Frame-tube Structure Design (1998.02 Journal of Building Structure)
Treatment of beam-column joints of high-strength concrete columns (building structure, May 2000)
On the applicable height of slab-column structure (Journal of Building Structure, 2003,438+0)
Technical measures for structural specialty of Beijing Architectural Design and Research Institute (edited by 1992, welcomed by all design units in China)
Data Set of High-rise Building Design (edited in 2002, expected to be published in the spring of 2004, with the participation of major domestic design institutes, printed by Architectural Engineering Press, and edited by Wang Dasui, Fu and Mo Peiqiang. )
Six, participate in the preparation of national standards and local standards:
1, Code for Design of Concrete Structures (GB500 10—2002)
2. Technical Specification for Concrete Structures of High-rise Buildings (JGJ3—2002)
3. Code for Survey and Design of Building Foundations in Beijing Area (DBJ01-501-92).
4. Editor-in-Chief of Technical Specification for Large Diameter Cast-in-place Piles in Beijing (DBJ0 1—502—99)
Beijing Xiyuan Hotel
1979- 1980 Beijing xiyuan hotel, 73,000 square meters, the first Chinese-foreign cooperative design in China, with many innovations:
1. There is no settlement joint between the high-rise building (23rd floor) and the podium (natural foundation).
2. The first one adopts post-pouring belt technology.
3. Prestressed composite slabs are widely used in high-rise buildings for the first time.
4. The first one uses reinforced concrete wall as frame-supported beam (supporting 20 floors).
Breaking the routine, bringing forth the old and bringing forth the new —— By Cheng (), an architectural expert
Cheng's daring to "foul" is famous in Beijing Architectural Design and Research Institute.
65438-0979, appointed to design Xiyuan Hotel with British and American designers. Mao Cheng, who is in charge of structural design, actually "fouled" three times in a project.
According to the specifications, there should be gaps between buildings with different heights to prevent different ground settlements due to different weights. With a stroke of a pen, Mao Cheng combined the 23-story main building and the 3-story podium into one. Shorten the construction period and improve the overall seismic performance. Traditionally, cast-in-place concrete must be shuttered. He devoted himself to the research and invention of prestressed composite slab, which not only did not need formwork, but also obtained the overall seismic capacity of cast-in-place concrete, thus "violating" the second provision. He is also the first self-designed revolving restaurant in China, which not only breaks through a forbidden area, but also is better than the design of Nanjing Jinling Hotel abroad.
Not long ago, Cheng Maohan created a new technology of "dynamic reinforced high-strength concrete" and pile-wall integration in the structural design of Beijing New Century Hotel, which made two "exceptions" and saved a lot of construction funds. Starting from the department stores and Xinqiao Hotel in 1950s, Mao Cheng has designed countless projects. Nowadays, many "foul" actions created by the old man who is over 60 years old and is the executive deputy chief engineer are becoming new building codes. Asked about his greatest wish, he said: I hope more young architects can take advantage of the technical loopholes in a down-to-earth manner and then "break" his rules.