1. Single-choice questions (***60 questions, each question is worth 1 point. Among the alternatives for each question, only one is most consistent with the meaning of the question).
1. Only after obtaining the construction engineer qualification certificate and passing ( ) can you be qualified to serve as the project manager of a construction project in the name of a construction engineer.
A Registration B Registration
C Filing D Passing the assessment of the unit where you work
2. The main body of formulating administrative regulations is ( ).
A The National People's Congress B The Standing Committee of the National People's Congress
C The State Council D The Supreme People's Court
3. The two companies that entered into the contract merged, so that The existing creditor's rights and debts are extinguished. This fact is the creditor's rights and debts ( )
A Offset B Withdrawal
C Confused D Exemption
4 Company A rented scaffolding from Company B, and the contract stipulated that the rent should be paid at the end of each month. However, Company A refused to pay when it was due. Company B’s statute of limitations was ( ) years from the date of payment.
A 1 B 2
C 4 D 20
5. According to the Property Law, it is not suitable to be used to pledge property ( ).
A Bill of exchange B Warehouse receipt
C Construction land D Accounts receivable
6. In the following acts, it is not necessary to include the building and its occupied areas The right to use construction land shall be disposed of together with ( ).
A Transfer B Mortgage
C Capital contribution D Fire insurance
7. The construction contract of a certain construction project stipulates that the contract period is 18 months and the contract price is 20 million yuan, as stipulated by law. When a construction unit applies for a construction license, in principle, the minimum amount of funds in place is ( ) 10,000 yuan.
A 100 B 200
C 600 D 1000
8. Regarding the construction project contracting system, the correct statement is ( ).
A The general contract can be in written or oral form
B The contractor can break down the main body of a unit project into several parts for subcontracting
C Construction project Contracts can only be issued through bidding, not directly.
D The state advocates general contracting for construction projects
9. Among the following statements about subcontracting of construction projects, which one is legally subcontracted by the contractor? ( ).
A Subcontracting labor services in contracted projects without permission from the construction unit
B Subcontracting professional projects to unqualified contractors
C Subcontracting labor services to unqualified contractors
D Subcontracting professional projects in contracted projects to others without permission from the construction unit
10. A, B, C Four companies, D and D, form a consortium to bid. Which of the following behaviors of the consortium members is correct ( ).
A Company A, a member of the consortium, separately bids for the project in its own name
B Members of the consortium signed a bidding agreement
C Company B and Company C, members of the consortium, formed a new consortium to bid for the project
D Four companies, A, B, C and D, established a new company as the leader of the consortium's bid.
11. For a construction project construction contract concluded through bidding, the contract price should be ( ).
A Bid evaluation price B Bid quotation
C Bidding control price D Base bid
12. During the establishment of the bid evaluation committee, which of the following practices complies with the regulations? ( ).
A The list of members of the bid evaluation committee will be kept confidential before the bid evaluation is settled
B Among the seven members of the bid evaluation committee, three are representatives of the tenderer
C Project bid evaluation experts are randomly selected from the list of relevant experts in the expert database of the bidding agency
D. The bid evaluation committee consists of two members.
13. After the bid evaluation, A was recommended as the first successful bidder. However, before the bid winning notice was issued, the tenderer received a written notice from A to launch the bid. The correct statement about A’s behavior is ( ).
A means withdrawing the bid document within the validity period of the bid
B means giving up the bid
C A's request cannot be accepted and must continue to participate in the bid
D A can apply to the tenderer for a refund of part of the bid deposit
14. Regarding the safety production guarantee of production and business units, the correct statement is ( ).
A Production and business units must participate in work-related injury social insurance and pay relevant fees for employees
B If a construction project implements general contracting, the construction unit shall bear overall responsibility for the safety production of the construction unit
C The user of the safety facilities in the construction project should be responsible for the design of the safety facilities
D The storage location of flammable and explosive materials of a certain unit is in the same building as the employee dormitory
15. If the main person in charge of a production and business unit fails to perform safety production management duties, resulting in a production safety accident and is sentenced to fixed-term imprisonment, according to my country's production safety regulations, the sentence will be suspended from the date of completion of the sentence ( ).
A shall not serve as a middle-level manager of the construction enterprise within 2 years
B shall not serve as the main person in charge of the supervision unit within 3 years
C shall not serve as any other person within 5 years The main person in charge of the production and business unit
D shall not serve as the main person in charge of any construction enterprise for life
16. After a production safety accident occurs in the production and business unit, the construction personnel at the accident site must report it immediately ( ).
A The person in charge of the enterprise
B The local safety production supervision and management department
C The local people's government at or above the county level
D Including ( Autonomous Prefecture. Municipality) Safety Production Supervision and Management Department
17. During the construction of a curtain wall professional subcontracting project, a safety accident occurred, resulting in the death of two people. According to the (Construction Project Safety Production Management Regulations) Accidents should be reported to the relevant competent authorities by ( )
A Curtain wall subcontracting enterprise B Construction general contracting enterprise
C Supervision unit D Construction unit
18. According to the State Council (Special Equipment Safety Assurance Regulations) Inspection agencies engaged in periodic inspection of construction hoisting machinery shall be approved by ( ).
A The people's government at or above the county level B The special equipment safety supervision department of the provincial government
C The State Council D The special equipment safety supervision department of the State Council
19. Real estate company A Among the following practices, the one that complies with the legal provisions on production safety is ( ).
A requires construction companies to purchase unqualified fire-fighting equipment designated by them
B When applying for a construction permit, there is no need to provide information on measures to ensure safe construction of the project
C A The underground engineering information provided to the construction company is inaccurate
D A submitted the relevant information to the relevant departments 15 days before the demolition project started
20. Regarding the safety responsibility of the construction unit, correct is ( ).
A The construction unit puts forward requirements that are lower than the mandatory requirements based on its own situation
B The construction unit has the right to compress the construction period stipulated in the contract
C The construction unit can Subcontract the demolition project to any construction enterprise
D The construction unit shall provide the construction enterprise with relevant information on adjacent buildings at the construction site according to project needs
21 According to the Regulations on Production Safety Management of Construction Projects , regarding accidental injury insurance, the correct statement is ( ).
A Accidental injury insurance is optional
B The insurance is handled by the construction unit
C If the construction general contracting is implemented, the construction general contractor shall pay the insurance premium
D The insurance period starts from the date the insurance contract is concluded and ends on the date the completion acceptance is passed
22 The special construction plan for the foundation pit support project must be implemented after being signed by ( ).
A The project manager of the construction company and the on-site supervision engineer
B The person in charge of the construction company and the person in charge of the construction unit
C The person in charge of the construction unit and the chief supervision engineer
D Construction enterprise technical director and chief supervisory engineer
23 The extension time for enterprise safety production license is ( ) months before the expiration date.
A 1 B 2
C 3 D 6
24 According to the Construction Project Quality Management Regulations, for decoration projects involving ( ), the construction unit should entrust the original design The unit or a design unit with corresponding qualifications proposes a design plan.
A Increase the internal decoration of the project B Change the main body and load-bearing structure of the building
C Increase the total cost of the project D Change the local use functions of the construction project
25 Total construction of the construction project When a contracting enterprise subcontracts professional projects, the correct statement regarding the responsibility for project quality is ( ).
A The subcontracting enterprise is solely responsible for the quality of the subcontracted project
B The subcontracting enterprise is solely responsible for the quality of the subcontracted project
C The general contractor is responsible for The subcontracting enterprise is jointly and severally responsible for the quality of the subcontracted project
D The subcontracting enterprise accepts the quality management of the general contracting enterprise and does not assume responsibility
26 Quality defects caused by design reasons will be covered during the project warranty period. The correct way to say is ( ).
A The construction company is not only responsible, but also bears the warranty costs
B The construction company is only responsible for the warranty, and the resulting expenses should be claimed from the construction unit
C The construction company is only responsible for the warranty, and the resulting expenses should be claimed from the design unit
D The construction company is not responsible for the warranty, and the construction unit is responsible for the maintenance.
27 Must be approved by the chief supervisory engineer The signed job is ( ).
A Laying out positioning before the start of construction B Acceptance of sub-projects
C Next step D Acceptance of construction project completion
28 A construction company is at the supplier's office The cement purchased had a significantly lower grade than the one on the package, causing the construction company to suffer losses. As for the construction company’s claim for compensation ( ).
A Can only be borne by the manufacturer B Can only be borne by the supplier
C Can only be borne by the construction company D Can claim compensation from the manufacturer
29 .For construction projects that require fire protection design, the construction unit shall submit relevant information to ( ) for approval.
A Public security firefighting agency B Construction project safety supervision agency
C Construction administrative department D Higher-level competent department
30 Among the following disputes, which one is a labor dispute? ( ).
A A dispute between an enterprise employee Shen and a local labor and social security administrative department over the identification of work-related injuries
B A dispute arising from a company shareholder Li over dividend distribution
C Wang Dispute between a certain company and the social insurance agency over retirement expenses
D Dispute between a process worker and a labor subcontracting company over wages
31 Labor dispatch unit and dispatched person The minimum labor contract should be ( ) years.
A 6 months B 1 year
C 2 years D 5 years
32 If the labor contract only stipulates a probation period, according to the provisions of the Labor Contract Law, The result of this processing is ( ).
A The probation period is the labor contract period
B Treat it as an invalid labor contract
C Treat it as an indefinite-term contract
D Treated as a contract with a deadline for completing certain work tasks
33 A contract with a deadline for the employer and the employee to complete certain tasks is a ( ) labor contract.
A Fixed term B No fixed term
C Determined to complete certain tasks D Short term
34 Among the following liability for breach of contract, which one is civil liability? ( ).
A warning B fine
C payment of liquidated damages D confiscation of property
35 Among the following contracts, the ones subject to contract law are ( ).
A Marriage B Adoption
C Sale and purchase D Administration
36 In contract law, the time when an offer takes effect is ( ).
A When the offeror issues an offer B When the offer reaches the offeree
C When the offeree makes a commitment D When the offeree's commitment arrives
37 In the Construction Project Bidding Law, the legal nature of bidding is ( ).
A Offer B Invitation to Offer
C Counter-offer D Acceptance
38 The offeree has issued a commitment beyond the acceptance period, and the offeror has not acknowledged the commitment. Notification of commitment shall be regarded as ( ).
A Commitment timeout B Commitment delay
C New commitment D New offer
39 In contract law, the following situations are considered invalid contracts ( ).
A The party is unable to perform B The party has a major misunderstanding of the contract
C Violation of the mandatory provisions of the law D Violation of the statutory form
40 Regarding revocability In a contract, the right of rescission shall be exercised within ( ) years from the date when the creditor knows or should know the reasons for rescission.
A 1 month B 3 months
C 6 months D 1 year
41 Regarding the pending contract, the correct statement is ( ).
A The counterparty in good faith does not have the right to cancel
B The counterparty to a specific contract has the right to demand
C The pending contract is an effective contract
D The pending contract is an invalid contract
42 A owes B 500,000 yuan for the project, and B owes C 200,000 yuan for the goods. Because B failed to exercise its due creditor's rights and was unable to repay C's debt. , for this reason C sues A to pay the debt. The following statement is correct ( ).
A C cannot sue A in his own name
B C’s lawsuit against A is actually exercising the right of subrogation
C C’s lawsuit against A is limited to 500,000 yuan
D C shall pay the prosecution fees himself
43 In the following circumstances, the creditor cannot exercise the statutory right of revocation ( ).
A The transferee knew that the debtor transferred property at an unreasonably low price
B The debtor gave up the due creditor's rights
C The debtor donated huge amounts of property to others
D The debtor transfers all his property
44 A and B signed a construction materials sales contract, and the situation can only be changed by consensus of both parties ( ).
A Change of name of Company A B Change of legal representative of Company B
C Change of contract signer D Change of purchase and sale quantity
45 The design cost of a certain project is 1 million , the contract stipulates that the liquidated damages are 15,000 yuan. After the contract issuing party paid a deposit of 150,000 yuan, the designer did not carry out the design work, resulting in a loss of 120,000 yuan for the contract issuing party. The maximum price that the contract issuing party can receive support is ( )
A 24 B 27
C 30 D 42
46 Regarding the guarantee, the correct statement is ( ).
(It’s really hard to see clearly)
D uses a money order as
47 In the bank guarantee issued by a construction unit, the guarantor is ( ).
A Supervision unit B Bank
C Construction unit D Construction enterprise
48 The deposit contract takes effect when (C).
A Signature of the parties B Contract filing
C Actual delivery of deposit D Establishment of the main contract
49 Wang was accidentally injured while working at the construction site. Under mediation, Wang and his employer reached an agreement. The employer paid Wang a one-time payment of 20,000 yuan as compensation, and Wang gave up his right to litigate. This mediation method is ( ).
A Administrative mediation B Court mediation
C Arbitration mediation D People’s mediation
50 The final decision reflects the ( ) characteristics of arbitration.
A Professional B Voluntary
C Independent D Quick
51. The confidentiality feature of arbitration is reflected in the principle of others ( )
A No trial B No agents allowed to participate
C No public hearing D No witnesses allowed
52. Under the auspices of the court, Party A and Party B reached an adjustment agreement, and the court produced If Party A regrets signing the mediation letter before signing it, the court should ( )
A retain B enforce it
C
53. Registration in place A The construction unit signed a construction project construction contract in place C with the construction unit registered in place B. The contract stipulates that if a dispute occurs, the party shall file a lawsuit with the court in place C.
Then the principle of the place of settlement of disputes in this contract is ( )
A The location of the plaintiff B The location of the defendant
C The place where the contract is signed D The place where the contract is executed
54. In civil litigation, the litigation rights exercised by "general authorization" are ( )
A. Represent... B. Reconciliation
C... D. Court debate
55 , dissatisfied with the first-instance civil judgment made by the people's court, the appeal period is ( ) day from the date of delivery of the judgment
A 5 B
C 10 D 15 days
56. If one party fails to implement the arbitration document issued by the arbitration institution after it becomes effective, the other party may apply to ( ) for compulsory enforcement
A People’s Court B Judicial administrative agency
C Arbitration institution D Public security organ
57. Regarding arbitration and mediation, the correct statement is ( )
A The arbitral tribunal must conduct mediation first
B Mediation failed No document can be made
C The arbitration mediation document and the arbitration document have the same legal effect
D…
58. During the arbitration process, the claimant A and the respondent Party B can reconcile on its own. The following are in compliance with the provisions of our country's laws: ( )
A A and B cannot reconcile on their own
B A and B cannot withdraw the arbitration application after reaching a settlement
C If A withdraws his arbitration application and then regrets it, he shall not apply for arbitration on the same matter
D A and B...
59. A, B and C form an arbitral tribunal, with A as the chief Arbitrator A believes that the claim of the applicant should be supported, and B and C believe that the claim of the respondent should be supported. The following is correct: ( )
A should make an arbitration award based on the opinions of B and C
B should make an arbitration agreement based on A’s opinions
C All opinions of A, B, and C should be listed and submitted to the arbitration committee for a decision
D. Make an arbitration agreement based on A’s opinions, and truthfully record the opinions of B and C in the arbitration agreement.
60. The construction company believes that ( )...it is a legitimate organization and can apply for administrative reconsideration.
A The breach of contract by the construction unit B The decision of the chief supervisory engineer to stop work
C The decision of the superior enterprise D The fine imposed by the administrative agency
2. Multiple choices Questions (***20 questions, each question is worth 2 points. Among the choices for each question, 2 or more are in line with the meaning of the question, and at least one is wrong. If there are multiple choices, no points will be awarded for this question; if there are less choices, each selected Each option is worth 0.5 points)
61. The construction of a certain gymnasium implements general project contracting. The contracting unit can contract ( ) of the project together
A is responsible for the construction of B
C Supervision D Design
E Equipment procurement
62. Among the conditions for establishing a civil legal act, the legal content of the act is ( )
A does not violate Law B. Does not violate social ethics
C... D Does not conflict with the interests of third parties
E Does not conflict with social ethics
63. Among the following mortgaged properties, the mortgage rights have been established since registration ( )
A Building B Construction land use rights
B Production equipment and materials D Construction in progress
p>
E Ship under construction
64. During the implementation of project supervision, the main supervision basis is ( )
A...B national mandatory standards for project construction
C Engineering design documents D Construction enterprise management system
E Construction project construction contract
65. If the bidder has ( ) behavior within the validity period of the bid, its The bid security deposit will be forfeited.
A Withdraw the bid documents B Supplement the bid documents
C Give up the bid D Clarify the bid documents
E……
66. Construction operations Construction workers' safety production obligations ( )
A Use labor production safety equipment
B Receive safety production training
C Report any accident immediately
D...
E for myself...
67. A construction company signed a safety production responsibility letter with its workers. The content is: The workers of the construction company work seriously. If a safety accident occurs, the consequences will be It’s up to the workers.
Regarding the above clause, the correct one is ( )
A If a safety accident occurs, the worker shall be responsible for it B. This clause is invalid
C The construction enterprise shall be subject to administrative penalties D...
E The person in charge of the construction enterprise shall be subject to an administrative fine
68. According to the "Regulations on the Management of Safety Production in Construction Projects", the main responsibilities of the project person in charge of the construction enterprise in terms of safety production are ( )
A Be responsible for the safety production of construction projects B. Implement the safety production responsibility system
C Develop safety production rules and operating procedures D. Ensure the special use of safety production expenses
E Organize and formulate safety construction measures based on the characteristics of the work
69. The conditions for obtaining a production safety license are ( )
A. Special operators pass the assessment. B. Employees participate in work-related injury insurance
C passed the safety production management system certification D conducted a safety evaluation
E has handled safety...
70. According to the "Regulations on Quality Supervision of Construction Projects", quality The warranty book should contain the following contents: ( )
A Warranty scope B Warranty period
C Return method of quality deposit D Quality deposit retention ratio
E Warranty Responsibility
71. Among the following behaviors of suppliers, the ones that comply with the "Product Quality Law" are ( )
A Establishing a purchase inspection system
B Product...
C Explain the use of defective products
D In order to expand sales,...
E Products that are about to expire are sold at reduced prices
72. A certain traffic construction passes through a noise-sensitive area,..., which of the following statements is correct ( )
A All night construction is prohibited
B If night construction is carried out due to special needs, a license must be obtained Approval
C must be announced to reassure the people
D...
E 15 days before the start of construction,... the administrative department report
73. According to According to the "Labor Contract Law", the actions taken by the employer when signing a contract with employees include ( )
A…B…
C…D. Liquidated damages for signing professional technical training services
E Signing a non-competition
74. The construction project contract belongs to ( )
A A famous contract B A practical contract
C A formal contract D Paid Contract
E Unilateral Contract
75. The party who should perform the contract documents first has definite evidence to prove that the other party ( ) has the right to exercise the right of defense
A. The operating conditions have seriously deteriorated. B. The legal representative will be held criminally responsible
C. Loss D. The enterprise has a large debt
E. Transferring property in an attempt to avoid debt
76. When the contract rights document is terminated, the validity of ( ) will not be affected
A Settlement clause B Clean-up clause
C Arbitration clause D Guarantee clause
E…
77. The liability for civil breach of contract can be borne in the following ways: ( )
A Compensation for losses
B Take...
C Deposit D Compensation for mental loss
E Apologize
78. The construction unit..., according to the "Civil Procedure Law"..., the construction unit can List ( ) as its defendant
A agency B general contractor
C subcontractor D actual constructor
E construction administrative department
p>
79. Regarding the recusal system in civil litigation, the correct statement is ( )
Party A must apply for recusal before the hearing
Party B can apply for recusal. Submit it before the court pronounces the judgment
C... If the agent's family members only serve as translators, they do not need to recuse themselves
D The People's Court's decision to recuse may be made orally or in writing
E During the period of application for recusal review, the person being challenged may not stop participating in the work of the case
80. Regarding the arbitration agreement, the correct statement is ( )
A The arbitration agreement should be in writing
B The arbitration agreement can be concluded orally, but it needs to be approved by both parties
C The arbitration agreement must be reached before the dispute occurs
D Without an arbitration agreement, arbitration cannot be carried out
The arbitration agreement excludes the People’s Court’s jurisdiction over contract disputes