Buyer's documents:
Obtain the draft design and make the process sheet as required. After that, it will be submitted to the factory for proofing, and the sample confirmation should pay attention to the embroidery of the raw material gram size pattern. In short, the confirmed samples are difficult to change and any problems are difficult to remedy, so be serious and show them to the boss. After confirming the sample, place an order with the factory.
Factory documentary:
1 Be familiar with the order data and ensure that the pattern materials of the samples are consistent with the graphic requirements of the order. Pay attention to the delivery date and individual special requirements,
2 During the production process, pay attention to whether the technical requirements such as drawing size are up to standard through sampling, and report the problems in time when found.
After getting off the plane, the sewing head will be assigned, and there will be basically no problem in this link. The main attention is to grasp the time and not delay it, so as not to affect the next process.
4. Then send it to the modeling room, check and measure it every day, and the modeling is on the right. Pay attention to sudden problems at any time, such as fading or loose rubber bands after high temperature setting, and report the defective products that fail to pass the batch in time (of course, this is an accident that happens occasionally).
5 Set it and send it to the packing room. When the merchandiser checks, pay attention to whether the packaging of the bulk goods is consistent with the packaging samples. This is also part of the inspection. With packaging, you will find defective products. If there are too many defective products and the order surplus is not enough, it will be reported immediately and the machine will make up the quantity (this is also an occasional accident). Pay attention to the packaging details such as trademark barcode, and pay attention to the volume requirements of compressed package.
Some socks are divided into left and right feet. If the construction period is relatively short, pay attention to matching and send it to the finalized package, and you can't mix it up, which requires more energy.
When delivering goods, the quantity, type and placement position are very clear, which batch can customers take first to install?
In a word, you should run more when you do things, and the most important thing is to be responsible. Each process needs a merchandiser to supervise the reporting and coordination.