Legal basis: Article 40 of the Regulations on Quality Management of Construction Projects Under normal use conditions, the minimum warranty period of construction projects is:
1. The infrastructure engineering, foundation engineering and main structure engineering of the building are the reasonable service life of the project specified in the design documents;
2, roofing waterproof project, bathroom, room and exterior wall waterproof requirements, for 5 years;
3. The heating and cooling system consists of two heating periods and cooling periods;
4, electrical pipelines, water supply and drainage pipelines, equipment installation and decoration engineering, for 2 years;
5. The warranty period of other projects shall be agreed by the Employer and the Contractor;
6. The warranty period of the construction project shall be calculated from the date when the project is completed and accepted.