Current location - Trademark Inquiry Complete Network - Trademark registration - Where is Huanglongtan Hydropower Station located in Hubei Province?
Where is Huanglongtan Hydropower Station located in Hubei Province?
Huanglongtan Hydropower Station in Hubei Province is a patriotic education base.

Hubei Huanglongtan Hydroelectric Power Plant (hereinafter referred to as Huanglongtan Power Plant) is located at the east foot of Qinling Mountains, at the exit of the canyon four kilometers west of Huanglong Town, close to Xiangyu Railway and National Highway 3 16. The power plant is located in the downstream of the largest tributary of Hanshui River, about 40 kilometers away from Danjiangkou Reservoir, the water source of South-to-North Water Transfer Project. It is a bright pearl of hydropower on the river.

Huanglongtan Power Plant is directly under the State Grid Corporation of Hubei Electric Power Company and its only subordinate power plant. The enterprise type is large. The power plant mainly generates electricity, with an installed capacity of 5 1 1,000 kilowatts. It is the largest hydropower station in the basin at present, with comprehensive functions such as urban water supply, flood control, shipping and aquaculture. The power plant is mainly responsible for peak regulation, frequency modulation and emergency standby of Hubei power grid. By March of 20 1 1 year, 26 billion kwh had been generated, which made great contributions to Hubei electric power industry and Shiyan economic and social development.

First, the days when we live-Huanglongtan Power Plant and Automobile City grow together.

Huanglongtan power plant project was an important "third-line project" in that year, and it has been more than forty years since it was started. 40 years ago, the power plant was planned, designed and started construction simultaneously with the No.2 Automobile and Yu Xiang Electrified Railway. Over the past 40 years, power plants and automobile cities have grown together, witnessing the development of Shiyan city.

The geological survey of Huanglongtan power plant project was carried out on 1959, and a preliminary design report was formed on 1967, which was jointly reviewed and approved by the Ministry of Water and Electricity and the Hubei Provincial People's Government on 1968. On April 2nd, 1969, the Huanglongtan power plant project with an investment of 654.38+73 million yuan was officially started. After five years of hard work, in May and June of 1974, two hydro-generator sets with an installed capacity of 75,000 kilowatts were put into production one after another. By the end of 1976, the dam was poured and the project was completed.

1993 65438+ 10, Huanglongtan power plant began to upgrade the capacity of 1 and No.2 hydro-generator units, and the installed capacity of the two units after the renovation was 85,000 kilowatts. 1in March, 1998, the power plant completed the transformation of the computer monitoring system and became one of the first few hydropower plants in the province to realize unattended operation.

In March 2002, the expansion project of Huanglongtan Power Plant was approved by the State Council. On June 28th, the expansion project with a total investment of 583 million yuan started construction. In June and August of 2005, two units with installed capacity of 6,543.8+0.5 million kilowatts were put into operation one after another, and the total installed capacity of the power plant reached 5,654.38+0.5 million kilowatts.

Second, the "four elites" are first-class-the "one dream" of Huanglongtan people

In September, 2007, Huanglongtan Power Plant put forward the working goal of building a flowing water power plant with fine management, excellent technology, capable team and profound culture at the eighth Party Congress. February 20 1 1 year, further defined the "Twelfth Five-Year" development goal of initially building a "four refined" first-class enterprise in 20 15 year.

In order to realize this dream, Huanglongtan people broke the traditional thinking and went to the advanced hydropower plants in Central China, East China, Northwest China, Northeast China and other regions to investigate, and adopted hundreds of forces to form their own high-standard management system, workflow and action norms. In May of 20001year, the power plant passed the ISO900 1:2000: 2000 quality management system certification, becoming one of the few hydropower plants in China and the first in the province to pass the certification. In February 2004, the power plant began to implement the performance management system. At present, four systems, namely, employee performance, middle-level cadre performance, team performance and unit performance, have been implemented, and a full-staff, all-round and whole-process performance management system has been realized. Since the establishment of information management (MIS) system and office automation system in 200 1, production management system, collaborative office system, enterprise resource planning (ERP) system and other management systems have been established, and the power plant has changed from paperless office to information management and intensive management, constantly improving its own production management level, and marching towards the journey of capturing a domestic flowing water power plant.

Three, the national record-the achievements of the people of Huanglongtan in safety production.

During the construction of Huanglongtan Power Plant, we are in the era of "building socialism quickly, economically and vigorously". The project has the typical characteristics of "design, reconstruction and construction at the same time", leaving many problems and hidden dangers. In addition, from the point of view of unit equipment, the power plant not only has electromechanical equipment in the 1960s and 1970s, but also has the most advanced automation equipment at present. The infrastructure of safe production is poor, the equipment conditions are complex and there are many difficulties.

Faced with these problems, Huanglongtan people use their wisdom and sweat to vigorously promote technological innovation, constantly solve and eliminate problems and hidden dangers, and ensure a good situation of long-term safe production in power plants. 1982, the Ministry of Water and Electricity developed and designed the first set of automatic hydrological forecasting system in China with Huanglongtan Power Plant as the pilot unit. 1988, the telemetry system was put into use, which realized the functions of automatic collection and transmission of water and rain data for 24 hours and online tracking and forecasting, and the forecasting period was 3-5 hours earlier than manual operation. Later, satellite cloud image receiving and processing system, industrial TV monitoring system, automatic gate control system, reservoir operation data uploading system, integrated automation of reservoir dispatching and other systems were built one after another, and * * * became the modern water regime working platform of Huanglongtan Reservoir, and the reservoir dispatching was automated. The automatic forecasting system of water and rain conditions and the automatic system of reservoir dispatching are at the leading level in China.

Huanglongtan people adhere to the policy of "safety first, prevention first", the sense of responsibility of "walking on thin ice, approaching the abyss, and being on pins and needles", and the management idea of "responsibility to people, measures in place, supervision to work", and have made brilliant achievements in safety production. On May 30, 2000, our plant operated safely for 3808 days, setting a record for the safe operation of hydropower stations with a capacity of over 654.38 million kilowatts in China. In 2004, it operated safely for 4,592 days, creating a new record for the safe operation of 65,438+10,000 kilowatts hydropower plants. By May of 20 1 1 year, our factory has been running safely for 323 1 day. By February of 20 10, the dam has been safe for 30 consecutive years.

Fourth, the "April 4th" team-Huanglongtan people's thought of strengthening enterprises with talents

Huanglongtan Power Plant adheres to the concept of "strengthening enterprises with talents" and forms a "four-four" team construction model. That is, building a "four good" leading group with "good political quality, good business performance, good unity and cooperation, and good style and image"; Build a team of "four firsts" middle-level cadres who are diligent in study and thinking, strict in fine management, excellent in work performance and honest; Build a "four excellent" party member team with "excellent political quality, excellent job skills, excellent work performance and excellent evaluation by the masses"; Build a "four-class" workforce with "first-class professional level, first-class business skills, first-class work style and first-class post performance". "Four Four" teams complement each other, forming professional teams at different levels in Huanglongtan Power Plant, which provides a strong talent guarantee for the scientific development of power plants.

Five, Huanglong out of the beach-Huanglong beach people's pioneering and development belief

Pioneering Huanglongtan people began to explore new development fields as early as the 1980s, and have formed diversified development patterns in many fields, such as hydropower business operation and maintenance, hydropower simulation training, urban water supply, real estate production, property management, hotel catering, tourism, scientific and technological information and so on. Huanglongtan people have also changed from their previous "inside the wall" work and lifestyle to struggling in the tide of market economy.

In 200 1 year, Huanglongtan power plant entered the international commercial operation field of hydropower plants, and in 10, it undertook and successfully completed the operation and maintenance project contract of Kililong I hydropower station in Cambodia. Since 2005, we have carried out business maintenance and operation with Nanzhang Xiakou Hydropower Station, Yunxi Sunjiatan Hydropower Station, Yunxi Doulingzi Hydropower Station, Zhushan Songshuling Hydropower Station, Xiangfan Tailwater Hydropower Station, Huanggang Luotian Paradise Pumped Storage Power Station, Zhuxi Qin Ping Hydropower Station, Shennongjia Yuquan River I Hydropower Station and Sichuan Longfeng Hydropower Station, and exported our management experience and model. The power plant has also conducted hydropower simulation training for groups, power plants and colleges such as Yanghu Lake in Tibet, Guodian Changyuan, hubei energy and Three Gorges University.

Huanglongtan Hydropower Industrial Ecological Park is a national 3A-level scenic tourist area, an industrial tourism demonstration site in Hubei Province, a popular science education base in Hubei Province and Shiyan City, a patriotic education base in Shiyan City (the patriotic education base in Hubei Province is under examination and approval) and a civilized tourist scenic spot in Shiyan City. There are scenic spots such as Huanglongtan Reservoir, Sakura Avenue, Yangmei Avenue, bonsai garden, Hong Fenglin, Ginkgo Garden and cherry orchard, as well as corporate culture exhibition hall, hydropower science exhibition hall, Huanglongtan dam, power plant, substation and other hydropower industry science popularization facilities, sports ground, tennis court, basketball court, gymnasium, development base and other leisure facilities, as well as service facilities such as tourism, catering and accommodation, making Shiyan a beautiful city.

Six, let a hundred flowers blossom-the cultural glory of Huanglongtan people

Under the leadership of State Grid Corporation, Huanglongtan Power Plant takes "honesty, responsibility, innovation and dedication" as its core values and "striving to surpass and pursue Excellence" as its entrepreneurial spirit, and is committed to building a unified and excellent corporate culture. Corporate culture exhibition hall, cultural corridor, cultural wall and cultural road have been built, forming a strong corporate culture atmosphere. Compile the internal magazine "Yellow Dragon Pool", build the spiritual home of employees and create a business card for cultural exchanges inside and outside the industry. Facilities such as factory homepage, window, publicity column and LED screen have also become important carriers of cultural exchange and publicity. In addition, the power plant has been carrying out theme reading activities such as cadres' reading, young workers' reading and women workers' reading for many years, and has formed amateur learning platforms for employees such as "Kowloon Night School Class", "Monitor Class", "Weekend Class" and "Accounting Class". The stronger the "scholarly" yellow electricity atmosphere, the more fashionable the cadres and workers are to study and study, and the more typical successful people emerge one after another.

The construction of corporate culture has given birth to fruitful achievements in the construction of civilization. Huanglongtan Power Plant has been rated as "Civilized Unit of Hubei Electric Power Company" for 27 consecutive years, "Best Civilized Unit of Hubei Province" for 5 consecutive years and "Best Civilized Unit of Shiyan City" for 6 consecutive years. It has successively won many provincial and ministerial honorary titles, such as the national advanced unit of spiritual civilization construction, the winner of the national ankang cup competition, the national home of model workers, the national advanced unit of open and democratic management of factory affairs, the civilized unit of State Grid Corporation, the May 1st Labor Award of Hubei Province, and the advanced unit of safe production of Central China Power Grid Corporation.

Civilization construction and upgrading, a new chapter in scientific development. Looking back, Huanglongtan people have made unremitting efforts on the road of civilization construction and achieved gratifying results. Looking forward to the future, under the guidance of the goal of "national civilized unit", civilization construction will inject more vitality into the reform and development of Huanglongtan Power Plant and continue to write a new chapter in the scientific development of enterprises!