In p>215, the tough battle for urban construction in Changzhi City has started in an all-round way. The grand blueprint of "effective at the beginning of one year, great effect in two years and great change in three years" has gradually come true, and a "Wuyi" city with perfect functions and comfortable and convenient life is about to appear. This year, 45 municipal infrastructure construction projects, 26 municipal public facilities construction projects and 3 social public welfare facilities construction projects will be built or completed-who doesn't want to get a sneak peek?

municipal infrastructure projects

there are 45 municipal infrastructure projects in 6 categories, with a total investment of 2.396 billion yuan.

1. 12 municipal road projects

1. Road construction project of Changxing South Road: starting from Jiefang East Street and ending at Chengnan Street, with a total length of 78m and a planned control red line of 4m, with six lanes in both directions. At present, the bidding work has been completed.

2. Road construction project in the south section of Weiyuanmen Road (Chengxi Road): starting from Wuyi Road and ending at Wuzhen Street, with a total length of 2,369 meters and a planned control red line of 5 meters, with six lanes in both directions. At present, the bidding work has been completed for 15 meters from Wuyi Road to Jiefang West Street.

3. Road construction project of the west section of Dehua Gate Road (Chengnan Road): starting from Hero South Road and ending at the West First Ring Road, with a total length of 1,8 meters and a planned control red line of 5 meters, with six lanes in both directions. At present, the bidding work has been completed for 637 meters from Yingxiong South Road to Tianweiji Section.

4. Yan' an North Road Construction Project: It starts from Weiba Road and ends at North Second Ring Road, with a total length of 1,35 meters, a planned control red line of 4 meters and two-way six lanes. At present, the bidding work has been completed for 425 meters from North First Ring Road to North Second Ring Road.

5. southwest outer ring road construction project: it starts from the west outer ring road and ends at the south outer ring road, with a total length of 4,7 meters and a planned control red line of 6 meters, with six lanes in both directions.

6. North Second Ring Road Construction Project: It starts from Yan 'an North Road and ends at Changxing North Road, with a total length of 519 meters, a planned red line of 3 meters and four lanes in both directions. At present, the bidding work has been completed.

7. Tiexianglu Lane Road Reconstruction Project: It starts from Changxing Middle Road and ends at Hero Middle Road, with a total length of 361m and a planned red line of 24m, with four lanes in both directions. At present, the bidding work has been completed, and construction will be started according to the progress of land requisition and relocation.

8. the road reconstruction project of fuhou west street: it starts from hero middle road and ends in front of the terminal, with a total length of 3,312m and a planned red line of 5m, with two lanes and six lanes. it is a world bank loan project, and the construction drawings are currently being designed.

9. Hero South Road Reconstruction Project: The starting point is Jiefang West Street, and the end point is South First Ring Road, with a total length of 2,66 meters. The planning control red line from Jiefang West Street to Chengnan Road is 4 meters, and the planning control red line from Chengnan Road to South First Ring Road is 5 meters, with two lanes. At present, the bidding work has been completed.

1. changjin expressway Changzhi south exit reconstruction project: the starting point is changjin expressway Changzhi south exit toll station, and the end point is Changzi expressway connecting line, with a total length of 245 meters and a width of 3 meters, with six lanes in both directions.

11. Guangrong Lane Road Reconstruction Project: the starting point is Jiefang West Street, and the end point is the military sub-district cadre's rest home, with a total length of 25m and a planned control red line of 16m.

12. Changbei trunk road reconstruction project: starting from Beizhai Cross and ending at North Outer Ring Road, with a total length of 2,32m and a planned red line of 6m, with six lanes in both directions. Currently, the preliminary procedures are being handled.

two or six municipal bridge projects

1. Wuyi bridge construction project: Wuyi bridge is located at the intersection of Wuyi road and southwest city road, and the bidding work has been completed.

2. Lu' an Bridge (No.1 Middle Bridge) construction project: located at the intersection of Chengdong Road and Xinying Street, the bidding work has been completed.

3. south extension bridge construction project of chengxi road: located at the intersection of chengnan road and chengxi road, across the Heishui River, with an estimated investment of 3 million yuan.

4. West extension bridge construction project of Chengnan Road: it is located on the south side of the intersection of Chengnan Road and Chengnan Street, crossing the Heishui River, with an estimated investment of 3 million yuan.

5. Changxing South Road Bridge Construction Project: Located at the intersection of the southern section of Changxing South Road and Chengnan Road, it crosses the south moat, with an estimated investment of 15 million yuan.

6. Hero South Road Bridge Construction Project: Located on the north side of the intersection of Hero South Road and Chengnan Road, it crosses the south moat. The bridge will be rebuilt in combination with the road reconstruction of Hero South Road, with an investment of 13 million yuan.

Three or three pedestrian overpass projects

1. The overpass of Hero North Road Primary School: located at the section of Zhuoma Village, the main road of Hero North Road in the urban area, with an estimated investment of 4.2 million yuan.

2. Overpass on the south campus of Changzhi University: it spans the East Outer Ring Road, with an estimated investment of 4.1 million yuan.

3. City Hospital Overpass: It is planned to be built between the city hospital and Pengyu Hotel, with an estimated investment of 3.9 million yuan.

Four or three railway overpass projects

1. Zijin West Street Railway Overpass Project: located at the intersection of Zijin West Street and Taijiao Railway, the present situation is 7 meters wide. The proposed bridge has a width of 5 meters, a motor vehicle lane of 24 meters, a two-way six-lane non-motor vehicle lane and a pedestrian walkway of 12 meters on both sides, with an estimated investment of 65 million yuan.

2. Wuzhijie Railway Overpass Project: The estimated total investment is 68 million yuan, which is located at the intersection of Wuzhijie and Taijiao Railway, with a current width of 16 meters. It is one of the important nodes of the main roads in the east and west cities of our city. It is planned to use the existing old bridge to add two new bridges with 16 meters holes on both sides: one motor vehicle and one human board on each side. At the same time, the traffic optimization organization is carried out for the west exit of the bridge, the Changzi connecting line and the west outer ring road.

3. south outer ring (south ring street) railway overpass project: it is located on the east side of Changjin Expressway and near Wangtong Village, Changzhi County, with an estimated total investment of 75 million yuan.

5. Interchange overpass project between North First Ring Road and Chengdong North Road

Located in the marshalling station of Changgang Railway, it is an important traffic node of the two main roads of Chengdong Road and North First Ring Road. The construction of this overpass will effectively alleviate the traffic pressure on the surrounding roads and control the investment of 45 million yuan. At present, the planning scheme design has been completed.

VI. Reconstruction Project of Back Streets and Alleys

In p>215, the city will mainly renovate 2 back streets and alleys in the main city, namely Lingnan Lane, Qinjia Lane, Fuhua Lane, Huaihai Tsinghua Snack Street, Fenghuangzui, Huafeng North Road, Magnetism Lane, Wayaogou East Lane 1-2, Beiying Lane 3, East Rear Lane, Fenshuixi, Zhongying Street, Qiyi Lane, and so on. The total length is 18.9 kilometers and the area is 11, ㎡.

municipal public facilities construction project

1. Urban water supply facilities construction project

1. New water pipeline project from Weizi Town to Erwaterworks: it is planned to build a new main water pipeline of 24.35km from Weizi Town in Lucheng City to Erwaterworks in Changzhi City.

2. water supply pipe network construction project in the new district: it is planned to build a circular water supply pipe network in the news center, sports center, business center, Zexinyuan community and Shengxinyuan affordable housing community, with a total length of 1.12km.

second, the urban central heating project

the 2×3MW+6MW unit of Zhangshan Power Plant was reformed, and the combined heat and power supply was implemented in the urban area. After the project was put into operation, the central heating area could be increased by 14 million square meters.

iii. Sludge (kitchen waste) disposal plant project

A new sludge (kitchen waste) disposal plant will be built. The site of the plant is a reserved land for sludge treatment, which is located about 1km southwest of Changbei Sewage Treatment Plant, covering an area of about 4 hectares and has a sludge treatment capacity of 3 tons/day.

iv. renovation project of urban lighting facilities

eighteen central pole lighting lamps at the intersection of Chengbei Road, Hydraulic Factory, Heji Hospital, Yujingyuan and Shijiazhuang were renovated, and the automatic monitoring system was also upgraded.

V. There are

* * 4 urban sanitation facilities construction projects, with an estimated total investment of 532 million yuan. Including: a new sanitary landfill for domestic waste (which can absorb domestic waste in the main city for five years), 1 new public toilets and 6 new garbage transfer stations; Build a domestic waste incineration power plant.

VI. Urban Underground Pipeline Survey Planning and Construction Project

Complete the urban underground pipeline survey, the construction of integrated underground pipeline management information system and the urban underground integrated pipe network planning.

VII. Three Rivers and One Canal Comprehensive Treatment Project

Before the end of May p>215, the water storage from Shizihe No.1 Middle Bridge to Zifang Bridge will be completed. Before October 1, the East Flood Control Canal and Heishui River have water supply conditions; Shizi River and East Flood Control Canal were fully completed by the end of the year; The Heishui River and the South Moat will each complete 8% of the works before the end of the year.

public welfare facilities construction project

1. Changzhi Railway Station Reconstruction Project

The total investment is 3 million yuan, and the design of construction drawings has been completed.

II. Construction Project of Changzhi National Urban Wetland Park

It is planned to construct seven basic supporting facilities, including transportation, lighting, sanitation, popular science exhibition and sightseeing, in the water area of 12 square kilometers of Changzhi National Urban Wetland Park and along the available land.

III. Renovation and expansion project of Changzhi Airport

The total investment of the project is 369 million yuan, including building a 12, ㎡ terminal building, releasing 35m covered runway, building a 1,12 ㎡ apron, adding four covered bridges, expanding the airport square, and improving the lighting power supply system and water supply and drainage system. At present, all the preliminary work has been completed.

Perfecting six construction projects

1. xiang yuan Intercity Link Project:

The total length is 2.2 kilometers. At present, except for the swivel bridge, the No.1 ~ No.5 bridge and the box culvert under the railway involved in the bridge project have been basically completed, and the roadbed of the road project has basically taken shape.

2. Chang 'an Expressway connecting line project:

The total length is 11.62km. Construction started in July 213, and it is now open to traffic. It is planned to be fully completed before June 215.

3. Sports Road Construction Project:

The total length is 3 meters. Construction started in November 214 and it is planned to be completed by the end of June 215.

4. Overpass of the administrative center:

Located between the business building and the sports center, it spans Taihang West Street.

5. Torch Middle School Overpass:

Across Taihang West Street.

6. Improve the cultural relics protection and restoration project of Chenghuang Temple, guanyin temple, Shangdang Gate and Liufu Pagoda:

The total investment of the project is 45 million yuan, with 3 million yuan completed and 15 million yuan completed in 215. It is planned to be completed by the end of August 215.

Urban Landscaping Construction Projects

1. Improve 12 landscaping projects in 214, namely, Fuhou East Street, Xianqian Lane, Xixie Street, Zhongshan Lane, Zhangze West Street, Weiershiwu Road, South First Ring Road, Taihang Street, Yingxiong North Road, Tiyu Road, Chang 'an Expressway Connecting Line Road Greening Project and Taihang Street (hydraulic factory to lakeside).

II. Urban beautification and greening project

Based on the principle of frugality and ornament, the urban beautification project is planned to invest 1.6 million yuan in 215, and the beautification period will be implemented according to Labor Day, summer and National Day, and perennial flowers will be planted in the ground or flowerpots will be set up. In principle, large flower stands, flower beds and flower borders will not be set up.

iii. renovation project of supporting facilities for park garden

renovation project of supporting facilities for park garden includes: maintenance and renovation of four public toilets on the east and west sides of Bayi Square, Zijin Square, electric pole factory, riverside garden fountain, and renovation of Mengjia Garden.

shantytown (village in city) renovation project in the main city

I. shantytown renovation project

In p>215, seven shantytown renovation projects were launched, involving 1,855 households and 6,866 people, covering an area of 97,946 ㎡ and a building area of 85,628 ㎡. They are: shanty towns of bearing factory, Changfang Electric Appliance Co., Ltd., 114 Geological Team, Yandong Yixiang, Jiuding Auto Parts Co., Ltd., Taihang Grain Machinery Factory and Sewing Machine Factory.

II. Reconstruction projects of villages in cities

In p>215, we will focus on promoting 19 reconstruction projects of villages in cities. They are: 1 urban village reconstruction projects in Mafangtou, Taoyuan, Li Jiazhuang, Southwest Pass, Baihou, Xinhua, Nanguan, Fucheng, Zhangzimen and East China; Six urban village reconstruction projects in Hukou, Guanduzhuang, Daxinzhuang, Zhanshang, Liangjiazhuang and Mijiazhuang villages in the suburbs; Renovation projects of three villages in the city: Dahua Village, Shijiazhuang Village and Xiaohuazhuang Village in High-tech Zone.

reconstruction project of national highway transit section

1. reconstruction project of Changzhi transit highway of national highway 28

The starting point is located in the west of Guguo Village, a suburb of Changzhi City, and the route passes through Yingbin Avenue of Changzhi City in Yuzhuang East, and transits south along the west of national highway 28, and the end point is located in Sima, Changzhi County. The total length of the route is 13.6 kilometers, and the whole line is designed according to the standard of two-way four-lane first-class highway. The design speed is 8 kilometers per hour, the width of integral subgrade is 24.5 meters, and the total investment is estimated to be 846 million yuan (the average cost per kilometer is 62.275 million yuan).

II. Reconstruction Project of Changzhi Transit Highway of National Highway 27

The route is located in Changzhi City, east of Lucheng City and east of Laoding Mountain, and the end point is located in Sijiachi Village of Huguan County. The total length of the route is 4.926 kilometers. The whole line is designed according to the standard of two-way four-lane first-class highway, with a design speed of 8 kilometers per hour, an integral subgrade width of 24.5 meters and a total investment of 2.44 billion yuan (on average)

Third, the connecting line highway project of National Highway 27-28

The starting point is located in Sima Village, Changzhi County, which is connected with the existing National Highway 27. The route runs from west to east and ends in Jiazhang Village, which is connected with the proposed highway in Changzhi transit section of National Highway 27, with a total length of 11.719 kilometers. The technical standard of the whole line is designed according to the standard of two-way four-lane first-class highway, with a design speed of 8km/h and an integral subgrade width of 24.5m. The total investment of this project is estimated to be 542 million yuan (the average cost per kilometer is 46.21 million yuan).