Seven model essays on applications for assistant engineers
In this era of rapid development, various applications appear frequently, and different applications are available in different usage scenarios. How should we write an application? The following are seven applications for assistant engineers that I have collected and sorted out for reference only. Welcome to read them.
application for assistant engineer 1
Dear company leader:
I apply for being a sanding process engineer.
Name: Zhu Fengjiang, born in Wuzhou, Guangxi in November 1981, a member of the Youth League, joined Guangxi Sanwei Forest Products Industry Co., Ltd. in March 2xx.
from July 2xx to July 2xx, I worked in the sanding class of MDF factory as a team leader.
since July, 2xx has worked in the sanding section of high fiber board factory. He used to be the belt leader of the sanding section, and now he is the deputy section chief of the sanding section.
1. Brief introduction:
1. Familiar with the working principle of LUKKI, sander and CTS wire sawing, with rich operating experience and the ability to train new employees in operation technology.
2. Through years of study, I have a deeper understanding of the structure and working principle of the sander.
3. Proficient in sanding technology and horizontal proofreading of sanding roller of sander, able to correctly judge the reasons for the failure of sander and make correct and effective adjustments to restore the performance of sander.
2. Brief description of moral character:
1. Since I joined the company, I have been working hard and seriously. When there are problems with sanding equipment, I am always on call, working overtime and never complaining.
2. During this period, I experienced two extraordinary floods in 2xx and 2xx.
3. During the period of repairing the sand roller of the sander from June to September, 28, I worked overtime for many times, and
I worked hard against time to resume normal production as soon as possible.
3. Main achievements:
1. In July, 2xx, I participated in the debugging of LUKKI, Sander and CTS saws in high fiber board factory, which shed hard sweat for the smooth production of the production line, and at the same time, I learned from foreign experts with an open mind, which greatly improved my skills.
in July, 2xx, after I brought out a new belt leader, I served as the deputy section chief of sanding section, in charge of sanding technology, and was proficient in the maintenance and adjustment of technology and sander.
in March and June of 2xx, after four years' operation, the middle part of the sand roller was seriously worn, and the tolerance on both sides of the wide panel of Mitsudeki was .25mm thinner than that in the middle, which seriously affected the quality of the product. Under the leadership of the company and the factory department, I participated in the repair work of 1 #-4 # sand roller of sander. Through hard work, the tolerance difference between the middle and both sides of the repaired wide-faced plate is less than .5mm, which fully meets the tolerance requirements. In the process of repairing and adjusting the sand roller, I humbly learned from my peers about the maintenance and adjustment of the sander, which further improved my level.
in July, 2xx, under the correct leadership of the company and the factory department, I assisted Stanley Mongolian abrasive belt supplier and Anhui Brother abrasive belt supplier to successfully try out their abrasive belts and put them into use, so that each abrasive belt saved 246 yuan compared with the original SIA abrasive belt, saving the company about 5, yuan every year.
in may and August of 2xx, I participated in the QC technical transformation activity of "optimizing plate feeding mechanism to improve production efficiency" in sanding section, which improved the maximum production capacity of the production line by 18% and won the title of excellent QC group in the autonomous region.
6. Through continuous learning, my operation level has been continuously improved. I have written new Sanding Operation Instruction, CTS Wire Sawing Operation Instruction, and Chinese-English Comparison Table of Sander Fault Alarm, all of which were taught to the operators without reservation. The operation level of the three belt supervisors and four sanding operators brought out can be unique.
during my seven years working in the company, I got the care and careful training from the leaders of the company. With my efforts, I grew from an intern who knew nothing about the production process of wood-based panels to a technical backbone of the company. This selection of engineers is not only an affirmation of my past achievements, but also an incentive for my future work. In the future work, I will definitely study harder to improve my level in an all-round way and become a more useful person to the company. To
Salute
Applicant: Zhu Fengjiang
2xx March 23rd Application for Assistant Engineer 2
Dear leaders:
I graduated from xx College in July with a major in thermal energy and power engineering, and in July of the same year, I joined the engineering department of Beichuan Zhonglian Cement Co., Ltd. as a technician of waste heat power generation project. Through three years' work, I got a sublimation in my professional skills, and realized the transition from theoretical level to practical operation. There was a lot of hard work and laughter, not only the improvement of my professional knowledge, but also my ability was recognized by my colleagues and leaders.
When I recall that I just went to work knowing nothing, I feel comfortable at work now, and it seems like yesterday. When I first came here, I didn't know what waste heat from cement was. Under the patient explanation of the leader, I went deep into the field to look at it, combined with the feasibility study report, and scrutinized it. After reading the report, I became familiar with the whole process of waste heat power generation, and learned about equipment selection and parameter determination. I have a certain understanding of this new field, let me know it and study it. After day and night efforts, I know the three main equipment of the power generation system, and I know the rated parameters of the steam turbine. After studying in the field, I know the "bridge" between the power generation system and the cement line. After asking the master, I understand the close relationship between power generation and cement clinker calcination.
in February of 2xx, the civil construction of waste heat power generation project finally broke ground, and with the concerted efforts of the general contractor and Qi Xin of the construction unit, it finally took a historic step. I have witnessed everything from the excavation of pile foundation in civil construction to the modeling of the overall frame structure of the central control room. Among them, I also know some knowledge of civil engineering. With the intense construction, factories have gradually sprung up.
then, according to the arrangement of the company's leaders, 1 people were led to the brother unit Lunan Zhonglian waste heat power generation for power plant internship in March. I live up to the expectations of the company leaders. While learning my professional skills well, I strictly demand the students' internship style, correctly guide them to learn every knowledge point of power plant operation, and regularly check and urge them to learn from each other and improve each other, so that the students have developed a good learning atmosphere. After four months of hard work, they have successfully completed the internship task.
2xx returned to the company in August, and participated in the installation of three major host devices. This is undoubtedly a good opportunity to exercise myself. I studied the blueprint carefully, became familiar with the locomotive major, and strictly controlled the quality at the scene, from which I learned a lot that I couldn't learn from books. Next, the boiler is boiled and blown, and then the electrical system is powered backwards, etc., until the one-time grid-connected power generation is successful on October 17.
summing up three years' work, I have too many gains and feelings. First of all, thanks to the care and help of leaders and colleagues, I would like to express my gratitude here. In my future work, I will strive to do better, strengthen theoretical study, accumulate work experience, hone myself, exercise myself and improve myself in practice.
Through my work and study in the past three years, I feel that I meet the post requirements and apply for promotion as an assistant engineer. At the same time, I also hope that this review will be an opportunity to promote my progress and lay the foundation for better achievements in the future. Please organize an assessment review.
To
Applicant: xxX
Application for Assistant Engineer on xx, XX, XX 3
Dear leaders:
Hello! My name is Yang xx. I am 3 years old, with a college degree. I have been working in the locomotive depot of xx Railway Branch since 2xx, and I have worked for nine years. Now I am working as a technician in the monitoring station of xx Railway Locomotive Depot. During these nine years' work, I have not only deepened my understanding of what I have learned, but also got a further understanding of what I have not touched or touched deeply in previous books. Since my work, under the careful training and instruction of the unit leaders, I have made great progress in my thoughts, studies and work through my own continuous efforts.
Summarizing my work in the past nine years, I deeply feel four words: there is no end to learning. Especially for a technician, it is necessary to have a good understanding ability and a certain innovation ability. As a technician in the monitoring station, I know that the responsibility of ensuring transportation safety is great, which requires good technical ability and a wide range of knowledge. With the care and help of leaders and colleagues, I have made some progress. In the future work, I will strive to do better, strengthen theoretical study, accumulate work experience, hone myself, exercise myself and improve myself in practice, and contribute my own strength to xx.
After nine years' work and study, I feel that I have met the post requirements and applied for promotion as an assistant engineer. At the same time, I also hope that this review will be an opportunity to promote my progress and lay a foundation for better achievements in the future. Please organize an assessment review.
this is a
salute
signature: xxx
time: 2xx xx application for assistant engineer 4
Dear leaders:
Hello! My name is Yang Kuo. I am 3 years old, with a college degree. I joined the locomotive depot of Shenshuo Railway Branch in 2xx, and I have worked for nine years. Now I work as a technician in the monitoring station of Shenshuo Railway Locomotive Depot. During these nine years' work, I not only deepened my understanding of what I have learned, but also got a further understanding of what I have not touched or not touched deeply in previous books. Since my work, under the careful training and teaching of the unit leaders and through my own continuous efforts, I have made great progress in my thoughts, studies and work.
summing up my work in the past nine years, I deeply feel four words: there is no end to learning. Especially for a technician, it is necessary to have a good understanding ability and a certain innovation ability. As a technician in the monitoring train station, I know that the responsibility of ensuring transportation safety is great, which requires good technical ability and a wide range of knowledge. With the care and help of leaders and colleagues, I have made some progress. In the future work, I will strive to do better, strengthen theoretical study, accumulate work experience, hone myself, exercise myself and improve myself in practice, and contribute my own strength to Shenshuo.
After nine years' work and study, I feel that I have met the post requirements and applied for promotion as an assistant engineer. At the same time, I also hope that this review will be an opportunity to promote my progress and lay a foundation for better achievements in the future. Please organize an assessment review.
Here's to
Salute
Applicant: Yang Kuo's Application for Assistant Engineer Chapter 5
Dear judges:
I am * * *, born in June, 19xx in Sichuan Province. 2xx successfully completed four years of college study and life in July, and I have been working in the city for only two years. However, during these two years, I have successfully completed the change of environment and role from a student who just graduated from college to an employee who has stepped into the unit through hard study and open-minded consultation. It is my dream to become an assistant engineer after graduation, and I solemnly apply to the unit.
In order to make it easier for the judges to inspect themselves, I will report my work in the past two years to the judges:
First, I am strict with myself and my political and ideological consciousness has been improved.
In the past two years, I have loved the motherland, the Party and socialism, strengthened my belief in * * * and kept a high standard with party member. Conscientiously implement the party's line, principles and policies, be proactive, work diligently, be fearless of difficulties, be conscientious, work hard, and make contributions within one's capacity in ordinary posts.
second, strengthen theoretical and professional study, and constantly improve their overall quality.
As a college graduate who has just stepped into the society, I clearly see that the stage of life has changed and I lack work experience, so only by constantly strengthening my study and enriching myself can I better show myself on the stage of life. Over the past year, I have always insisted on studying while working, and constantly improved my overall quality level.
third, work hard and finish the task seriously.
Pay attention to work, obey the arrangement of the leader, try to familiarize yourself with the working environment and content in the shortest possible time, and earnestly complete every task assigned by the leader; Check every detail of the work, summarize and analyze the work experience, and always put the interests of the company first.
The above is a summary of my basic situation in the past two years. Looking back on my work in the past two years, I have made great progress in thought, study and work, and I have grown up a lot, but I am also clearly aware of my shortcomings: First of all, I am far from in-depth in theoretical study, especially my ability to apply theory to practical work; Secondly, in the work, the work experience is still shallow, and the professional knowledge is not detailed enough, not solid enough, not enough, and not enough to master, which makes the work passive. If I can be appraised as an assistant engineer this time, it will be an affirmation of my two years' work. In the future work, I will make full use of my strengths and avoid weaknesses, overcome my shortcomings, study hard, work hard, be proactive and do my work better, and become a qualified and outstanding assistant engineer. If I don't accept my request, I will not be discouraged. I can only show that my work is not in place enough, find out the problems, continue to struggle for them and get closer to the requirements of an assistant engineer.
To
Salute
Applicant: xxX
Application for Assistant Engineer on xx, XX, XX, XX
Dear leaders:
I graduated from Gansu Iron and Steel Vocational and Technical College in June, 2xx, majoring in mechanical design and manufacturing. In June of the same year, I entered the electric arc furnace workshop of the special material branch of Sinocolor Ningxia Oriental Group Co., Ltd. and engaged in the task of smelting before the furnace. In the course of these three years' work, I not only deepened the knowledge I had learned, but also had a profound understanding of various interpersonal relationships and made myself greatly improved.
after taking part in the work, I was assigned to the packaging work of 5 ferrovanadium. In the last process of this product, I realized that the product is the image of the enterprise and the quality is the reputation of the enterprise, laying a good foundation for producing high-quality products in the smelting work in the future. Then workshop deployment, I went to the charging system of ferrovanadium and participated in the batching and charging of various materials in the production process. Batching is a very important preparation for smelting, which directly affects the speed of smelting and the quality of products, the improvement of the metal yield of material consumption, the life of the furnace, and so on. Reasonable batching, multi-furnace operation and control.