2. Price including tax of car board: refers to the price delivered on the train carriage, including value-added tax.
3. Car board price excluding tax: refers to the price delivered on the train carriage, excluding value-added tax, which means that the tax of 13% is not added to the coal price.
4. Site price: refers to the delivery price at a certain stacking site, generally excluding tax.
5. FOB price: refers to the delivery price of coal loaded on the ship without leveling (excluding this fee).
6. Closing price: refers to the delivery price after the coal is leveled on board, including this fee.
7. Price including tax and price excluding tax: refers to whether the price includes VAT (13%). For example, the price excluding tax is 100, and the price including tax is 1 13.
8. Total price including tax and total price excluding tax refer to the price of transporting coal to the place designated by the user, usually by train, ship or car. Including tax and excluding tax means that users need invoices. If they need invoices, they are based on coal price and freight, plus tax.
9. Base price of tax-included car board: (same as 2. Including tax car board price), excluding train freight price.
10. Arrival price: the same as the total price including tax and the total price excluding tax.
There seems to be no special textbook.