How to install concrete creeper conveyor

1. First, install the base frame of the ivy hoist and tighten the embedded screws. The self-elevating platform is in place so that the center line of the frame and the center line of the column coincide with the center line of the column. The bottom section is placed in the frame and the lower end is in line with the center line of the column. The bottom frame is connected with screws, the lifting pulley is placed on the top of the two installed columns, the manual winch is installed on the self-elevating platform, the lifting wire rope is threaded, and the grating rod is placed on the self-elevating platform.

2. Next, use a hand winch to lift the platform until the table top is flush with the top of the pole. Remove the lifting pulley and place it on the top of the first set of standard sections. Install the winch and directional pulley, thread the wire rope, and connect Pass the winch switch box.

3. A set of horizontal and diagonal support attachment rods are provided at the last layer of the material receiving platform, which are firmly connected to the embedded steel pipes with fasteners, and a set of goose head parking devices are provided. The total height is reduced by 3 meters. Install the height limit device and lift the hanging basket.