What is the process for building a new factory?

As follows:

1. Select the factory site: Select the factory site according to the relevant requirements of the products produced, and consider the possible pollution that production may cause to the surrounding environment.

2. Prepare the company’s articles of association and apply for a business license from the Industrial and Commercial Bureau.

3. Prepare factories and workshops according to the relevant requirements of the products produced, and they should meet the requirements in terms of water quality, environmental protection, environment, etc.

4. Go to the local Bureau of Standards and Metrology to apply for corporate product standards and apply for each product barcode.

5. Go to an advertising company to customize a trademark sample. Go to a trademark office to apply for trademark registration.

6. Install and debug equipment and trial produce samples.

7. Go to the tax department to apply for tax matters.

8. Packaging and raw material purchase, formulation of internal rules and regulations, and mass production.

9. Corporate IC planning and product advertising.

Construction process of new steel structure factory building:

1. There must be a piece of land and a plan should be made based on the actual area.

2. Design the factory drawings according to the plan and submit them to the Planning Bureau.

3. Apply for land, the land department will approve the construction and give the land red line.

4. Design factory construction drawings according to the plan.

5. Find the construction unit based on the construction drawings.

6. Select the construction unit and communicate with the design unit.

7. The construction unit shall lay out the lines according to the planning drawings and construct according to the construction drawings.

Find an agency that is qualified to make the "Environmental Impact Assessment Report Form (or Registration Form, Report) for Projects Under Construction", then submit it to the local Environmental Protection Bureau for approval, and then go to the Industrial and Commercial Bureau to register and apply for business license.

Procedures/steps for real estate application construction

1. Register a company with the Industrial and Commercial Bureau and pay attention to the amount of registered capital.

2. Apply to the Construction Committee and Construction Department for real estate qualifications.

3. Go to the Land and Resources Bureau’s Collection and Storage Center and find a clear land for recruiting, bidding, and listing.

4. After winning the bid, you must pay the transfer fee, which is land money, as required.

5. Then apply for the "Land Certificate".

6. Conduct design bidding, conduct architectural design, and review drawings.

7. Go to the Planning Bureau to apply for the "Planning Permit",

8. Conduct team bidding, and go to the Construction Committee to apply for the "Construction Permit",

9 , pay relevant insurance, fees, etc., and after the planning bureau inspects the line,

Development procedures

Preliminary work stage:

1. Engineering survey of the site ( Confirm that the survey unit has conducted a geological survey of the site)

2. Obtain land use rights

3. Land acquisition, demolition, and resettlement

4. Planning and design

p>

5. Implement development funds

6. Formulate a construction plan (the construction plan includes: construction organization and coordination plan, building materials and equipment supply plan, construction drawing design plan, infrastructure supporting plan Contact and negotiation plan, project list and project progress schedule, cash flow statement, negotiation and contract signing plan with the contractor, etc.)

7. Three connections and one leveling of the construction site

Construction stage

1. Project contracting

2. Construction organization and management

3. Project control and supervision

4. Project completion acceptance

p>

In addition, the development and construction application procedures are generally as follows:

1. Obtain the state-owned land use certificate

2. Approval of the planning plan

3. Apply for the election Site opinion letter

4. Project approval

5. Apply for construction land planning permit

6. Construction approval certificate (approval project development manual)

p>

7. Application for architectural design plan

8. Construction project planning permit

9. Submission of construction drawings for review