Current location - Trademark Inquiry Complete Network - Tian Tian Fund - How much is the compensation per mu for the area from Nayong to Zhijin section of Xiamen-Chengdu Expressway?
How much is the compensation per mu for the area from Nayong to Zhijin section of Xiamen-Chengdu Expressway?
Compensation and Resettlement Scheme for Construction and Demolition of Zhijin-Nayong Section of Xiamen-Chengdu Expressway

I. Basis for compilation

According to Land Management Law of the People's Republic of China, Forest Law of People's Republic of China (PRC), Regulations on the Implementation of Land Management Law of the People's Republic of China, Regulations on the Implementation of Forest Law of People's Republic of China (PRC), Regulations on Land Management of Guizhou Province, Regulations on Forest Management of Guizhou Province and the State Council's Decision on Deepening Reform and Strict Land Management. Notice of Guizhou Provincial People's Government on Strengthening Land Requisition Management of Key Projects (Qian Fu Fa [2004] No.5), Implementation Opinions on Deepening Reform and Strict Land Management (Qian Fu Fa [2005] 17) and Measures for the Administration of Compensation Expenses for Expropriation and Expropriation of Woodland in Guizhou Province (Order No.1 124 of Guizhou Provincial People's Government).

Second, the scope of demolition

Buildings, structures and ground attachments within the construction land of Zhijin-Nayong section of Xiamen-Chengdu Expressway. The compensation for the relocation and resettlement of schools, enterprises and institutions shall be settled through consultation between the project owners and the land acquisition, relocation and construction coordination agencies of the people's governments of counties along the line.

Third, compensation and resettlement for house demolition.

Compensation and resettlement for house demolition shall be made in accordance with the guiding standards for compensation and resettlement for house demolition (annex 1), compensation and resettlement for ancillary facilities of houses (annex 2), compensation and resettlement for house decoration (annex 3) and relocation turnover and temporary transitional subsidies (annex 4).

For the demolition of houses in urban planning areas and independent industrial and mining areas, combined with the relevant provisions of the Regulations on Expropriation and Compensation of Houses on State-owned Land, the county government will prepare a demolition plan, which will be reported to the municipal government for approval and implementation after the approval of the operating expressway construction headquarters and the project owner.

Fourth, the ground structure compensation

The compensation standard for above-ground structures shall be compensated according to the Guiding Standard for Compensation of Structures (Annex 5).

Five, forest compensation

The compensation standards for forest land and trees shall be implemented in accordance with the Measures for the Administration of Compensation Expenses for Expropriation of Forest Land in Guizhou Province (OrderNo. 124 of Guizhou Provincial People's Government) and the relevant provisions of the Provincial Forestry Department.

Compensation for scattered trees in economic forests and non-forest land shall be organized and implemented in accordance with the Guiding Standards for Compensation for Economic Forests (Annex 6) and the Guiding Standards for Compensation for Scattered Trees (Annex 7).

6. Relocation of communication, radio and television, electric power, railways and other facilities.

Construction involves the relocation of communication, radio and television, electric power, railways and other facilities. The people's governments of cities and counties along the line coordinate relevant departments to give support to the construction of key highways. After reaching an agreement through consultation and signing an agreement, the project owner will move according to the original technical standards (such as communication capacity) according to the principle of moving first, and the relocation expenses will be borne by the expressway project owner (if the property right unit raises the original standard, the extra funds will be solved by the property right unit).

Seven, gun damage compensation

If buildings and structures are damaged due to construction blasting, the construction unit shall make compensation according to the standards stipulated in the Guiding Standards for Compensation for Blast (Earthquake) Damage (Annex 8) and the requirements of the Opinions of Bijie Expressway Construction Headquarters on Further Improving the Compensation for Blast (Earthquake) Damage. Causing human or animal casualties, it shall be handled in accordance with relevant laws and regulations. If the structure is damaged and cannot be repaired and restored by the relevant departments, compensation and resettlement shall be given according to the compensation standard for house demolition.

Before shooting, the county headquarters will take the lead in organizing the construction unit to participate in the pre-shooting investigation of buildings and structures within a range of about 500 meters on both sides of the red line, and the investigation fee will be paid by the construction unit; Whether it belongs to the identification of gun damage and damage degree, if there is any dispute, it shall be identified by the quality supervision department of the city or county or a qualified unit, or solved according to legal procedures.

Eight, the demolition work organization

Land acquisition and demolition work is carried out under the unified leadership of the municipal expressway construction headquarters, and the expressway land acquisition and demolition coordination organization established by the county people's government is responsible for the coordination of demolition compensation within its jurisdiction.

Nine, demolition management costs, working expenses and transportation subsidies

Demolition compensation fee is managed by the special account of the city and county expressway construction headquarters, and the funds are closed in the special bank, and the county-level special account directly subsidizes the relocated households.

Work funds are listed separately according to 5% of the total compensation cost for demolition, of which 4% is allocated to the municipal headquarters for overall arrangement, and 1% is used by the provincial department of transportation and the project owner to adjust and reward outstanding units and individuals in demolition work.

According to the standard of 300,000 yuan in the city and 200,000 yuan in the county, the project owner will allocate a one-time transportation subsidy to the city and county demolition coordination agency.

Ten, matters not covered in this scheme, by the project construction owners, demolition units and local land acquisition and demolition construction coordination agencies along the local actual situation, through consultation. After this plan is approved by Bijie Municipal People's Government, the county people's governments may formulate specific implementation measures according to this plan.

Eleven, the demolition agreement signed by the Provincial Communications Department and Bijie Municipal People's government.

Attachment: 1 Guide to compensation for house demolition and resettlement

2 guidelines for compensation of ancillary facilities of houses

3. Housing renovation compensation guide

4. Guidelines for relocation, turnover and temporary transitional subsidies

5. Guiding standards for structural compensation

6. Guiding standards for economic forest compensation

7. Guidelines for compensation of scattered trees

8. Guidelines for compensation for gun damage

Attachment 1:

Guiding standards for compensation and resettlement of house demolition

Note: monetary compensation for land resettlement 1 frame structure 700-800800-900 2 brick-concrete structure, stone structure cast-in-place slab roof 600-700700-800 3 brick-wood structure, stone structure blue tile roof 450-520600-700 4 wood tile structure 360-400.

Note: 1. This standard does not include indoor and outdoor decoration, decoration and ancillary facilities. Complete houses that do not belong to the above structure shall be valued according to the lower limit corresponding to the above similar standards in the housing structure.

2. Identification of business premises (1): the business premises must be the first natural premises facing the street, and have legal documents and procedures such as business license and tax registration certificate. (2) For the business premises, the compensation for demolition shall be implemented according to the compensation standard of the above-mentioned corresponding housing category, and the compensation for business suspension and closure shall be calculated according to the business premises area 12 yuan/m2/month and 6 months * * *.

3, production, office, warehouse and other non-residential housing with reference to housing compensation standards, one-time monetary compensation, no longer resettlement or relocation.

Attachment 2:

Guiding standards for compensation of ancillary facilities of houses

Remarks on compensation standards for different types of units: landline telephone (excluding extension) yuan/unit 200 broadband transfer fee yuan/household 150 cable TV yuan/household 300 air conditioner yuan/unit 400 transfer machine, installation of lighting facilities yuan/household 600 tap water facilities yuan/household 800 stove yuan/household 400- 1000 No decoration in 400 yuan. Household 300 range hoods/sets 100 solar energy/sets 1000 electric water heaters/sets 600 with sets.

Attachment 3:

Guiding standard of housing decoration compensation

For each type of compensation standard, it should be noted that the exterior wall tiles of the houses are decorated inside and outside, and the exterior wall coating is 20-30 yuan /m2 porcelain powder 3.5 yuan /m2 porcelain powder+latex paint 10 yuan /m2 wallpaper 10 yuan /m2 wooden dado (about 1m high) and 60 yuan /m2 ceramic dado (about 1m). M2 interior wall decorative ceiling (wood frame structure) 80 yuan /m2 gypsum board line 5 yuan /m gypsum board ceiling 35 yuan /m2 aluminum-plastic board ceiling 50 yuan /m2 plastic gusset 30 yuan /m2 floor 60cm×60cm floor tile 40-60 yuan /m2 floor tile 60 cm× 60 cm 30-40 yuan /m2 80cm floor tile 60-80 yuan/M2 wear-resistant floor tile, water mill M2 wear-resistant polished floor tile 60-70 yuan. M2 marble and granite 90 solid wood flooring 60- 120 yuan /m2 parquet flooring 120- 140 yuan /m2 reinforced and composite wood flooring 50-70 yuan /m2 metal doors and windows aluminum alloy rolling door 6540. M2 aluminum alloy doors and windows 120 yuan /m2 stainless steel security door 240 yuan /m2 security door 400-500 yuan/road steel bar security window 30 yuan /m2 door cover 120 yuan/road plywood, basswood door cover 120 yuan/road solid wood door 80- 165438. M2 finished door 100- 160 yuan /300-500 yuan/15 yuan/meter indoor guardrail wooden 30 yuan/meter steel bar 25 yuan/meter stainless steel 50 yuan/meter iron flower 100 yuan/meter carved glass thickness below 8mm (. M2 thickness more than 8mm 160 yuan /m2 fixed cabinet wall cabinet 150 yuan/m hanging cabinet (height 700mm)70 yuan/m decorative cabinet 100 yuan/m sanitary ware desktop washbasin 260 yuan/bathtub 400 yuan/squat toilet 50 yuan/sitting toilet 200 yuan/stainless steel washbasin 100.

Note: 1, renovation within 5 years (including 5 years) is calculated according to the standard 100%.

2, decoration for more than 5 years according to the standard of 70%.

Attachment 4:

Guidelines for relocation, turnover and temporary transitional subsidies

Remarks on category compensation standard: compensation for house demolition 10 yuan/m2/time. If the accumulated amount of each household is less than that of 500 yuan, the actual compensation will exceed that of 500 yuan according to the calculation of 500 yuan. 20 yuan/m2 for business premises, 65,438 yuan +05 yuan/m2 for production premises, warehouses and office premises, 5 yuan/m2 for temporary turnover transition fee and 5 yuan/m2 for residential premises. The transitional period of centralized resettlement turnover is 6 months from the date of house demolition to the date of completion of "three links and one leveling" land supply; Decentralized resettlement is 10 month from the date of house demolition after the homestead is determined. Business building 15 yuan /m2/ month production building, warehouse building, office building 12 yuan /m2/ month animal circle 3 yuan /m2/ month signed the relocation incentive agreement, completed the relocation within 20 days, signed an agreement of 4,000 yuan/household, completed the relocation within 30 days, with 3,000 yuan/household zoned for resettlement and 2,000 yuan.

Note: 1, monetary compensation is a temporary turnover transition fee of 3 months.

2, monetary compensation to give a relocation allowance, land resettlement to give two relocation allowance.

Annex 5:

Guiding standard of structural compensation

Category Name Unit Compensation Standard Note 1. Solid brick wall element /m3 160- 180 hollow brick stone wall element /m3 140- 160 mortar masonry wall element /m3 140- 160 flaky dry masonry and soil. Brick masonry with mortar /m3 100- 160 dry masonry brick masonry /m380- 100 III. Sunba concrete Sunba element /m235-45 bluestone Sunba element /m240-60 simple cement floor element /m220-30 dirt road Sunba element /M26-30 M240-60 This item is concrete road element /m240-50 asphalt road element /m240-50 brick paving and stone road element//m26- 10/5.

Five, agricultural irrigation ditch cement, lime slurry brick, stone agricultural irrigation ditch yuan /m3 160- 180 according to masonry calculation flaky dry brick yuan /m390- 100 according to masonry calculation soil ditch yuan /m3 15 according to excavation. Biogas pit (calculated by volume) Yuan /m3400-420 is calculated by volume VIII. Graves with monuments and stones/1800 monuments and gravel graves/1400 other graves /60 tombs. M2240-380 Brick and Wood Structure /m2 180-200 Wood Structure /m2 160- 180 Civil Structure /m2 120- 140 Simple Structure/M280-/KLOC.

Attachment 6:

Guiding standard of economic forest compensation

Compensation category Compensation standard measurement unit (yuan) is compiled and the expected date of delivery of chestnut is 65438 yuan/mu +0500-2000. After the second year of planting, it reaches the initial fruit period, and the decline period reaches 3000-3500 yuan/mu. The early yield of walnut will reach 7000-8000 yuan/mu. After the second year of planting, the first fruit period is reached. Mu 12000- 13000 due dates of apples, pears, peaches, bonuses, apricots, gourds, pomegranates, plums, persimmons and cherries. Yuan/mu 1500-2000 yuan/mu from the second year after planting to the first fruiting period and decline period. 65438 yuan/mu +0500-2000 yuan in the early stage of grapefruit; After the second year of planting, it reaches the initial fruit stage, and the decline period is 3500-4000 yuan/mu; Before navel orange is 8,000-9,000 yuan/mu, it reaches the initial fruit stage, and the decline period is 6,500-5,000 yuan/mu. The early stage of loquat is 3500-4000 yuan/mu. After the second year, it will be planted to the first fruiting period, with a decline period of 5,000-6,000 yuan/mu and a harvest period of 1.2 million-1.3 million yuan/mu (including shelf expenses). Pre-production period of tung oil tree and camellia oleifera 12000- 13000 yuan/mu pre-production period100-1decline period of the first fruit after the second year of planting in 600 yuan/harvest period of 2300-2800 yuan/mu 5000 yuan. Decline period of primary production: 3000-3500 yuan/mu; 7000-8000 yuan/mu; Premature period: 1500-2000 yuan/mu; Pre-production: 3500-4000 yuan/mu: 8000 mu. 2500-3000 yuan per mu, 6000-6500 yuan per mu, 1000- 1500 yuan, 2000-2500 yuan per mu, 5000-5500 yuan per mu and 4000-4500 yuan per mu. The per-mu yield of Rosa roxburghii and Ficus carica 14000- 15000-2000 yuan/mu, decreased by 2500-3000 yuan/mu, and the high yield of Eucommia ulmoides and Cortex Phellodendri 10 yuan/mu was 6500-7000 yuan/mu. 8500-9000 mu of mulberry field, preliminary production yuan/mu 1500-2000 yuan/mu, rich production yuan/mu, 4500-5000 yuan/mu.

Note: 1. The compensation standard at seedling stage is calculated according to 50% of the compensation standard at initial delivery.

2. Seedling stage: one production year after planting bare-rooted seedlings.

Attachment 7:

Guide to compensation for scattered trees

Compensation standard of compensation category: DBH of pine, fir and cypress is less than 5cm/ plant 5- 10cm/ plant15dbh11-5 cm/plant 30dbh16-20. Plant 90: Zanthoxylum bungeanum, Tung oil tree, Camellia oleifera, Rosa roxburghii, Ficus carica, lacquer tree/plant 5: annual output per plant after planting 20: initial production period, declining period/plant 50: rich production period/plant 150: plum, jujube, persimmon, apple, bonus, apricot, pomegranate. High-yield period 100 yuan/200 yuan at the seedling stage of citrus, citrus and pomelo/container seedling stage 10 yuan/40 plants at the initial stage and low-yield stage/high-yield stage 100 yuan/250 yuan at the seedling stage of Myrica rubra and loquat/8 yuan at the initial stage after planting/. Eight bare-rooted seedlings of kiwifruit (including shelf fee) after seedling planting, one production year, the prophase RMB/plant is 30, prophase RMB/plant 100, and the abundance RMB/plant is 200, and the DBH of Eucommia ulmoides Oliv., Cortex Phellodendri, Cortex Magnolia Officinalis, Rubber Tree and Ailanthus altissima is less than 6cm/ plant 15. Plant 80, DBH above 20 cm/plant 100, tea seedling/plant 2, growing period/cage 35, mature period/cage 50, bamboo DBH below 5 cm/plant 4, DBH below 5-7 cm/plant 5, DBH above 8 cm/plant 15, and other miscellaneous trees below 3 cm. The DBH of 10 strain is 13- 18cm/ plant 35 is 19-25cm/ plant 50 is 26-30cm/ plant 65 is 3 1-35cm/ plant 80 is more than 36cm/ plant 650cm.

Note: 1. Afforestation cost: including afforestation cost per unit area in the previous year and all tending management investment, 550 yuan/mu.

2, returning farmland to forest land compensation fee according to the relevant provisions of the state and Guizhou province.

3. Output value of timber: (1) masson pine 550 yuan/m3; (2) Chinese fir 680 yuan/m3; (3) Miscellaneous wood (cypress, broadleaf) 600 yuan /m3.

4, bamboo shoots by 10 yuan/kg.

Annex 8:

Guiding standard of compensation for gun damage

A, brick house:

(1) Two-cloth and three-oil treatment for roof cracks: 50 yuan/㎡;

(2) Brushing the damaged top surface of the house: 20 yuan/m2;

(3) Maintenance of slight cracks on indoor and outdoor walls: 20 yuan/㎡;

(4) 300 yuan/㎡ for damage and crack of load-bearing wall.

Second, the brick and wood tile house:

(1) asbestos tile: large wave type: 1.8×0.6 50 yuan per piece;

Wavelet type: 1.8×0.6 per 45 yuan;

(2) Small blue tiles are damaged and leak-repaired: 60 yuan/㎡;

(3) Ordinary cement tile: 80 yuan/㎡;

(4) replacement of damaged purlins:1each in 20 yuan;

(5) Replacement of damaged rafters: 30 yuan/piece;

(6) Replacement of damaged wooden floor: 80 yuan/㎡.

Iii. Brick-and-wood huts

(1) Purlin replacement: each 120 yuan;

(2) Replace the rafters: each 30 yuan;

(3) Changing grass to fill pit: 30 yuan/㎡.

Four, tile-roofed houses with earth walls and straw houses with earth walls:

(1) Repair of cracks (including both sides) on earth wall: 50 yuan/㎡;

(2) Repair the wall (including both sides) with lime slurry: 60 yuan/㎡;

(3) Tiles, purlins and rafters shall be executed with reference to the second and third paragraphs.

Five, stone wall tile, straw:

Repair wall cracks: 70 yuan /m (including indoor painting, refer to Articles 2 and 3 for others).

Six, ordinary lighting circuit:

(a) into the line 4 mm? Double line (aluminum core): 7 yuan/meter; ;

(2) 6 mm incoming line? Double line (aluminum core): 10 yuan/meter; ;

(3) incoming line 10 mm? Double line (aluminum core): 12 yuan/meter; ;

(4) incoming line 15 mm? Double line (aluminum core): 16 yuan/meter; ;

(5) 25 mm incoming wire? Double line (aluminum core): 20 yuan/meter; ;

(6) replace the wooden pole 150 yuan/root;

(seven) the replacement of cement pole 400 yuan/root;

The compensation of all kinds of wires and rods mentioned above includes accessories.

Seven, water supply facilities

(1) 6-point galvanized pipe: 25 yuan/m (including fittings);

(2) 4-point galvanized pipe: 20 yuan/meter (including fittings).

Eight, livestock stables toilet compensation with reference to similar residential grade, compensation fee down 30%.

Nine, all kinds of structures compensation:

(a) indoor and outdoor cement ground cracks: 30 yuan/㎡;

(2) Standard residential doors: 300 yuan for every household with wind windows and 250 yuan for every household without wind windows;

(3) Standard window: 120 yuan/㎡ (including glass and paint);

(4) Door and window glass: 40 yuan/㎡;

(5) Aluminum alloy 120 yuan/㎡.

Ten, gun damage compensation should be handled before the end of subgrade engineering construction.