1. Process of opening a water plant
1. The prerequisite is to have a plan for what you want to do.
2. Have sufficient funds.
3. Drill deep wells.
4. Machines for water production and filling and packaging equipment.
5. Buy a car that delivers water.
6. Recruiting personnel.
2. To operate a water plant, you must obtain the following "licenses"
1. "Production License" and "SC Certification" (originally called "QS") Quality and Technical Supervision Bureau.
2. "Employee Health Certificate" Health Bureau.
You can apply for the following documents:
1. "Business License" Industrial and Commercial Bureau.
2. "Tax Registration Certificate" tax bureau.
3. Factory building requirements
The feasibility assessment will be carried out based on the evaluation reports of natural mineral water and pure water approved by the drinking water experts of the competent departments and authenticated by the geological and mineral departments. , must not blindly sign and build factories blindly.
1. Never build a factory far away from a water source (well, spring). The best solution is to keep the factory building and the water source closest to each other.
2. The size of the factory should depend on the mineable reserves of mineral water and purified water, resource sources, production capacity of purified water plant equipment, mineral water plant equipment, and the degree of financial guarantee.
4. Factory decoration requirements
The scale of the factory is based on the factory construction requirements, but the factory must be as spacious and comfortable as possible while accommodating filling and other equipment. Generally, medium-sized enterprises are 20-50 meters long and 10-15 meters wide. Within this range, different purposes are divided into bottle washing, filling, water treatment, etc. The requirements in the workshop must be clean and dust-free with terrazzo floors, smooth drainage, and no accumulation of water. The walls should be tiled, etc. The factory building should be airtight, and aluminum alloy doors and windows should be used. The washing, filling and capping parts can be specially made into closed workshops.
5. Water plant equipment:
It must be "RO" secondary reverse osmosis pure water production equipment that has obtained the "water-related approval document" approved by the relevant Ministry of Health.
1. Water plant equipment can be selected with larger pure water output (at least 2 tons/hour water production equipment, 150 barrels/hour or more barrel filling machine, barrel brushing machine, sealing machine, sterile workshop).
2. The water supply station equipment can be smaller (1 ton/hour, about 400 barrels/day).
6. Funds:
A minimum of 100,000-150,000 yuan (excluding factory buildings) is required to run a water plant.
1. Go to the Industrial and Commercial Bureau to apply for a business license.
2. Go to the tax bureau to apply for a tax registration certificate.
3. Go to the Technical Supervision Bureau to apply for a production license, which is SC certification (originally called "QS").