Who knows what the process of building a new factory is?
As follows:

1. site selection: site selection shall be made according to the relevant requirements of the products produced, and the possible pollution to the surrounding environment caused by production shall be considered.

2. Prepare the articles of association of the company and apply for a business license at the Industrial and Commercial Bureau.

3, according to the relevant requirements of the products produced, prepare the workshop and workshop, in terms of water quality, environmental protection, environment and other aspects should meet the requirements.

4, to the local bureau of standards and metrology bid for enterprise product standards, bid for the product bar code.

5. Customize trademark samples in advertising companies. Apply for trademark registration in the Trademark Office.

6. Install debugging equipment and carry out sample trial production.

7. Apply to the tax authorities for tax matters.

8, packaging and raw material procurement, formulate internal rules and regulations, mass production.

9, enterprise IC planning, product advertising.

Construction process of new steel structure workshop:

First, we should have a piece of land and make a plan according to the actual area.

Two, according to the factory planning and design drawings, reported to the Planning Bureau.

Three, apply for land, land departments must build and give land red line.

Four, according to the planning and design of the factory building drawings.

Five, find the construction unit construction drawing.

Six, choose the construction unit to communicate with the design unit.

Seven, the construction unit according to the planning drawings pay-off and construction according to the construction drawing.

Find a qualified organization to make an "environmental impact assessment report form (or registration form or report) of the project under construction", then submit it to the local environmental protection bureau for examination and approval, and then register with the industrial and commercial bureau to apply for a business license.

Procedures/steps for applying for construction real estate

1. Register the company with the Industrial and Commercial Bureau, and pay attention to the registered capital.

2. Apply for real estate qualification in the Construction Committee and the Construction Department.

3. Go to the storage center of Land and Resources Bureau to find a clean place to recruit, shoot and hang.

4. After winning the bid, pay the leasing fee as required, that is, the land payment.

5. Then apply for a land certificate.

6, design bidding, architectural design, drawing review.

7. After applying to the Planning Bureau for a planning permit,

8, team bidding, to the construction committee to deal with the "construction permit",

9. Pay relevant insurance and expenses. After the inspection by the Planning Bureau,

Developed program

Pre-work stage:

1. Site engineering investigation (confirm that the investigation unit has investigated the site geology)

2, access to land use rights

3, land acquisition, demolition and resettlement

4. Planning and design

5. Implementation of development funds

6. Formulate the construction plan (construction plan includes: construction organization and coordination plan, building materials and equipment supply plan, construction drawing design plan, infrastructure supporting contact and negotiation plan, project list and project progress plan, cash flow statement, negotiation and signing plan with contractors, etc.). ).

7, the construction site leveling.

construction phase

1, project contracting

2, construction organization and management

3, project control and supervision

4. Project completion acceptance

In addition, development and application programs are generally as follows:

1, and obtain the state-owned land use certificate.

2. Planning approval

3. Handling site selection opinions

4. Project establishment

5, for the construction land planning permit

6. Construction Permit (Construction Project Development Manual)

7. Statement of architectural design scheme

8, the construction project planning permit

9, construction drawing approval