1. Request for Instructions on Scenic Area Projects
Wuyishan City Price Bureau’s Approval on the Charging Standards for Parking Services in Wuyishan Scenic Areas
Fujian Wuyishan Tourism Development Co., Ltd.:
Youxing's "Request for Instructions on Continued Implementation of Parking Lot Charging Standards in Scenic Areas" (Wu [2016] No. 98) has been received. According to the spirit of the "Implementation Opinions of the Fujian Provincial Price Bureau, Fujian Provincial Department of Housing and Urban-Rural Development, and the Fujian Provincial Department of Transportation on Motor Vehicle Parking Service Charging Policies" (Fujian [2016] No. 233) and the actual situation of parking fees in scenic spots over the past year, after research , hereby approves the issue of parking fees in scenic spots as follows:
1. Specific charging standards
Serial number charging standards and charging instructions
Small passenger cars with 1/7 seats and below 10 yuan/6 hours (free within 15 minutes), 2 yuan for more than 1 hour, and 1 hour for less than 1 hour, with a maximum of 30 yuan for 24 hours.
Bus with 2/8-19 seats costs 20 yuan/6 hours (free within 40 minutes). If it exceeds 1 hour, it will be charged 3 yuan. If it is less than 1 hour, it will be calculated as 1 hour. The maximum price in 24 hours shall not exceed 40 yuan.
25 yuan/6 hours for buses with 3/20 or more seats (free within 40 minutes), 4 yuan for more than 1 hour, and 1 hour for less than 1 hour, with a maximum of 50 yuan for 24 hours.
4. Military, police cars, ambulances, municipal engineering emergency repair vehicles and other special vehicles are free of charge.
Second, your company must publicize the charging items, charging standards, charging basis, 12358 price reporting hotline, etc. in a conspicuous position in the charging place, implement the sunshine charging regulations, and actively accept the supervision of the price department and society.
2. Request for funding for scenic area construction
According to the epidemic prevention and control requirements, in order to ensure the health and safety of tourists and merchants, the Ancient Culture Street Tourist Area will start from January 9, 2022 Temporarily closed until further notice. I hope everyone will actively cooperate and tell each other.
Thank you.
Ancient Culture Street Tourist Area
January 9, 2022
Today, Tianjin Eye Scenic Area announced that it will be temporarily closed starting from January 9, 2022 .
According to the epidemic prevention and control requirements, in order to ensure the health and safety of tourists, the Tianjin Eye Ferris Wheel Scenic Area will be temporarily suspended from January 9, 2022, and the reopening time will be notified later. I hope everyone will actively cooperate and tell each other. We apologize for the inconvenience caused to you.
Today, Tianjin Water Park announced that the west gate of the water park will be temporarily closed from now on.
Dear comrades tourists:
In accordance with the requirements of epidemic prevention and control and the one park, one policy, the west gate of the water park will be temporarily closed from now on after asking for instructions from superiors. The opening hours will be notified later. Sorry for the inconvenience.
3. Tourist Attraction Project Proposal
Project Proposal Format Sample
Project Proposal: The project proposal is submitted by the Chinese joint venturer to its competent authority Proposal document for establishing a joint venture with a foreign partner. On the basis of investigation and research, data collection, construction site survey and preliminary analysis of investment effects, the necessity and possibility of the proposed project are discussed. Its purpose is to obtain approval for the project.
Format: project name, sponsor, project leader. Name, country, capital and credit information, business scope, scale, product reputation, sales, etc. Chinese and foreign parties. Reasons for establishing a joint venture. This article explains the importance and necessity of establishing joint venture projects from the aspects of domestic technology gap, product quality gap, the need to introduce domestic and foreign markets, sales channels and the use of foreign capital.
Main contents of the project:
1. And the scale and scope of production and operation;
2. Number of years of joint venture;
3. The address, floor area and building area of ??the joint venture (including new construction, reconstruction or expansion);
4. The number of employees required by the joint venture, including technical personnel and management personnel;
5. Total investment, registered capital and capital contribution proportions of all parties;
6.
Investment methods and sources of funds;
7. The technical performance and sales direction of the product:
The technical performance level of the joint venture, its competitiveness at home and abroad, and whether the product is mainly sold domestically or exported;
8. Recent and future requirements and existing conditions
Preliminary research and forecast reports on market demand, or product reports from relevant competent authorities
Compilation of opinions;
4 .
A letter of intent from the competent authority on arranging major raw materials (including energy, transportation, etc.). );
5. Letter of intent from relevant departments regarding funding arrangements.
_______________________________________________________________
Example:
Sino-foreign joint venture project proposal
1. Project name: XXX product joint venture production (operation) project .
Project sponsor: (company name) year month day month day month day month day month day month day month day month day month day month day month day month day month day month day month day month day month day month day month day month day month day month. Month, day, day, day, moon, moon, moon, moon, sun, moon, day, day, day, day, day, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, and day, day, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, and day, day, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, and day, day, moon, moon, moon, moon, and day, day, day, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, moon, and day. Reasons for establishing a joint venture:
This article explains the necessity and importance of establishing a Sino-foreign joint venture from the differences in technology and product quality at home and abroad, as well as the use of foreign capital, product exports, training of talents, and increasing profits. sex.
Three. Information on Chinese joint ventures:
Introduce the basic information of the Chinese joint venture partners and the favorable conditions for establishing Sino-foreign joint ventures, including the nature of the enterprise (state-owned or collective), personnel, technical strength, leadership team, fixed assets, and equipment , site, raw product output, output value, profit, product exports, etc.
Four. Information on foreign joint ventures:
The name, country, capital, business scope, scale, product reputation and sales volume of the foreign party.
Sales status, etc.
Verb (abbreviation of verb) The main contents of a joint venture:
(1) Production (operation) scope and scale.
(2) Year of joint venture.
(3) Address, floor area, and construction area (new construction, expansion, reconstruction) of the joint venture.
(4) The total number and composition of employees of the joint venture (workers, technical personnel and management personnel).
(5) Total investment, registered capital and proportion of capital contribution from all parties.
(6) Investment methods and sources of funds: China will invest in land use rights, buildings, houses, machinery and equipment, etc.
Estimation of pricing, such as cash investment (foreign exchange, RMB) and sources (self-raised funds, loans,
lease); foreign parties should provide cash, machinery and equipment, industrial property rights (Patent, trademark
rights) or proprietary technology as investment, its price, valuation method and estimated amount.
(7) Product technical performance and sales direction
Whether the technical level to be achieved by the joint venture's products is competitive at home and abroad, and an estimate of the proportion of domestic and foreign products.
(8) Production (operation) conditions
The recent and future needs and existing conditions of the main raw materials, fuel, power, transportation, cooperation and supporting facilities required by the joint venture.
(9) Preliminary technical and economic benefit analysis.
Product performance and price (domestic and foreign sales), cost and revenue estimates.
Improvements in production means and production efficiency. Save energy and raw materials.
Calculation of Chinese and foreign economic benefits: profit estimation of all parties, project investment profit rate, investment payback period, etc. During the joint venture period.
Social benefit analysis: taxation, number of jobs, improvement in technical level, etc. During the joint venture period.
Intransitive verb project implementation plan:
When to carry out technical exchanges, overseas inspections, preparation of feasibility study reports, organization of negotiations, signing of contracts, construction, commissioning and production, etc.
If it is a planned and phased project, list the timetable for the phased project.
Attachment:
(1) Plan to invite foreign parties to China for technical exchanges.
(2) Study abroad plan.
(3) Feasibility study work plan, including arrangements for the personnel responsible for the feasibility study; if it is necessary to hire foreign experts for guidance or entrust consultation, a plan should be attached.
Note: When submitting a project proposal for approval, the attachments should be complete.
4. How to write a request for instructions on a scenic spot project
Yes, it depends on the purpose of your feasibility study. A feasibility study for any project has a purpose. For example, if a project is approved, a feasibility study report can be made on the entire scenic spot. Most of the current feasibility study reports are for applying for financial subsidies, so it is necessary to conduct a feasibility study report on a certain scenic spot or an individual item of a certain scenic spot according to the requirements of the subsidy policy.
5. Request for instructions on application for scenic spots
The southern county of Nanchong City, Sichuan Province is located in the northern part of the Sichuan Basin, in the middle reaches of Jiali
The county covers an area of ??2,235 square kilometers, with cultivated land 910,000 acres; it governs 71 towns, 2 sub-district offices, and 1,111 administrative village-level units, including 1,041 village committees and 70 neighborhood committees, with a total population of 1.32 million (2012 data). Among them, the county has a built-up area of ??30 square kilometers and a permanent population of 300,000. It belongs to a subtropical humid monsoon climate zone with shallow undulating hills, high terrain in the northwest and low terrain in the southeast, with an altitude of 298-826 meters.
Famous places of interest include Li Fengguan (a national key cultural relic protection unit), Monument Garden Buddha, Hongji, Zhongsheng Lake, etc.
Dongcheng District, Beijing
China China's first standing Buddha, the Yuji Mountain Buddha, was carved as a statue of Sakyamuni on the mountainside of Yuji Mountain. It is the first standing stone Buddha in ancient China, and together with the Leshan Seated Buddha and the Big-footed Reclining Buddha, it is also known as the three major Buddha statues in Bashu. The Buddha faces south and slightly west, standing on the negative rock, 18 meters high. The carving lines of the Buddha statue are simple and smooth, and the carving craftsmanship is exquisite. It looks like Wu Dai in the wind and a grass in the water. Its plastic art and carving style show the charm of stone carvings in the Tang Dynasty. It is now a national key cultural relic protection unit.
Holy Lake
Holy Lake Scenic Area is a national AAAA-level tourist attraction located in the northwest of southern Sichuan County. Including 14 towns in the southern county, namely Zhongsheng, Shuisheng, Zaojiao, Baocheng, Shuangfeng, Tiebian, Iori, Daping, Tongping, Dianya, Taixia, Xihe, Qiuya and Guangzhong, with a total area of 517 square kilometers.
Yanzi Scenic Area
Relying on urban construction and Hongyanzi Electric Navigation Project, Hongyanzi Scenic Area is composed of a wide lake after the completion of the three mountains, two gardens and one water project. There are three urban parks, Lingyun Mountain, Huofeng Mountain, Wumian Mountain, Manfuba Agricultural Sightseeing Park and Shiziling Ecological Botanical Sightseeing Park. The scenic area has built the largest city square in northern Sichuan with an area of ??more than 300 acres and outstanding features. It integrates commemoration and leisure and is a beautiful urban tourism landscape on the Langzhong Ancient City Tour Line.
Heilongguan Village
Heilongguan Village is a rural tourism demonstration village in our province. It is located in Slong Township, southern County of Sichuan, 32 kilometers away from the county seat, between Jianxing Town, Sanguan Town, The junction of three townships (towns) in Silong. It is called Heilongguan Village because there is an ancient Heilongguan Temple on the local mountain. This village is rich in fruits and lotus roots, with 425 acres of sweet fruit trees and 308 acres of lotus roots. Every family has fruit trees and every family has an orchard. It is known as the first lotus village in China.
House
Sword Temple, now the seat of the Nanbu County Buddhist Association, is a temple with a long history, rich Buddhist culture, rapid development, large-scale construction and complete facilities. It is one of the large temples in Nanchong. It is located in Lianhua Mountain, the center of Jianxing Town, southern Sichuan County, 25 kilometers away from the county seat and 0.5 kilometers away from the town. The mountains are like lotus flowers, lush green trees, and the BMW River surrounds the foothills. Haosi Temple covers an area of ??more than 800 acres. There are Buddhist buildings such as the Main Hall, the Heavenly King Hall, the Jade Guanyin Hall, the Maitreya Buddha Hall, the Thousand-Hand Avalokitesvara Hall, the Five View Hall, the Wanggao Pavilion, and the Fangsheng Pond. Among them, there are three seated statues of Tathagata in the Mahatma Hall, all of which are gold-plated. Their eyes are bright and look straight ahead, making them look lifelike.
According to the Sichuan Buddhist Association, Sichuan Buddhist Association [2013] Document No. 45 and the "Request for Instructions from Jianhao Temple in Nanchong City to Transmit the Bodhisattva Precepts to Lay Buddhists", from September 23 to 29, 2013, in Hao Jian, Nannan County The temple held the 19th Buddhist practice meeting for Buddhists in Nanchong City.
6. Scenic Area Request
Moon Scenic Area: Lalu Island
Lalu Island, formerly known as Guanghua Island, is located in the middle of the Sun Moon Lake Reservoir. Sun Moon Lake is the most attractive reservoir lake scenic spot in Taiwan. It is bounded by Lalu Island. The northern half is shaped like a sun wheel and the southern half is shaped like a moon hook, hence the name.
The floating island in the swimming pool is one of the attractions of Sun Moon Lake. The floating island refers to Lalu Island. In ancient times, this area was inhabited by the Thao people. At that time, Thao people called it Lalu Island. It was renamed Guanghua Island in 1946. The 921 earthquake damaged the Sun Moon Lake Dam, causing the water level in Sun Moon Lake to drop significantly. Guanghua Island produces a large amount of water, and Shao ruins were discovered on the island. Due to the efforts of Thao people, Guanghua Island was finally named Lalu (Lalu Island) in 2000, which means the holy island in the heart in Thao language. The status of Lalu Island has also been changed to the ancestral land of the Thao people, and tourists are no longer allowed to board and trample on it. There is also a theory that it is currently impossible to land on the island because there are too many tourists on the island and the island is too small to accommodate it, making it prone to danger.
According to legend, Lalu Island was once a sacred mountain for Thao people to believe in their ancestors and gods. When choosing a candidate, the teacher's mother, a Shao person, would go to Zhuzai Island (Lalu Island) on an auspicious day to ask the ancestral spirits for instructions. Only with the consent of the ancestral spirit can a witch be qualified and be able to take on the important task of reciting incantations and conducting ceremonies in the future.
7. Scenic spot project application sample letter
The following procedures need to be completed:
1. Scope of approval
In line with national industrial policies and land supply Policies, in line with the overall land use plan, batch land use within the urban planning area and individual site project land use outside the urban planning area.
2. Approval materials required by the land user
(1) 3 copies of project feasibility study report, approval and project establishment (filing, approval) documents;
(2) 3 copies of project preliminary design approval, 2 copies of project environmental impact assessment opinions;
(3) 2 copies of project environmental impact assessment opinions, 3 copies of geological hazard assessment report, and geological and mineral superposition opinions;
(4) 2 copies of the city's overall planning approval and drawings, 2 copies of the city's detailed planning approval and drawings, 2 copies of the 1:2000 planning red line map, 3 copies of the current land use map, 3 land survey and demarcation reports and drawings copies, 1 copy of CD.
(5) If the expropriated land involves forest land, 2 forest land review opinions are required;
(6) 3 construction land site selection opinions;
(7) 2 advance receipt notes for land compensation and resettlement funds to be acquired, coordinating land acquisition fees, farmland reclamation fees, paid use fees for new construction land, and land acquisition management fees allocated to the special account of the land department;
(8) 2 entrusted supplementary farmland agreements and 3 supplementary land use status maps of farmland plots;
(9) Fire protection, water and soil conservation plans, later support plans, and resettlement plans required for special land use, 3 copies of cultural relics management opinions;
(10) The Ministry of Land and Resources and the municipal land and resources department shall separately stipulate the required information.
8. Scenic Area Project Instruction Report Sample
The professionalism of the helicopter landing pad is mainly reflected in the final approval process of military and civil aviation procedures. If you are not professional enough, a series of problems may arise, including time and money, and you may not be able to obtain the certificate in the end.
Materials required for the helipad approval process:
Formal application documents with official seal;
Site description materials;
Flight plan design report:
Operation standards;
Airport usage rules;
Ownership of the airport;
Operator identification information.
How to apply for helipad approval?
It is necessary to prepare materials including the airport name and geographical location, ownership, operator identity information, address and phone number that can be contacted at any time, general airport flight site status description, etc., and submit it to the local government for planning permission and construction. license.
9. Request for instructions on scenic spot improvement and renovation projects
1. Tourism project application conditions
(1) The project unit has legal person status;
(2) Whether the project approval documents are complete;
(3) The source of investment is clear and construction supporting funds are implemented;
(4) The tourism resources have distinctive characteristics and the development conditions are mature and expected. The economic benefits are significant and national.
Any project unit that applies for the use of tourism funds and implements project approval or filing management should provide the following project application materials:
(1) Use of tourism settlement Project application report for transfer of funds.
(2) Provide the following licensing procedures (requirements) in accordance with the law:
1. Planning site selection opinion letter issued by the urban planning administrative department;
2. Preliminary review of project land issued by the land and resources administrative department? Or opinions on the state-owned land use rights transfer contract;
3. Approval opinions on environmental impact assessment documents issued by the environmental protection administrative department;
4. Involving state-owned assets or land use rights, Relevant departments should issue confirmation documents;
5. Natural and cultural tourism resource development projects must provide the scenic spots where the project is located.
6. Geological hazard assessment report
(3) Key scenic spots, nature reserves, forest parks and key cultural relics protection units at or above the municipal level with a total investment of more than 30 million yuan; 500 Tourism development and resource protection facilities of less than 10,000 yuan; projects with a total investment of more than 10 million yuan but less than 30 million yuan in world natural and cultural heritage reserves should be submitted to the municipal government’s investment department or the national development zone management committee authorized by the municipal government. meeting’s approval document.
(4) Loan discount projects should be accompanied by bank loan contracts, bank loan actual interest settlement tables and relevant legal documents for loan review.
(5) Attached are reports on contract signing, input-output, employment placement, and tax payment related to the award-subsidy project;
(6) Capital injection should comply with the scope of fund use.
The first, second and third paragraphs are required for all declared projects; the fourth, fifth and sixth paragraphs are mandatory for specific projects.
Three. Project application method and time
(1) Application method:
1. Municipal project owners applying for tourism funds should first submit an application to the competent department, which will then submit an application to the municipal tourism Apply to the bureau and send a copy to the Municipal Finance Bureau;
2. The district and county project owner unit submits an application to the district and county (autonomous county, city) tourism bureau, and then the district and county (autonomous county, city) tourism bureau and The Finance Bureau*** should also report to the Municipal Tourism Bureau and copy to the Municipal Finance Bureau;
(2) Application time: before the end of October each year.
IV. Tourism project review procedures
(1) Preliminary review of projects:
The Municipal Tourism Bureau and the Finance Bureau will conduct a preliminary review of the applied projects, focusing on the projects Whether it meets the application conditions and whether the application requirements provided by the owner are complete. Whether it meets the requirements of Chongqing Tourism Development Master Plan.
(2) Expert review:
The Municipal Tourism Bureau is responsible for establishing a tourism project evaluation expert database (hereinafter referred to as the expert database) consisting of tourism, culture, planning, municipal administration, land, transportation, finance It is composed of experts in other fields and is supplemented and adjusted every year.
For projects applied by municipal units and districts and counties, the Municipal Tourism Bureau, together with the Municipal Finance Bureau, Municipal Development and Reform Commission and other departments, will form an evaluation team from the expert database to evaluate the feasibility of the project according to the requirements of the city. Statement from the project unit, local government or competent department to formulate tourism development plans and related policies.
(3) Approval by the Municipal Tourism Economy Development Leading Group:
Projects that have been reviewed and approved by experts are reported to the Municipal Tourism Economy Leading Group for review, and projects that pass the review are entered into the tourism structure adjustment fund project library (Valid for three years).
: 10. Scenic spot project application report
1. My opinion on construction project site selection
2. Construction land planning permit
3. Building construction permit
4. Preliminary application for construction land
5. Application for use of forest land
6. Logging permit (trees cannot be felled at will)
7. Land use rights transfer agreement (agreement signed with villagers, attached to the project application form)
8. Construction land p
17. Project Contract for forest land development and utilization (with the Forestry Department/Bureau)
18. Land use certificate
19. Approval letter for forest land use
20. Highway roadside Tree felling license renewal (involving road management)
21. Project land pre-examination application report
22. State-owned land use rights transfer contract
23. State-owned Land use certificate
24. Highway operation license and highway operation application form
25. Overall land use plan (land planning of the Land and Resources Bureau, the planning should be based on this)
p>
26. Rural Planning and Construction Permit
27. Urban Planning and Construction Permit
28. Construction Project Fire Protection Acceptance Opinion (After Project Completion)
29. Construction project construction drawing design review certificate (construction drawing review)
30. Lightning protection device acceptance (the location of the famous lightning rod in the plan)
Planners need to know that during the project development process What procedures need to be followed and what issues need to be paid attention to is the realization of creative ideas.
It has little to do with mine assessment and planning, but it is also necessary to understand it properly to facilitate communication with Party A. For example, environmental impact assessment adopts a one-vote veto system, which is generally difficult to obtain when there are overlying mines. Development rights.