Current location - Trademark Inquiry Complete Network - Trademark registration - What does the template yard of building construction mean?
What does the template yard of building construction mean?
The theme of material field standard practice provides you with relevant materials and video courses. You can download the materials of standard practices in the material yard for reference, or watch relevant video courses to improve your skills. For more details, please check the hot recommendation of social construction in Zhu Long.

Schematic diagram of Vanke material stacking standard practice (civil engineering part)? View details

This post was finally edited by Mango 10 16 on 2012-1416: 03. A6: Plywood stacking requires covering and cushion, the ground is hardened without water, and the stacking height is ≤ 2m. A7: The stacking of wooden Fang requires a cover and a pad, the ground is hardened without water accumulation, and the stacking height is ≤ 2m. A8: Steel pipes shall be piled on the ground with no water accumulation, and the stacking height shall be less than 2m. Rusted steel pipes must be protected with antirust paint. A9: The stacking of screw rods requires that the ground is hard and waterless, with the upper cover and the lower cushion, and the stacking height limit is ≤1.2m. The stacking height limit of steel pipe scaffold is ≤ 2m, and the rusty screw rods must be protected by antirust lubricating oil. A 10( 1): The semi-finished formwork shall be piled on the ground with no water accumulation. A semi-finished template yard is set up beside the centralized processing plant, and templates of different sizes are separated by steel pipes. Each size of the template is hung with eye-catching signs, and the stacking limit is ≤ 2m.

Key words:? Standard practice for project coverage? Image planning of construction site

I. Overview of the project? 1, project overview? The project consists of two towers, A and B, with five floors underground, A * * tower with 65 floors, building height of 3 18m, B * * tower with 3 1 and building height of 180m. It is a comprehensive building integrating hotels, apartments, offices and businesses, with a total construction area of about 40. 2. Overview of coverage map. The temporary building of this project is mainly an office area. It is arranged on the southeast side of the project, close to Hong Zhuan South Road, and located in the convergence road area outside the red line. ? The office area is set as a box building, which conforms to the CI image of the company and meets the office requirements of the project. 2. The site general layout project plans to set up three gates. The main gate 1 is located in the southeast of the project site, facing Hong Zhuan South Road, which is the entrance of the project construction personnel and the secondary entrance of the material vehicle; Gate 2 is located in the east of the project site.

Note: 1. The steel assembly passage is mainly used to set up an annular passage in the floor for the transfer of personnel and small machinery. 2. Channel units with a length of 3m and a width of 800mm should be adopted for assembly, and the spacing between transverse reinforced bars should not be greater than1m.. The channel length can be slightly adjusted according to the spacing of steel beams, but it should not exceed 4m. 3. The mesh diameter of steel wire mesh should not be greater than 50mm, and it should be welded with channel steel. Step 4 pass the exam

1. What are the main points of building area display? Sample first:? 1. Require the general contractor to require the construction of the construction method model area? 2. The general contractor shall be responsible for the method training of each labor team? 3, the project company engineering department and supervision records, supervision? Construction method template construction:? Clear control points; ? Standardize node details; ? The project department, the supervision unit and the owner shall implement it after passing the acceptance. ? Construction method disclosure model training:? Conduct training disclosure on construction method templates for all labor teams entering the site; ? Combined with visual exposure. Second, the construction method model area display? Craft Exhibition: Frame Structure Template? Process description: the horizontal spacing of scaffolding is 1 100, which is 300 from the beam edge. Scaffolding is arranged at the bottom of the beam.

?