The builder is the link to coordinate the relationship between grass-roots professional managers and workers on the construction site, and should direct and coordinate the relationship between grass-roots professional managers, such as budget officer, quality inspector, safety officer and material officer. The following is my summary report on the work of builders in 2022, which is for your reference only and I hope it will help you.

Summary report of the builder's work in 2022 1

Through several months' personal construction practice, the independent working ability of analyzing and learning to solve problems has been cultivated, which laid the foundation for further work in the future.

First, the internship content

Through work and labor, I understand the basic construction process of housing construction. Here I will make a simple summary of the understanding of reinforcement, formwork and concrete:

1, reinforcement engineering: reinforcement is one of the first choice and important materials for the development of modern architecture and future architecture. Reinforcement engineering, like the whole human skeleton, is one of the three major projects of concrete engineering. The classification of steel bars can generally be classified according to the production process, diameter and strength of steel bars. Production technology can generally be divided into hot rolled steel bars, cold rolled steel bars and cold drawn steel bars. Cold drawn steel bars can be divided into 8mm, 10mm, 12mm, 14mm, 16mm, 18mm, 20mm, 22mm and 25mm according to different diameters. 2. Formwork engineering: Formwork engineering of concrete structure engineering is a strict engineering of concrete molding construction. Template matching must be reasonably equipped, and the square steel bars removed from the bottom of the template must be arranged in a dispersed manner, so that the next layer of construction can save time and materials, and the joints of the template must be strictly prohibited, otherwise there will be slurry leakage, resulting in quality problems such as concrete honeycomb pits and rotten roots. Formwork construction must strictly control the verticality and flatness of each wall column, otherwise it will cause wall displacement and uneven wall surface.

2. Concrete engineering: Concrete engineering can be said to be an important part of the project, because the perception of engineering quantity is directly related to the construction technology of concrete engineering. The quality of steel bar binding is a hidden project, and concrete is the first impression, so the construction technology of concrete must be strictly controlled. In the construction process of concrete preparation, transportation, pouring and maintenance, they are interrelated and interrelated. Problems in any link will affect the whole construction quality. The preparation of concrete also includes the design of concrete and the mix proportion of concrete construction. The construction mixture ratio shall be subject to the laboratory (tested by concrete company), and the strength guarantee rate must reach 95%. Concrete mixing must be evenly mixed with symmetrical materials. Now most of the concrete is commercial concrete, which basically meets the requirements of mixing. Concrete pouring is the most important thing in concrete engineering. Only qualified pouring can ensure the strength of concrete, the compactness can meet the design requirements to ensure the integrity and durability of the mechanism, and the accurate size can ensure the smooth surface of concrete after formwork removal. After concrete pouring, the overall quality must be strictly controlled. Therefore, before pouring, the concealed works must be inspected and accepted, including the size, axis, bearing capacity and stability of the formwork and its frame. The quality of pouring is also closely related to the technical level of pouring workers. If the vibration is not dense, the honeycomb pits will be easily separated, and the reinforcement will be leaked in severe cases. In the process of concrete construction, we must also refer to the outdoor temperature at that time, especially the raft foundation concrete is thick. Temperature measuring tubes must be set to observe the temperature of concrete. The materials of temperature measuring tubes must meet the requirements, and their positions must be representative, which can detect the temperature of concrete at different depths.

Before concrete pouring, the sundries must be cleaned up, and it is forbidden to have sundries such as beverage bottles, abandoned templates, square wood, fasteners, cigarette butts and cigarette cases, otherwise the formwork will be easy to be hollowed out after dismantling, which will pose a serious threat to the engineering quality.

1 Through observation and summary, it is found that concrete cast-in-place slab is prone to cracks. Through direct analysis, there are the following reasons: commercial concrete, too many pump pipes, large slump, too many fine particles in concrete and high water-cement ratio, which are easy to cause shrinkage cracks.

2. Insufficient formwork support or premature formwork removal causes concrete to fall off, resulting in displacement of structural reinforcement and negative reinforcement. 3. The irregular use of reinforced cushion blocks leads to the insufficient thickness of cast-in-place reinforced concrete protective layer, which leads to its cracking.

4 after concrete pouring, the surface is not covered, and the maintenance is not in place, resulting in excessive water loss.

5. After concrete pouring, workers failed to bear a certain load, and piled up steel pipes, square timber, templates and other materials on the cast-in-place slab in advance, resulting in the construction load being greater than the use load. In order to prevent the above problems, the following measures should be taken reasonably: 1, focusing on controlling the concrete mixture ratio; 2, strictly control the position of the template; 3, it is forbidden to skew; 3, concrete pouring and vibrating must be fine, to prevent vibration leakage; 4, concrete curing should be aggravated; 5. Water should be added on time as needed; 5, concrete surface does not reach this certain load, it is forbidden to feed people.

6. Delay the form removal until it reaches a certain strength. When the concrete strength reaches more than 75% of the design according to regulations, the formwork can be removed.

Second, the internship experience:

In the hot summer and scorching sun, I started my first job search on an old bicycle. I stepped into countless thresholds and was politely rejected countless times. When the physics wheel stepped into the gate of the space-based downtown garden, my job search life was an end, so a young man had his own so-called learning garden. With the construction of Building 5 in the Central Garden of Aerospace City, my five-month internship has turned a new page. Under the careful guidance of Yang Gong and Gong Yi, my practical ability has been further improved. When I came to this construction site, I was making a raft waterproof. In recent months, I have studied the construction technology of raft foundation post-pouring belt, including leveling, setting out, steel bar inspection, formwork inspection and post-pouring. In this construction site, I not only learned more professional knowledge, but also learned how to have a good relationship with leaders and how to manage workers effectively and reasonably, which played an important role in the development of my life. I am very touched by my colleagues here. They are very kind to me. When we have dinner after work, my aunt who cooks makes a good meal for me and puts it on the table for me to eat. I often go downstairs in that hot weather. Zhao Gong in the supervision room asked me to go to his far office, and then used the cold water he had connected for me to drive away my heat. When I was sick, Sister Liu, the accountant, always put the medicine on my desk and kept it from me. There are so many things that moved me in this construction site that it is hard to describe it with my tortuous personality. In short, I am full of infinite gratitude to them from the bottom of my heart, and I spent thousands of words in just a few months.

I learned a lot of professional knowledge from my work in Yang Gong, which made me have a deeper understanding of my future formal work. After several months of study, I remembered a sentence: "There are no mistakes in the project, only errors are allowed, but the errors must be within the norms", which made me understand that I must work hard in the project. This is also a small mistake and negligence, which is likely to bring immeasurable losses to Iraqi workers.

Third, internship experience

Through several months of internship, I understand that interpersonal relationship is extremely important in construction work. Only good interpersonal relationship and strong ability to deal with various problems in the construction process can unite workers. I used to think that trying to do a good job in interpersonal relationships was nothing more than flattery, treating guests and giving gifts. Now I understand the addition of that knowledge. Most importantly, I must have an open personality in order to truly appreciate and respect others from the heart. If you can objectively explore the advantages of others and sincerely respect and appreciate others, your interpersonal relationship will be like a duck to water. Through months of communication with colleagues, I think a person who knows how to appreciate, respect and deal with interpersonal relationships will be very happy, and others will appreciate and respect you happily.

Talking about the choice of construction team from interpersonal relationship and thinking from the perspective of a project manager, I feel that this problem is very critical. The technical level of the construction team will directly affect the quality of the construction project and the economic benefits of the project manager. I feel that a good construction team can coordinate each other's work, but a bad construction team can make a mess of a perfect project. According to my observation and thinking, and compared with other buildings, I have a preliminary understanding and understanding of the internship site. I feel that my internship site is very team spirit, the level of construction teams is very good, and the construction teams cooperate well. Under the management of Wang Gong, the construction team will complete the project more orderly.

Fourth, theory is the key task of college life, and I feel that practice is also the second classroom of college life. The combination of theory and practice will make knowledge constantly updated and developed. Practice is the only criterion to test the truth, and it is also the aesthetic way for our college students to exercise and grow up. I feel that one's knowledge and ability can only play a role in practice, and the knowledge in textbooks can be enriched, improved and developed.

The practice of college students will lay a solid foundation for the next formal step into society. I think a qualified college student must learn to integrate theory with practice, constantly learn in practice, constantly sum up, gradually improve, innovate in practice, improve his knowledge and ability, and lay a good foundation for career success.

Finally, I would like to thank Zhumadian Tianji Real Estate Development Co., Ltd. for providing me with learning opportunities and teaching and living conditions in Vietnam. I will benefit from this internship for life. I will continue to study hard, strive to become a qualified builder in the new era and realize my life plan as soon as possible.

2022 builder's work summary report II

Time flies, in a blink of an eye, I have been working in the North Lake project in Jining for almost a year. When I graduated last year, I worked in Qingdao as a factory relocation project. I also learned a lot there and got a general understanding of the basic process of the project. The only fly in the ointment is that there is no high-rise building in this project, only a six-story dormitory building, a restaurant, a swimming pool and other infrastructure. After the project was completed, the company didn't take over the project, and I just graduated, and I don't have enough experience in industrial and civil construction. I really wanted to experience a tall building, and then I resigned. Thanks to Manager Sun of our company, he sent me to the Beihu Project Department in Jining, and I got my wish. The company took over five high-rise buildings and an underground garage. When I first arrived at the project department, external wall insulation was being done here, and internal wall plastering was also being carried out. Internal wall plastering quality inspection and acceptance every day. It's a little hard, but it's enough. Under the careful guidance of Jia Gong and Zong Gong, I have a better understanding of the acceptance procedure of interior wall plastering. During the floor beating stage, Jia Gong arranged for Zong Gong and I to look at the floor together, controlled the elevation every day, checked the slurry sweeping situation, and informed the construction team to correct the problem at the first time to prevent similar situations from happening the next day. Waterproofing, tiling and painting were carried out in the building. This short course gave me a better understanding of the construction technology and standards of each process of the project. At present, the project has entered the final stage, and the garage is also under intense and orderly progress. I believe that under the leadership of Dong Gong, the project will be successfully completed next year.

After working for more than two years, I feel that as a technician in the project department, I should do the following work well: get the construction drawings, carefully review the drawings at the first time, put forward and summarize the drawing problems, so as to contact the owner supervision of the design institute as soon as possible to participate in the blue prints.the design; On the basis of understanding the drawings, we should do a good job of calculating the quantity of engineering materials in each division with a serious and rigorous attitude (such as the required quantity of reinforced concrete formwork of a building) in order to effectively control the materials in the project construction process; Before the construction of any key parts, technicians should prepare various construction plans and technical disclosure materials in advance, and make technical disclosure to the foreman and team, and supervise the implementation of technical disclosure in the process of construction control.

In this year, I feel very fulfilled and gained a lot. I still have many shortcomings to make up, and I don't know much about all kinds of architectural drawings, national norms and regulations. For this reason, I downloaded the drawings and instructions of architecture, structure and installation, and read one every day, which I believe will make up for in the near future. I also need to further improve my communication skills. Communication is the bridge of work, and communication plays an extremely important role in my work, so I will try my best to improve it. I still have a lot to learn in my future work. For example, I feel that Jiagong has a really good grasp of the overall situation, and is quite calm in the face of unexpected situations of the supervisor, the owner and the construction team, which makes me admire. Also, while digging the garage, I was injured by an excavator while picking up steel pipes, and my teeth were seriously damaged. Fortunately, the company reimbursed me. Although I can't eat hard food any more, I am very touched. I will definitely work harder to repay the company at work next year.

Finally, I have a few suggestions, which I hope the leaders will adopt: First of all, I think the project department has too little information about the specifications of engineering atlas, and sometimes it is not convenient to find some information; Secondly, in the future work, we can participate in some technical discussions, because many times, we especially want to be a participant, not an executor, and we also have some small suggestions on technology; Finally, I hope that the leaders can make appropriate adjustments in terms of holidays, and whether our on-site personnel can go back to the office to rest in hot or cold weather.

3. 2022 builder's work summary report

Leaders:

Twenty years have passed and a new year is about to begin. On the occasion of resigning the old year and welcoming the new year, reviewing and summarizing the work experience of the past year is conducive to fostering strengths and avoiding weaknesses in future work and doing a better job in the future. This is a summary of the work in the past year.

13 In mid-August, I had the honor to join the team of Nantong No.4 Construction Company. This is the trust and esteem of the unit leaders, and I thank you!

In mid-August, the pile foundation project of building B0 1# I was in charge of was not completed, and the civil works were not ready for construction. The project department arranged for me to manage the construction and quality inspection of the secondary structure of Buildings 2 and 3, and assisted the construction personnel of Buildings 2 and 3 to participate in the survey and setting out of the main structure.

At the beginning of 10, with the gradual development of B0 1# building, I actively responded to the requirements of the project department, served as the construction and quality inspection of B0 1# building, worked hard to complete various work indicators, tried my best to cooperate with the project department to improve the site planning, implement the overlay facilities, reasonably arrange the construction procedures, organize on-site quality inspection, and coordinate the parallel operations of various construction teams.

I. Key Points and Difficulties

Building 1 and building B0 1# require high construction quality. In order to ensure high-quality structural engineering in Jiangsu Province, written technical disclosure should be made to all construction teams before construction, and the construction technology and quality requirements should be defined. The construction specifications and technical disclosure sheets should be taken as the acceptance criteria to control the engineering quality from the source.

2. Building B01# has a large building area, heavy production tasks and tight construction period. In order to ensure that the garage and the underground part of the main building are completed before the Spring Festival, I will arrange the construction progress plan reasonably, with a persistent attitude to complete the task and strive for the first line of the construction site.

3. The construction site of B01# building is small, and there are many materials in the underground engineering stage. Material stacking and civilized construction on site have become another difficulty in construction site management. In order to make the construction site messy and orderly, we closely monitor the use of materials on the site according to the actual situation, and we must ensure that there is not too much aggregate on the site, and we must not affect the project production plan because of insufficient materials.

Second, innovation and breakthrough.

65438+

2. At the joint of concrete, the adhesive sponge strip is pasted on the old concrete to strengthen the upper mold, which effectively controls the slurry leakage at the joint of concrete.

3. Using tea safety calculation software, the steel pipe spacing, step distance and stability of formwork support system of 250× 1250 large-section arc frame beam in underground garage are checked to ensure that formwork support is stable, safe and efficient.

4. According to my personal understanding, I came to this project department with the following firsts: the first builder who made formal written technical disclosure, the first builder who made his own formwork support system construction plan, the first builder who randomly checked the slump of commercial concrete, and the first builder who issued a withholding order of more than 30,000 yuan at the end of the year.

Three. Shortcomings and improvements

There will inevitably be mistakes in the project, and every mistake is a profound lesson. With lessons, we can enrich our experience, and with experience, we can avoid mistakes. At the same time, we should combine the actual situation and apply the professional knowledge we have learned to practice. If you don't understand and are vague, communicate with other professionals in time, which not only improves your professional quality, but also increases your practical experience.

Although I have taken a big step towards my goal in this year, I still see some direct and insufficient aspects of myself, which need our efforts. In the coming year, I believe I will make a breakthrough and achieve success.

Four, some suggestions for the project department

1, the guard system exists in name only, and the construction personnel of this project are free to enter and leave, and no one asks. The doorman is the first image of an enterprise. It is suggested to strengthen the guard management system and enhance the corporate image.

2. The civilized construction at the site is seriously chaotic, and the main road of cement road poured at a high price is dusty in sunny days and muddy in rainy days. It is recommended to spend more time on manual cleaning and washing to prevent mess.

3. The management of safe electricity use is not in place, and the phenomenon of random connection and multi-purpose of one brake occurs from time to time. I have repeatedly asked the main wires of building B0 1# to take measures to protect them. As a result, the wire was lifted after being pressed twice by the earthwork team. Better late than never.

4. The quality of on-site construction is generally low, and the quality management system of the project department has not been put in place. In the later period, because of the time limit for a project, the quality consciousness of the construction team became even weaker. It is suggested that the project department should strengthen the quality inspection, and the technical director of the project should compile and implement the quality management measures of the project department. In the process of construction, it is necessary to make disclosure in advance, process control, post-inspection and one-vote veto system for quality problems. The project department can try to organize a quality inspection and appraisal once a month to promote the best and worst teams economically. Once a month, the contract price of the best team goes up 1%, and the contract price of the worst team goes down 1%, and it is calculated 12 times a year.

5. It is suggested to replace the bricklayer's team. The overall quality of the team is low, and they are all rural bricklayers in the surrounding construction sites, with low personal technical content. At the same time, the contractor team has several projects in Xuzhou construction market, often paying attention to one thing and neglecting the other, resulting in serious honeycomb pits in many underground garages of B0 1# building.

In the new year, by summing up the previous year's work experience, we can find out the shortcomings and overcome them in the future work, so as to improve our overall work ability, enhance our sense of responsibility and do all the work and tasks arranged by the project in time. In the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of enterprises and make the company's construction strength and technical strength grow continuously.

4. Summary Report on Work of Builders in 2022

Time flies. I have been working for almost half a year in a blink of an eye. In the past six months, I have changed from a college student to a construction worker and entered the society from an ivory tower. During my work, I grew up under my own efforts and the guidance of my predecessors, and I can gradually adapt to the current pace and intensity of work. During this time, I deeply realized the responsibility of a builder, and at the same time realized my own shortcomings in my work. Now I will make the following summary of my work during this period.

For the builder, first of all, it is necessary to master the daily work content, technical specifications and construction technology to be constructed every day, so as to better handle it in the field management and coordination. The site is a place to test people's ability, not only to master the technology, but also to manage and coordinate the whole site. During the six months' work as a builder, I have gained a lot, not only mastering the construction knowledge, but also greatly improving the communication with people at all levels, including getting along with colleagues, getting along with subcontractors, and even communicating with construction units and supervisors. All this has benefited me a lot.

The construction industry is different from other industries. It needs constant on-site inspection and supervision in order to find and solve problems at any time, and these works are carried out in the harsh environment on the spot. This requires us to constantly cultivate the spirit of hard work, not afraid of hardship and fatigue, let go of the lofty attitude of managers, and constantly enrich our learned talents from the actual work of the project, so that our on-site comprehensive processing ability can be exercised and improved. I should constantly improve myself in my future work, mainly from the following aspects:

1, strengthen business study, read more standard atlas, turn over drawings, ask if you don't understand, and never pretend to understand;

2. Make a good work plan for the day and tomorrow, make a good work plan for this week and next week every week, and don't fight unprepared;

3. Improve psychological resilience, be uncompromising and not discouraged in the face of difficulties, and have the spirit of never giving up;

4. Enhance your language skills and communication skills, be good at communicating with all kinds of people and improve your execution;

Plan your own life route and put it into practice, be upright and be practical.

These are some of my experiences since I joined the work. Due to my limited level, there are inevitably omissions and shortcomings. I will gradually set a good position for myself in the future work and study process, and make a better plan and summary of my future work. Architecture is an art. We are all architectural artists. We chose architecture and a new world. I believe that with the efforts of all Xintiandi people, Xintiandi's tomorrow will be better.

5. 2022 builder's work summary report

My name is X. I am currently working as a construction worker in X Company. I have been in the company for more than nine years and have been struggling in the construction line. In the long-term work, I have developed the habit of hard work. I love construction management, work actively, and study construction technology hard. It has undertaken the book distribution center project of Shandong Xinhua Bookstore, with a construction area of 35,000 ㎡, and won the title of "Excellent Construction Site with Provincial Safety and Civilization", and 35# and 36# residential buildings of Huayu Vocational and Technical College. The project was rated as "provincial safe and civilized construction site" and the C and D districts of Dongzi Cultural Street. This project is a group project, 9# residential building project of waterfront garden, with a construction area of 552 1㎡. This project won the title of "Provincial Excellent Safety and Civilization Construction Site" and the Oriental Hawaii Garden Community Project with a building area of 80,000 ㎡. This project won the title of "Provincial Excellent Safety and Civilization Construction Site" and "Excellent Safety and Civilization Construction Site".

As a builder who has worked for many years, I have been constantly enriching my professional knowledge. With a pragmatic and down-to-earth working attitude, we explore in practice, actively explore and innovate in experience, and constantly improve our working ability. While completing many projects, I also improved myself to some extent and achieved myself. Now I have summed up a series of my own growth and shortcomings, hoping to face my works with a newer and stronger look in the future.

First, the implementation of post responsibilities

As the manager of the project department, I attach importance to controlling the construction quality of the project, coordinating the relationship with the construction unit and supervision unit, coordinating the management of the team, automatically cooperating with the security department to complete various safety management work, paying close attention to material management and saving the project cost. It is important to clarify the following aspects:

1, project quality management.

Every construction project requires a high standard and a high starting point. In the early stage of construction, pay attention to the technical disclosure of the team, pay attention to the team members ideologically, and understand the quality, progress and safety requirements of the project technically, so as to lay a good foundation for the later construction.

2. Team management and coordination

Attach importance to the training of each team leader. At every meeting, in view of the problems existing in construction cooperation, I try to make every comrade take the leading position at least once to increase experience, so that every comrade can be independent and deal with various problems, thus improving the overall business skill level of each team.

3, safety management work

In the process of work, it is an inseparable part of every project management to automatically cooperate with the Security Section to complete the safety management and education of construction personnel.

4. Coordination with the construction unit and supervision unit

As a construction manager, it is the best embodiment of the continuous progress of the builder's work to pay attention to the coordination with the construction unit and supervision unit in each project, take the lead in studying and implementing the good suggestions put forward by the construction unit and supervision unit, and strive to win the unanimous praise of the construction unit and supervision unit.

5. Technical management

The requirements for construction technology are more stringent. We must study the construction drawings and specifications carefully to ensure the construction quality. At the same time, it is necessary to record the construction points, construction methods and punishment regulations, so as to ensure that there is no omission in technical disclosure and try to anticipate and solve it in advance. In view of some key problems, we must put forward specific requirements to the construction team at the beginning of each construction stage, especially emphasize the seriousness of the problem, and patiently explain the requirements in the specification to them.

Second, the problems existing in the work

1, for its part, sometimes it is not comprehensive enough to consider the problem, blindly listen to the opinions of the construction team, and draw conclusions without making a clearer and more detailed analysis of the incident, resulting in unnecessary losses. In management, there is no severe punishment for teams that don't listen to instructions and do things according to requirements. Over time, individual construction teams have fluky psychology, which leads to out-of-control management in the later management work and difficulties in work arrangement and on-site management. In the future management work, we must first make clear our own position, give full play to the leading role of the project manager in the construction site, make clear the rewards and punishments for the construction team, form a leadership method centered on the project department, and never be soft on those construction teams who don't listen to the instructions, implement strict punishment and establish construction prestige.

2, in terms of construction technology, due to the lack of construction experience. At the construction site, it is impossible to find out the construction situation accurately and quickly.

The existing problems, such as the inability to use construction drawings and construction specifications flexibly and skillfully, have caused the derailment of the actual construction process and theoretical construction, that is, the expected construction effect has not been achieved, and the construction procedure has become complicated, thus increasing the construction cost. This taught me that in the future construction process, we must be familiar with the construction drawings and construction specifications, and master them well, so as to better apply the construction specifications to the site construction.

III. Future Work Plan

By summing up the past work, we can find out the shortcomings in our work so as to overcome them in our future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time.

In short, in the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises, and make progress and growth with my favorite construction career.

Articles related to the builder's work summary report in 2022:

★ The builder's personal work summary is the latest in 2022.

★ 2022 Personal Work Summary: General 5 articles

★ The latest work summary report for 2022.

★ Summary of selected works in 2022

★ Top Ten Latest Personal Work Summary Reports in 2022

★ Annual Work Summary of Technicians in 2022 10

★ The latest 10 work summary report at the end of 2022.

★ Personal work summary template for 2022 10.

★ Five construction summary reports of the Project Department in 2022.

★ General 10 2022 builder's practice summary