Current location - Trademark Inquiry Complete Network - Tian Tian Fund - What are the scope of use of the property maintenance fund?
What are the scope of use of the property maintenance fund?
Hello, the scope of use of the property maintenance fund.

The first part is the scope of the maintenance fund for the facilities used in the * * * parts of the house.

Housing itself:

Demolition and reinforcement of main load-bearing structural parts of damaged houses (including foundation, internal and external load-bearing walls, columns, beams, floors, roofs, etc.). ) to restore the bearing capacity.

Integral repair outdoor wall, ceiling, skirting line, cornice, awning plaster layer or block surface. Comprehensively repair the ground of public buildings.

Structural adhesive was poured into the glass curtain wall as a whole, and the deformed aluminum alloy frame was replaced, so the glass was damaged. (Aluminum-plastic panel wall shall be implemented by reference)

Overall maintenance and replacement of doors and windows of outdoor corridors, stairwells, hallways and basements.

(2) Supporting public buildings:

1. Road (road width is less than 7m): the road surface is damaged by more than 50%, and the road surface and kerbs are repaired as a whole.

2. Green space: If the original green space rate drops by 30% after one year of acceptance, replanting shall be carried out.

3. Public welfare facilities (leisure chairs and stools, trash cans, pavilions, tables, pools, sculptures, playgrounds, fitness facilities, etc.). ): After three years of use, the facilities are naturally damaged and need to be repaired and replaced.

, residential walls and doors: due to natural damage affecting safety and use need to be repaired and updated as a whole.

The second part * * * the scope of use of equipment maintenance fund

(1) vertical elevator

1, computer room part:

1) traction unit: replace the stator, rotor and bearing of the motor; Reducer bearing, worm, driven shaft.

2) Speed-limiting safety system: replace the speed limiter, safety tongs and tensioner.

3) Control panel: replace the main control panel, excitation panel and power panel.

4) Layer Selector: Replace it as a whole.

5) Terminal protection device: replace the upper and lower limit rods, wire rope and wire rope tensioner.

2. Shaft part:

1) car and car frame: replace the car, control box (internal call), overload device and safety clamp.

2) Automatic door mechanism: replace the car door safety contact plate and the door opening and closing motor.

3) Guide rail: Replace deformed and damaged parts.

4) Guide shoes: replace them as a whole.

5) Traction wire rope: completely replaced.

6) Counterweight: replace the guide shoes.

7) Buffer: Replace the buffer spring or piston.

3, hall station part:

1) Call button box (outgoing call): all floors are replaced.

2) Floor indicator: All lamps and wires on each floor should be replaced.

Hope to adopt!