design plan, namely: water diversion system project and factory hub project.
2. Inspection results of acceptance conditions
According to the relevant national regulations, the project has completed all construction tasks according to the design requirements. The investment in the project has been reasonably used, the completion documents have been fully prepared, and the construction quality of the project has passed the inspection and acceptance of the Hami Regional Water Conservancy Quality Supervision Station. The quality of the project is qualified and the conditions for formal acceptance have been met.
Your company’s stationmaster Jia and his party went to the site in __ month 20__ to conduct preliminary acceptance, and proposed the installation of hydraulic generator sets, electrical installation, civil construction parts and acceptance data in the construction project. Valuable comments and suggestions. These suggestions are of great benefit to the quality of the Shichengzi primary and secondary power station projects. We have sorted them out one by one and urged relevant personnel to rectify them one by one. The rectification work has been completed first.
3. Application for Project Completion Acceptance
Based on the completion of the project and the relevant requirements of the superior authority, I would like to apply for your company to accept the Shichengzi first-level power station project and the Shichengzi second-level power station project. Organize the acceptance work; apply for us to start the unit on March 25, 20__ and enter the trial operation stage.
Hereby apply
Hami Ruiheng Hydropower Co., Ltd.
20__-__-__
To apply for acceptance, please provide 10 sample articles. :
★ 5 project application reports
★ 2019 selection of completion acceptance application report templates
★ Project application acceptance report templates
< p> ★ Project application acceptance report sample★ Project acceptance application report sample
★ Environmental protection acceptance application template
★ Fire protection acceptance application template
★ Simple Completion Acceptance Application Sample
★ Selected Environmental Acceptance Application Report Sample
★ Engineering Project Application Report Sample Template