1, short axis express line
Short axis express line = conversion line = (maximum in 9 days+minimum in 9 days) /2, with 9 days as a short period (the period length can be changed at will).
2. Slow axis
Central axis slow line = baseline = (maximum in 26 days+minimum in 26 days) /2, with 26 days as the midline cycle (the cycle length can be adjusted at will).
3. Reverse indexing
Reverse indicator = late band = move today's closing price back to the midline period.
4, positive index a.
Positive exponent A = leading band A = (short axis fast line+middle axis slow line) /2, positive to a midline period.
5. Forward index b
Forward index B = leading band B = (52 highest in 52 days and lowest in 52+52 days) /2, moving forward to the midline period.
6. Cloud band (resistance band)
Cloud band = space of forward index a and forward index b.
In 1960s, Japan worked six days a week. The traditional system was one and a half weeks (short), one month (middle) and two months (long). Now the working days have changed from 6 days to 5 days, so according to the essence of monocular balance table, it should be changed to 7 days.