Suspended ceiling is a commonly used technique in house design, and is used in almost every household. Due to the huge market demand for ceilings, corresponding products are also increasing. Faced with the variety of ceiling products on the market, many consumers don’t know how to choose. Today we will introduce some better brands for your reference.
Which brand of ceiling is good
1. AIA (leading brand in the integrated ceiling industry, Zhejiang Jiaxing AIA Electric Co., Ltd.)
2. AOP ( The leading brand of kitchen and bathroom ceilings, Hangzhou Aopu Kitchen Technology Co., Ltd.)
3. Rongsheng (China's famous trademark, one of the top ten kitchen and bathroom ceiling brands, Guangdong Rongsheng Electric Co., Ltd.)
4. Baolan (Top Ten Brands of Kitchen and Bathroom Ceilings, Wangdian Image Enterprise in Jiaxing City, Zhejiang)
5. Tuscany (Top Ten Brands of Kitchen and Bathroom Ceilings, Creator of Intelligent Integrated Ceilings, Originated from Italy)
6. Chuchu (Top Ten Brands of Kitchen and Bathroom Ceilings, Shanghai Chuqiao Sanitary Ware Electric Co., Ltd.)
7. Aohua (Top Ten Brands of Kitchen and Bathroom Ceilings, Zhejiang Provincial famous trademark, Zhejiang Aohua Electric Co., Ltd.)
8. Fashilong integrated ceiling (well-known ceiling brand, Zhejiang Jiaxing Haiyan Fashilong integrated ceiling Co., Ltd.)
9 .Character (Top Ten Brands of Kitchen and Bathroom Ceilings)
10. Melkite (Top Ten Brands of Kitchen and Bathroom Ceilings, Zhejiang Jiaxing Melkite Bathroom and Kitchen Technology Co., Ltd.)
Ceiling Ceiling Installation strategy
1. Draw a sketch
1. On-site measurement to determine the distribution of pipes in the room, the height of the room, the location of room facilities and the location of ventilation windows, etc.
2. Draw a floor plan sketch of the room according to its size and shape.
1. Design
1. Select the color of the gusset plate and the model and quantity of the host, and design the best matching solution. (Usually done on a computer) 2. Calculate the amount of main keels, hooks, triangular keels and corner lines, and determine their positions.
2. Pre-installation work
1. Pre-treatment of the ceiling, determine the installation height of the suspended ceiling, the middle interlayer is greater than 300mm, use horizontal pipes to mark the four corners, and use an ink fountain A horizontal line pops up.
2. Determine the position of the ventilation window and use an electric hammer to drill a circular hole with a diameter of 100mm on the wall.
3. The wires are pre-buried. There are 2 lighting lines and 5 heater lines. In order to ensure normal use, 1 to 2 more wires can be pre-buried.
4. Handle water pipes, gas pipes and other pipelines, and check whether there are water leaks or electricity leaks.
3. Installation of corner lines
1. Cut the required corner lines on the four sides of the room according to the actual size of the wall.
2. Paste the required corner lines on the wall below the horizontal line, align the upper edge of the corner lines with the horizontal straight line, and mark the holes in the edge lines. The distance between the holes is 10 to 15cm. .
3. Use an electric hammer to drill a 4mm hole. When drilling, the crossed cross must be accurately used as the center point, and the hole depth is about 30mm.
4. Drive the expansion tube into the hole. The expansion tube must not exceed the installation wall.
5. According to the angle of the corner, cut both ends of each corner line into half of the corner. The standard corner is 90, that is, cut the two ends of the corner line into 45, and use 420 self-tapping Tighten the trimmed corner line with the screws, making sure that the diagonals of the corner line are flat and have a gap of 0.5mm.
6. If the corner line must be installed above the tiles, wooden strips should be installed along the wall before installing the corner lines. The thickness of the wooden strips is the same as that of the tiles, and the surface of the wooden strips Flush with the surface of the tiles, the installation method is the same as the installation on the corner line.
7. In addition, when the edge line is installed on the surface of the ceramic tile, you can also use strong glue such as 502 glue to stick it on the ceramic tile, so that all fixed wooden strips can be omitted.
4. Installation of the main keel
1. To install the fixed wooden strips, measure a distance of 30mm upward on the plane of the edge and corner lines, mark the lines and use an ink fountain to draw the horizontal lines. As the bottom line of the wooden strips.
2. Then pop the horizontal line about 40mm above the horizontal line, and use an 8mm-10mm drill bit to drill holes to install and fix the wooden strips. The hole spacing is 20-30mm and the hole depth is about 50mm.
3. Drive the wooden strip into the hole. The wooden strip must not be exposed on the wall, and draw a straight line directly below the small wooden strip to mark the hole position.
4. Use ordinary steel nails to nail into the fixed wooden strips and secure the fixed wooden strips firmly.
5. Generally, the installation spacing of the main keels is 600cm. However, when the installation of the main unit is hindered according to the drawing design, the spacing of the main keels must be adjusted for reasonable distribution. The thickness of the main keels is generally 5-10cm. Use 415 self-tapping screws secure the main keel to the fixed wooden bar and ensure firmness.
5. Installation of hooks
1. If the length of the main keel exceeds 150cm, a hook should be added in the middle and a suitable thin wire should be hung from the ceiling. Drill holes for mounting points and mark them.
2. Use an electric hammer to drill a hole with a diameter of 8mm and a depth of 50mm (be careful not to make it too deep), then determine the length of the hook, insert the end of the hook with the expansion tube into the hole, and tighten the nut. , after confirming that it is firm, put the hook (38 hanging piece) on the lower end and adjust it to the optimal height, and use machine screws to fix the hook and the main keel firmly.
6. Installation of triangular keel
1. Reasonably distribute the installation positions of the hanging parts on the main keel and mark them. The center line of the first triangular keel against the wall is 305mm away from the wall, and the distance between other triangular keels is 300mm (you can use a 300*300 gusset plate to measure the distance). Put a hanger on the triangular keel, and use the hanger to The triangular keel is fixedly connected to the main keel.
2. The gap between the wall-mounted aluminum gusset plate and the wall is about 5mm. This is mainly due to the flatness of the wall and the beauty of the aluminum gusset plate. If there is a deviation in the angle of the wall corner or the length of the symmetry plane is inconsistent, it should be distributed reasonably. If the error is large, a right-angled line should be pulled out on the assembly surface to install the triangular keel.
3. When installing triangular keels, the dimensions must be precise. The gap between each triangular keel is 300mm (except for the first one against the wall). The bottom plane of the triangular keel is 3.5-4mm higher than the corner line. Before installing the triangular keel, you should first determine which side to install it from to improve the overall appearance and save time.
4. The triangular hanger is fixed on the main keel and must be drilled. It cannot be loosened by tightening it with self-tapping screws.
7. Installation of the host
1. According to the drawing design, install the electrical host on the triangular keel. First use the aluminum gusset plate to test the installation to determine the correct position of the host, and put the packaging box Paste the drilling template inside at the location required to fix the host or directly when installing the host, drill holes according to the actual host installation holes, use an electric drill to drill 2.5mm holes, and then use the self-tapping screws that come with the host to secure the host firmly. Fixed on the triangular keel.
2. The lamp heating host and air heating host should be connected to the N line, and the L line (switch) should be connected.
3. When installing the lamp heating host, you should first screw in For the heating bulb, loosen the movable screw of the lamp heating bracket and adjust the position of the heating bulb. The standard for exposure of the heating bulb is: the aluminum layer of the heating bulb is flush with the panel, and the size is 30mm. The PTC heating block of the air heating host is 5mm away from the panel.
4. The ventilation fan should be installed within 1300mm from the ventilation hole, and the ventilation pipe should be 1500mm long. Note that the ventilation hole should be above the ceiling and slightly lower than the air outlet of the ventilation fan to prevent dew from flowing back in the ventilation pipe. The diameter of the ventilation hole is 100mm.
5. After all hosts are installed and fixed, conduct a power-on test to ensure that the hosts can be used normally.
8. Assembly of aluminum gusset plates
1. You must wear gloves when installing aluminum gusset plates!
2. First tear off the four-sided coating of the aluminum gusset plates. Start the installation from the keel of the main unit, and assemble it piece by piece to the wall. Keep the seam gaps consistent and align the four corners of the gusset plate. Pull all the clips on the trimmed corner lines to 60 degrees, and then start assembling the aluminum gusset plate of the first keel. When it comes to the last two pieces, the actual size should be measured. If cutting is needed, it should be cut before assembly. The cutting surface should be stuck between the clamping piece and the edge trimming surface. If necessary, pull the clamping piece to 90 degrees. The aluminum gusset plate and trimmed corner lines should be kept smooth (note: if unevenness occurs, use wooden blocks to fix it).
3. Do not assemble the last two aluminum gusset plates yet. Assemble the other aluminum gusset plates and panels first, keeping them flat, with consistent gaps, and straight seams.
4. Final assembly, measure the remaining dimensions. If the aluminum gusset plate needs to be cut, the aluminum gusset plate should be cut, and the last aluminum gusset plate should be installed and fixed before assembling the last second aluminum gusset plate. The gussets and gaps meet the overall requirements, and the seams are in a straight line with the whole.
9. Final inspection
1. The four diagonal corners of the aluminum gusset plate are flat and the flatness is consistent.
2. The drawing stripes of the aluminum gusset plates are in the same direction, and the gap between the aluminum gusset plates is less than 1mm.
3. All hosts can be used normally.
The suspended ceiling plays a big role in the interior decoration of the house. Good design and good shape can greatly improve the overall spatial effect of our house. The above introduction to several brands of ceilings and the installation guide for ceilings, I believe can help you choose the product you are satisfied with among the many products on the market.