What is the appropriate ratio of plugging king and cement?
1, mixing ratio

Stir according to the ratio of 1kg powder and 0.28l water. First, a proper amount of water is poured into the container, and then the plug king is added and quickly stirred until a uniform and sticky putty-like powder is formed.

2. Quick repair

When repairing, chisel away the periphery of the crack with concrete, rinse all loose particles, dust and sundries on the base surface, thoroughly wet the place to be repaired, and then plug the stirred plug into the crack to ensure that it can be completely filled, so as to ensure the formation of a good system bond.

3. Repair the leaking cracks

First of all, the leakage point of Mingshui should be blocked quickly, and then the weak parts around the leakage point should be treated with anti-seepage reinforcement, and the repair parts should be painted to achieve the best waterproof effect.

Before the construction of waterproof coating, it is necessary to do a good job of cleaning up the grassroots, and clean up the eluvial soil and gravel on the grassroots to avoid bulging and falling off after construction. In addition, the waterproof effect can be increased by waiting for the grass-roots to dry before construction.

It is also the most important step to carry out waterproof test after waterproofing. If there is a problem, you can repair it in time, otherwise it will be very troublesome to find water leakage after pasting the tiles. If there is no problem with waterproofing, you can make a protective film, and then decorate it normally when it is dry.