Preparation before paving
No.325 cement is recommended, and the reference ratio of dry paving method is: base-cement: fine sand = 1: 3, and bonding layer-cement: fine sand: 1: 2 (white cement is recommended for white series polished tiles to achieve the effect of color harmony). Anti-fouling wax is pre-coated on polished tiles before paving, which can improve the anti-fouling ability of tiles.
Paving skills
When the shop is stuck, the wall or ground to be stuck should be leveled first, and the dry paving method can only be used when the base reaches a certain hardness. When the shop is stuck, the joint can be adjusted between 2 and 3 mm..
Trial paving inspection
Trial paving: randomly select products with different job numbers and different dates in the same specification and color number, put a few pieces on the ground for trial paving, and stand 3 meters away to observe carefully. If obvious color difference, dimensional deviation, uneven gap between bricks and uneven chamfering are found, and the brick position is still not satisfied after adjustment, please contact our company or local dealer, and we will provide you with satisfactory service.
Pattern mosaic paving
If the mosaic feature of the pattern is obvious, please find the unified direction of its mosaic feature. If the characteristics of pattern splicing are not obvious or there is no pattern, please combine the requirements of construction effect. It is suggested that the tiles should be laid in the same direction as the trademark or arrow at the bottom of the brick, and the effect is better.
Maintenance after paving
After the completion of paving, the cement stains left on the brick surface should be wiped off in time. The paved ground needs to be maintained for 4-5 days to prevent local unevenness caused by external force.