Due to road construction, some areas in Foshan will be closed to traffic, so there is traffic control. The editor will introduce the specific control content below. It is not just one line that will have traffic control. Let’s take a look. Which sections of road? Entrance and exit of Pingsheng Bridge

According to the construction plan for the high-speed reconstruction of Foshan First Ring Road, construction will be carried out at the current stage at the Xilong Interchange North Exit Toll Station on the east line of Foshan First Ring Road (north to south direction), and Pingsheng needs to be closed The specific closure times and detour guidelines for the entrances and exits of relevant road sections near the bridge are as follows:

Closed time:

From now until 12:00 on November 15th.

Closed location:

1. Close the entrance and exit connecting the First Ring Auxiliary Road (north to south direction) and Xilong Village Road. 2. A temporary entrance will be opened north of the closed intersection for vehicles from Xilong Village Road to enter the first ring auxiliary road, as shown in the figure below:

Suggested detour route:

1. Xilong From the village to the First Ring Road: Xilong Village Road → Temporary entrance → First Ring Auxiliary Road → First Ring Main Line.

2. First Ring Auxiliary Road to Xilong Village:

(1) Small vehicles: First Ring Auxiliary Road → First Ring Xilong Village Passage → Xilong Village Road → Xilong village.

(2) Large vehicles: First ring auxiliary road → Xilong Interchange → Kuiqi Road east extension (direction to Guangzhou South Railway Station) → Baichen Road exit → go straight on the auxiliary road → make a U-turn at the traffic light at Baichen Road →

Eastern extension of Kuiqi Road (direction to Chancheng) → First Ring Auxiliary Road → Xilong Village temporary exit → Suiyan intersection of Dali Yanbu Avenue in Xilong Village

According to The municipal department of Dali Town reported that the road surface at the Suiyan intersection (Sanhe intersection) of Yanbu Avenue was inspected and it was found that the road surface opposite the old man's head shoe store was damaged and sinking. For the sake of road safety, the road surface needs to be rescued and repaired, and relevant traffic control measures will be implemented:

Closing time:

From now until October 22, 2019

Closed location:

Suiyan intersection of Yanbu Avenue (Sanhe intersection)

1. The east lane of the traffic light from west to east will be closed to a straight lane. For vehicles, the original two lanes will be changed to a single lane;

2. The south-to-north lane of the traffic light's south lane will be closed to a straight lane and a right turn lane, and will be changed from the original four lanes. Changed to two lanes for traffic.

Suggested detour route:

Passing vehicles are asked to slow down or take a detour to Guangfo Road, Guangfo Xingan, Lianhe Road, Guihe Road, Suiyan West Road, Suiyan It is accessible on other sections such as East Road, Yuejin Road, Huanzhen Road, Yanbuzhi Street, Hexi Avenue, and Yanxiu Road.

Asphalt construction on Suiyan Road in Dali

Due to the need for asphalt construction on the east side of Suiyan Road (Hedong intersection - the bottom of Xihuan Bridge), from now until the morning of October 21 , there will be traffic control on the east section of Suiyan Road. Drivers passing by are asked to take a detour! East to west direction (toward Dali)

Closing time:

October 15th at 22:00 to 6:00 on October 16, 22:00 on October 16 to 6:00 on October 17, and 22:00 on October 17 to 6:00 on October 18

Closed location:

< p>1. To the east of Suiyan Road (from the Hedong intersection to the lower section of the Xihuan Bridge), there are three lanes from east to west, which are fully closed with barriers. During the construction process, the traffic volume at the Hedong intersection will be large. If there is a traffic jam, the traffic light control at the intersection will be affected during the construction.

2. To the east of Suiyan Road (from the Hedong intersection to the lower section of the Xihuan Bridge), the three lanes from west to east are separated by reflective cones in the middle, and are temporarily divided into two-way lanes and one-way 1.5 lanes.

Suggested detour route:

Vehicles traveling east to west from Suiyan Road towards Dali will arrive at the second exit of the circular traffic island under the Xihuan Bridge. Use the opposite lane to drive. Or turn right at the first exit to go to Guangfo Bridge and the Guangfo Shinkansen. West to east direction (toward Guangzhou)

Closed time:

From 22:00 on October 18 to 6:00 on October 19, and from 22:00 on October 19 to October 20 6:00, 22:00 on October 20 to 6:00 on October 21

Closed location:

1. East of Suiyan Road (from the Hedong intersection to the lower section of Xihuan Bridge) , three lanes from west to east are fully closed with barriers. During the construction process, the traffic volume at the Hedong intersection will be large. If there is a traffic jam, the traffic light control at the intersection will be affected during the construction.

2. To the east of Suiyan Road (from the Hedong intersection to the lower section of the Xihuan Bridge), the three east-to-west lanes are separated by reflective cones and temporarily divided into two-way lanes and one-way 1.5 lanes.

Suggested detour route:

For west-to-east vehicles traveling from Suiyan Road to Guangzhou, when arriving at the U-turn lane of Sanyanqiao Grain Wholesale Market, take the opposite road. Lane driving. Or turn left at the intersection of Yanbu Avenue and Suiyan Road in advance, go around Yanbu Avenue and use the Guangfo Shinkansen.

From Jinhua East Road in Lishui to County Road 280

Due to the construction needs of the road project from Xiashi in Lishui Town to Nanhai Lishui, it is necessary to implement fully closed construction from the intersection of Jinhua East Road to County Road 280. In order to ensure the construction period For road traffic safety, car owners are requested not to park their cars on the construction section during the construction period, and motor vehicles are prohibited from entering. The announcement is as follows:

Closing time:

From now until January 2020 On March 20th

Closed location and detour route:

Full closure will be implemented from the intersection of Jinhua East Road in Lishui Town to County Road 280. The black line in the picture below is the closed construction area, and the red line for a detour route.

Guihe Road Road Marking Renovation Project