Summary of work of main professional and technical personnel

Work summary of main professional and technical personnel (selected 5 articles) The busy and fulfilling work has come to an end. I believe that you have gained a lot during this period. You need to seriously write a work summary for this.

So how to write it?

The following is a summary of the work of major professional and technical personnel that I have collected and compiled (selected 5 articles). You are welcome to learn from and refer to it. I hope it will be helpful to everyone.

Summary of the work of the main professional and technical personnel 1. Entered the electric power industry company in August 20xx and has been working ever since.

I worked on the front line of production in the line class, substation class, and biotechnology unit of the electric power industry company.

With the support and help of my leaders and colleagues, I have achieved certain results in all aspects of my thinking, work, study, etc., and my overall personal quality has also been improved to a certain extent. Here is a summary of my achievements in the past five years from a professional and technical perspective.

A comprehensive summary of the work: The electric power enterprise is a special industry. It requires employees to have good own abilities and psychological qualities. Therefore, I continue to learn various skills, work hard to learn and master the operation methods and characteristics of the power system, and understand the conditions of the entire region.

Understand the operation conditions of the distribution network, and at the same time, be able to master relevant electrical basics, electrical materials, and high-voltage engineering technology expertise according to the needs of various types of electrical equipment, and be able to select the best operation mode and economic operation method based on the operation conditions of on-site electrical equipment.

Operation experience, correctly handle equipment failures of electrical systems and system emergencies, have a preliminary understanding of the basic knowledge of team management and production technology management, and further strengthen their professional skills.

1. Learn professional knowledge about production operations and improve job skills. I started working in 20xx. In order for me to change my role as soon as possible, familiarize myself with the working environment and adapt to production requirements, I was assigned to the line class and substation class of the electric power industry company.

Line erection, cable laying, high voltage testing, relay protection and substation maintenance, etc.

At the beginning of my work, I found that there was a big difference and gap between the professional knowledge learned in school and the actual production.

To this end, I worked hard to learn professional knowledge about production and operation, and worked hard to improve my job skills. In just one year, I took the initiative to absorb the work experience of the old masters, humbly asked them for technical problems at work, and through my own efforts

, quickly mastered the production procedures of line and substation operations and the specifications and parameters of various primary and secondary equipment.

2. Engaged in construction design and technical management At the end of 20xx, I was assigned to the Biotechnology Unit of the Electric Power Industrial Company, mainly responsible for the design and construction of power transmission and distribution lines.

At this time, it was the early stage of the transformation of rural power grids, and the workload was very heavy. Under the situation of tight time and heavy tasks, I studied while working, and soon got on track.

First of all, follow the masters to go to the scene frequently, and compare your original knowledge to better integrate your theoretical knowledge and practice. On the one hand, you give up your rest time to use various materials for professional learning, and strengthen your own knowledge in a targeted manner.

Professional knowledge reserve; on the other hand, ask the masters for advice on problems that you don’t understand, think hard, do more, study hard, and remember.

In a short period of time, I learned the technical requirements and parameters of various lines, figured out the operating principles and nameplate parameters of each equipment, and used the distribution network scheduling diagram to analyze the operation of the lines, which added a lot of work confidence to myself and enriched myself.

practical experience.

I participated in the high and low voltage rural power grid reconstruction project in 17 villages in Pangjiabao Town. I was mainly responsible for the design of the lines, the drawing and modification of construction drawings, and the compilation of line data.

And enriched the company's line information.

I also participated in the reconstruction project of the Xiaowuying-Longguan 110kv secondary circuit line. The line is 24 kilometers long, most of it is in mountainous areas, and it was constructed in winter.

I am mainly responsible for re-testing the lines, familiarizing myself with the design drawings and comparing them with the construction site, and calculating various technical parameters of the lines.

After 7 months of hard work, the work was finally completed successfully. Finally, I compiled the project acceptance data and submitted them to the supervision and operation and maintenance departments.

Secondly, advanced scientific and technological means were applied to actual work, and autocad was used to draw line direction diagrams, phase sequence diagrams, and crossover diagrams.

It is necessary to update the line drawing data in a timely manner, and connect and update the old and new drawings so that the drawing data is consistent with the site and the equipment. This further improves the line data and ensures the authenticity of the data. It provides a real guide for production management and the gradual realization of the line.

State maintenance lays the foundation.

Improved work efficiency and management level.

I also participated in training on new safety regulations and work tickets.

This year I was designated as the issuer of work tickets for the line, which made my burden even heavier.

Because the issuer of the work ticket has a great safety responsibility, a little negligence on his part may cause serious consequences. He must not only ensure the necessity and safety of the work, but also check whether the safety measures filled in on the work ticket are complete.

It is necessary to ensure that the assigned work leaders and work team members are appropriate and sufficient.