Party A:
Party B:
Project name:
Contract signing place:
In accordance with the requirements of People's Republic of China (PRC) Contract Law, People's Republic of China (PRC) Construction Law and other relevant laws, regulations and bidding documents, and in combination with the construction contract of the construction project and the specific conditions of this project, Party A and Party B agree to sign this contract on the principles of equality, voluntariness, fairness, honesty and credit for common compliance.
I. Overview of the Project:
1, project name:
2. Project address:
3. Place of signing the contract:
Second, the way of contracting:
1, the comprehensive unit price is a lump sum price, which has included (package finished product production, package installation, package completion acceptance, free maintenance during the warranty period, semi-finished materials fee, freight, installation acceptance fee, tax, material inspection fee, glass cleaning, materials on-site and off-site transportation, insurance and risks, all measures, profits and other expenses).
2. Settlement method: comprehensive unit price × engineering quantity (engineering quantity is calculated according to the actual installation size of doors and windows on site). .
The comprehensive unit prices of this project are: sliding door component/㎡, sliding window component/㎡, sightseeing elevator curtain wall component/㎡, underground passage glass curtain wall component/㎡, underground passage steel canopy component/㎡, sightseeing elevator steel structure component (single item) and underground passage steel structure component (single item). The engineering quantity at the time of settlement shall be calculated based on the actual size of doors and windows actually installed on site, and confirmed by both parties.
3. The project quantity is tentatively set as ㎡, and the total project cost is tentatively set as: yuan.
Third, the material requirements:
1. The surface treatment of aluminum alloy profile is powder spraying, and the color is the sample specified by Party A. The sliding window adopts 90 series, and the wall thickness of the main material is not less than1.4 mm; ; The sliding door adopts 90 series, the wall thickness of the main material is not less than 2.0 mm, the shutter is 50 series, the wall thickness of the shutter frame is not less than 1.2mm, and the wall thickness of the shutter is not less than1.0mm. The doors and windows are made of 5+6A+5mm hollow double-layer toughened radiation-proof white glass.
The number of doors and windows shall be measured, manufactured and installed on site by the winning bidder according to the number and size after the completion acceptance, and each set of doors and windows must be marked with the aluminum alloy trademark of the manufacturer.
2. The adhesive tape must be "Rongji" brand, made of EPDM, rubber strip or rubber strip, and shall not harden during the warranty period. Glass glue adopts "Guangdong Baiyun" or "Hangzhou Zhijiang" brand. All hardware fittings must use "Liang Jian" brand, and all sliding doors and windows use crescent locks and double nylon rollers. All door and window screws must use stainless steel screws.
3, glass curtain wall, steel roof, glass roof, steel canopy
The hotel sightseeing elevator adopts 140 series hidden frame curtain wall, with aluminum alloy profile with 3.0mm main keel and 2.5mm cross beam. The glass is made of 8 mm thick white glass by hot bending. The material specifications and requirements of steel beams shall be in strict accordance with the bidding drawings.
4. The curtain wall at the entrance and exit of the basement adopts 140 series hidden frame curtain wall, and the wall thickness of aluminum alloy profile is 3.0mm for the main keel and 2.5mm for the cross beam. The glass is made of hollow double-layer tempered white glass with a thickness of 5+6A+5mm.
5. The steel canopy at the entrance and exit of the basement adopts 6+ 1. 14pvb+6mm double tempered laminated glass. Steel structure materials and aluminum plates with edges along the mouth must be quoted in strict accordance with the bidding drawings.
6. The ceiling and glass roof at the entrance and exit of the basement adopt 6+ 1. 14pvb+6mm double tempered laminated glass, and the steel structure materials and aluminum plates with edges along the mouth are quoted in strict accordance with the bidding drawings.
7, glass canopy and roof, glass curtain wall glue must use "Guangdong Baiyun" or "Hangzhou Zhijiang" brand. Hardware must use "Liang Jian" brand, and the hidden frame curtain wall opening fan uses two-point lock.
8. Connecting screws used for curtain wall must all be made of stainless steel.
Four, acceptance criteria:
Doors and windows shall conform to the requirements of GB/T7 106-2008 standard, with air tightness level 3, water tightness level 3 and wind pressure level 3.
1. Party B shall issue the goods certificate and the ex-factory inspection report, and present the original inspection report issued by a legally qualified inspection agency and provide a copy; Where the production license management is implemented, the production license shall be produced; Provide raw materials and quality inspection reports. Specific inspection items should include: brand, profile, coating thickness, hardware fittings, inspection report of quality inspection department, etc. If Party B fails to provide the above information, Party A has the right to refuse to accept it.
2. After the goods enter the site, Party B shall supervise and inspect the variety, specification, size and quantity of the goods, and install them only after they are qualified. If the goods fail to pass the inspection, Party A has the right to reject them on the spot. Party A may also raise a written objection to Party B after receiving the goods. If it is verified by both parties that it is really the responsibility of Party B, Party A has the right to return the goods.
3. Party A has the right to request acceptance of the goods with sealed samples, and recheck the quality of each batch of goods. If the quality of the goods does not meet the agreed technical quality requirements, Party A has the right to return them.
4. The methods of sample sealing and reinspection shall be implemented by both parties in accordance with the Code for Application of Doors and Windows in Residential Buildings and the Code for Acceptance of Construction Quality of Building Energy-saving Projects, and there shall be no leakage of anticorrosive coating, otherwise it will not be accepted.
5. The re-inspection appraisal institution agreed by both parties is the Quality Supervision Station of Wanning Bureau of Quality and Technical Supervision, and the inspection expenses shall be borne by Party B. ..
Verb (abbreviation for verb) Terms of payment:
1, there is no advance payment for this project;
2. Within 5 days after Party B's first batch of materials arrives at the site, Party A shall pay Party B 50% of the provisional total price of the project contract;
3. Party A shall pay 80% of the total provisional contract price to Party B within 5 days after the installation of door and window frames is completed and the first batch of glass arrives at the site;
4. Within 5 days after the doors and windows are installed and accepted, Party A shall pay 90% of the total provisional contract price to Party B;
5. Within three months after the project completion acceptance, both parties shall complete the settlement of this project. Party A shall pay 95% of the total project settlement within 5 days after the settlement data are confirmed and signed by both parties and all the completion data are filed, and the remaining 5% shall be used as the warranty money, which will be returned without interest within one month after the warranty period expires.
6. Party B shall issue a qualified invoice with the same amount according to the acceptance certificate signed and sealed by Party A on site, and go through the payment procedures for the project.
Sixth, the responsibilities of both parties;
Party A does not provide the warehouse and accommodation responsibilities of the construction unit, and the construction unit will solve them by itself.
1. Party A's responsibilities:
Coordinate on-site installation conditions and construction coordination fee standards of civil subcontractors (65438+ below 0.5% of the provisional total price of doors and windows), or negotiate with the general contractor.
After receiving Party B's notice, go to the site for acceptance and sign for approval in time, and will not be responsible for site storage. Pay in time according to the contract requirements.
2. Party B's responsibilities:
(1) Party B shall supply and install the goods on time with good quality and quantity as agreed in the contract, including all processes such as sealing the outer frame, and determine the opening direction of doors and windows on site and assume the responsibility.
(2) Party B shall make technical disclosure on the storage and use of the goods, and take full responsibility for all safety accidents during the installation and construction. Neither Party A nor the supervision unit is responsible.
(3) During the warranty period, Party B shall carry out free maintenance, and must arrive at the site for free maintenance within 48 hours after receiving the notice from Party A or the construction unit. If the delay fails to arrive at the site, Party A has the right to trace the fine of 654.38 yuan+00,000 yuan each time, and Party A shall continue to claim the full amount from Party B for the expenses arising from its own maintenance.
(4) Party B is responsible for the protection of finished products and the collection and arrangement of technical data after installation and acceptance. Responsible for the waterproof treatment after the door frame is closed.
(5) After the civil construction of cement sockets for doors and windows is completed, the door and window installation unit must handle the waterproof sealant for the outer frame to ensure that it will not leak due to shrinkage cracks.
(6) When Party A proposes to modify or change (semi-finished products) processed or installed by Party B, Party B shall actively cooperate. However, Party A shall truthfully grant Party B a visa and compensation.
Seven. warranty terms
Quality guarantee period of aluminum alloy doors and windows, glass curtain walls, shutters, etc. It is 24 months after the completion acceptance, and the maintenance is free during the warranty period. (Warping deformation of doors and windows, curtain walls and aluminum alloy materials caused by non-human factors, inflexible and noisy door and window switches, natural bursting of glass or deformation and aging of other materials, water leakage of doors and windows, hardening and fission of rubber strips, rusting of hardware fittings, use of materials inconsistent with bidding contract documents, peeling, discoloration, corrosion and oxidation of aluminum alloy coating, etc.). ).)
Eight. responsibility for breach of contract
1, Party A's liability for breach of contract
(1) Party A shall pay the project funds according to the contract, and pay 0.3% of the project funds payable to Party B as liquidated damages for each day overdue.
(2) If the delivery place or consignee is wrong due to Party A's reasons, Party A shall be responsible for it.
(3) If Party A fails to perform other obligations as agreed in the contract, causing losses to Party B, it shall bear the corresponding liability for compensation.
(4) If Party B fails to deliver the goods on time or the installation period is extended due to reasons not attributable to Party B, Party A shall coordinate and solve it in time, and the construction period or delivery date shall be postponed accordingly.
2. Party B's liability for breach of contract
(1) If the delivery is overdue for more than 5 days due to Party B's own reasons or responsibilities, Party A shall be paid a penalty of 3 ‰ of the overdue delivery price every day; If the overdue period is over 15 days, Party A has the right to terminate the contract.
(2) If Party B is rejected or returned by Party A according to the contract after delivery, Party B shall bear the liability for breach of contract for overdue delivery, and the installation period will not be extended.
(3) If Party B fails to perform other obligations as agreed in the contract, causing losses to Party A, it shall bear the corresponding liability for compensation.
Nine. Dispute resolution method
Any dispute arising from this contract can be settled by both parties through consultation, or by bringing a lawsuit to the people's court in the place where the contract is signed or arbitration by the Arbitration Commission.
X. Other agreements
1. This contract is made in sextuplicate, and Party B holds two copies. Have the same legal effect.
2. This contract shall come into effect as of the date of signature and seal by both parties, and shall expire on the date when the project warranty period expires and the project payment is fully settled.
3. For matters not covered, both parties shall sign a supplementary agreement through negotiation.
4. Both parties shall attach copies of business licenses and other relevant documents to Party B when signing this contract, and submit the copies to Party A for filing. If the signatory of the contract is not the legal representative, a power of attorney shall be submitted.
5. When both parties are unable to perform the contract due to force majeure, they shall promptly notify the other party of the reasons for their inability to perform the contract and provide written proof within 7 days.
6. Supplementary terms 1: If Party A supplements (increases or changes) the purchase quantity, Party B shall not refuse or raise the price, and fulfill the requirements of the above contract terms.
7. Supplementary clause 2: When signing the contract, Party B shall submit the company's business license, qualification, tax registration, enterprise code certificate, legal person identity certificate, power of attorney of the client, and a copy of the ID card, and the original shall be ready for inspection. The tender documents are an integral part of the contract terms, which shall prevail.
Below is the signature page, without the contract text.
Party A (seal): Party B (seal):
Domicile: domicile:
Legal representative or client:
Telephone number of civil engineering unit:
Person in charge: Fax:
Bank of deposit:
Account number:
Tax registration certificate number: