1, the feasibility study report should be complete, clear conclusions, accurate data and sufficient arguments to meet the needs of decision makers in making plans and projects;
2. The planning and policy background of the project need comprehensive argumentation and reliable conclusions;
3. The analysis of market capacity and competitiveness needs full investigation, appropriate analysis methods and credible prediction;
4. The main equipment specifications and parameters selected in the report should meet the ordering requirements, and the imported technical equipment data should meet the contract negotiation requirements;
5. The main engineering technical data determined in the report shall meet the requirements of the preliminary design of the project;
End of analysis report:
The writing of the ending is flexible and diverse, and there are generally the following.
1, natural ending. If the main part has clearly expounded the point of view and made a clear conclusion, there is no need to add a tail.
2. Conclusion. In order to deepen the reader's impression, deepen the theme, summarize the previous article, re-emphasize the views on things after investigation and analysis, and make a conclusive conclusion.
3. An enlightening ending. After writing the main facts and analysis conclusions, if there are still some problems or situations that need to be pointed out to arouse readers' thinking and discussion, or to indicate the development trend of things and the direction of efforts, you can write an enlightening ending.
4. Forecast conclusion. Some reports put forward the investigation and analysis of the situation and problems, and then write the author's prediction, explain the development trend, and point out the possible consequences and influences. This is to deepen the theme from a broader perspective.