What are the steps of decoration? What should I do first?
I. Preliminary Design

In the preliminary design, one thing that must be done is to make a detailed measurement of your room, which is not only accurate when buying building materials, but also can avoid being hacked when settling accounts.

Second, the main body of demolition and transformation

Entering the construction stage, the main body demolition and transformation is the first project, which mainly includes wall demolition, wall peeling, heating installation, plastic steel window replacement and so on.

Third, hydropower transformation.

Between the hydropower transformation and the main body demolition, the first test of the cabinet should also be carried out. And put forward some suggestions on the location of the water inlet and lampblack machine socket reserved by the developer.

Fourth, carpentry

Woodworking, bricklayer and painter are the "three brothers" in the construction process, and the basic order of appearance is: woodworking, bricklayer (bricklayer) and painter.

Verb (short for verb) Gaiwa

If the workers are busy, the foreman will usually ask the "second mason" to stick bricks before the "carpenter boss" ends. This is normal, because the two do not conflict.

Six, brush the wall paint

The third oiler entered the site, mainly finishing the wall foundation treatment, painting the top coat, and painting the furniture made by the first carpenter. Beginners who are ready to paste wallpaper only need to let the "third oil worker" do the basic treatment on the wall surface where wallpaper is planned to be pasted.

Seven, kitchen and bathroom ceiling

As an installation link, the kitchen and bathroom ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the cabinet should have been bought. It is best to install the ceiling lamp and exhaust fan (Yuba) of the cabinet guard at the same time, or leave a thread end and hole.

Eight, cabinet installation

After the ceiling is completed, you can make an appointment to install the cabinet at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

Nine, wooden door installation

The second day after the cabinet was installed, the wooden door should have been measured more than a month ago. If it succeeds, it will be one day. At the same time, the hinges, locks and floor drains to be installed should be prepared in advance.

X. floor installation

Before the floor is installed, it is best to let the manufacturer visit the site to investigate whether the ground needs leveling or partial leveling. Before the floor is installed, the floor paved at home should be cleaned, the ground should be dry, and no water should be used during the cleaning process.

XI。 Paving wallpaper

The day after the floor is installed, you can make an appointment to paste wallpaper when the home is cleaned up. If possible, the floor should be protected on the day of wallpaper pasting.

Matters needing attention in family decoration

1, the lamps in the bedroom are preferably double-controlled, which is convenient and applicable. And pay attention to the layout of the bedroom, try to choose warm colors, which is warm and natural.

2. The layout of kitchen decoration must be scientific and reasonable. The pool and the stove should not be too far away or too close. Lighting should generally be equipped with overall lighting and local lighting, and all kinds of kitchen utensils must be placed conveniently and quickly.

3, when using cement, we must pay attention to heat preservation, especially the brick has been pasted, when the temperature drops suddenly, it is most likely to affect the strength of cement. In winter construction, it is best to add antifreeze to cement to ensure the construction quality. When the villa terrace is tiled, it should be covered with a layer of external thermal insulation material to ensure double insurance.

4. Try to avoid using monochromatic and gorgeous materials. A single material can not be effectively matched with the indoor environment, which easily leads to a bad mood; Brightly colored materials contain more chemicals, which are more harmful to human body.