It is also important to test the pressurization after the water pipes are arranged.
The carpenter's doorcase should also match the bricklayer's tiles. When covering the door cover, it is necessary to consider whether the ground below (either side of the ground on both sides of the door) should be leveled with ceramic tiles or other cement mortar, because if the door cover is nailed before tiling, it will cover the ground. When cement is used in the future, if the cement and the door cover are stained, it will lead to water absorption and mildew of the door cover wood.
7. The bottom of the mattress and the bedplate must be breathable. Generally, it is best to use fir boards as bed boards.
8. Try to use paper tape when drawing.
9. Pay attention when buying lamps: generally try to use glass, stainless steel, copper or wood (shelves). Generally don't buy any iron with other coatings and paints on it, which is easy to fade.
10. The washbasin should use ceramic basin as far as possible, and the glass basin is difficult to clean.
1 1. Hydropower reconstruction should be planned by themselves, and they are required to drive in a straight line. I watched them draw their own lines, and they all followed them. You must personally check and accept every project.
12. Waterproofing must be done well, and water must be tested!
13. Many verbal agreements in construction have become a gap when checking out, so be sure to write them clearly in black and white. Be sure to ask clearly about the added or reduced items and write clearly the price!
14. If the floor is installed on the ground, the ground should be re-cemented and leveled.
15. For the kitchen door, it is best to use a carpenter who wants to decorate it into a wooden rail door.
16. Install as many power plugs as possible in the living room.
17. There is a partition outside the shower in the bathroom. You can't save yourself by pulling the shower curtain. Actually, it was very inconvenient, and the water spilled all over the floor.
18. Doors and doorframes shall be made of fine-grained materials.
19. Make sure that your waterway is OK before installing the cabinet.
20. Don't choose white for kitchen and bathroom floor tiles.
2 1. The ceiling should pay special attention to leveling putty before plastering Dulux.
22. Don't have too many lights in the living room, it's better to be concise, otherwise it will be like a lamp shop! ! !
23. Buy things that need to be installed and try to install the goods. It really doesn't include installation. After installation, you must insist on paying the full amount! !
24. When decorating, bring the business cards of the manufacturers and merchants you collected before.
25. It is best to remove the protective film of aluminum gusset plate before installation.
26. It is best to use shutter doors for shoe cabinets to prevent odor. A socket can be left next to the shoe cabinet for inserting and airing shoes.
27. A small lamp can be installed in the place where vegetables are cut.
28. If it is convenient, the restaurant can also install an exhaust fan, so that when eating hot pot or barbecue, the ceiling of the hall will not be dirty.
29. It's best to arrange a cabinet for sundries at the door, which can be placed on the shoe cabinet. It is convenient to put common things, such as umbrellas, bags, scissors, change, medicines that you often take, etc. There.
30. There is absolutely no need to use expensive smallpox. If you are not too worried about humidity and oil fume, it is recommended to brush waterproof paint with moisture-proof gypsum board. A guest guard of my family made this. It's very beautiful. If you must use aluminum gusset ceiling, I suggest 1, not too expensive. 2. Use solid colors, especially the kitchen ceiling. Pure white will do. Unless the color matches the decoration style, it is easy to be out of harmony. Make up your mind and don't trust the eyes that sell the ceiling. Their eyes are really corny. 4, staring at the scene, it is very important to close the edge, don't let them be sloppy, or leave a black seam, which is ugly.
3 1. Third, if you need to punch holes, continue to stick tiles, and the exhaust holes of range hoods and water heaters should be pre-punched. It's inconvenient to wait until the tile is pasted. Therefore, before the renovation, you must choose the range hood, cooker and water heater to determine the size of the hole.
32. Considering that the customized cabinets are beautiful, but not durable, after synthesizing the opinions and experiences of some students on the Internet, the floor cabinets are made of cement, with ceramic tiles inside and outside, marble countertops, hanging cabinets and cabinet doors made of wood. The cabinets made by this method are durable and moisture-proof. And it doesn't cost much Many neighbors read it and said yes, I didn't blow it.
33. After making the door cover, the plasterer began to install plaster lines and paint the walls. The wall of my house was originally flat, and 2-3 roads could be approved. When approving the ash, it is to polish it once, then brush the primer, polish it again after brushing, and finally brush the top coat twice with ICI. The whole wall looks smooth and flat, which is really good. After the wall smallpox project was completed, the carpenter began to make wardrobes. The wardrobe is made of 18cm Ye Wei brand core board with decorative board outside. Although it is not as beautiful as the furniture store, it is durable and the quality should be better than the one bought. I'm not afraid to stand on the board of the cabinet. I'm afraid not. The backboard is also thick, and I bought it very thin.
34. Other students must pay attention to the following points when pasting tiles: ① It is best to be on site; ② Some imperfect tiles can be pasted by workers in some invisible places in the future, such as cabinets, sinks and mirrors. Be careful not to let workers paste them in the above positions, otherwise nothing will be seen in the future and money will be wasted. (3) Before the wall brick and floor tile are pasted, the soaking time must be enough. (4) Be sure to block the floor drain with something to prevent the cement from falling and blocking. The floor drain in my house is blocked by falling cement. Looking for the management office to clear 30 doors and get a lot of mud. ⑤ Workers will not waste too many tiles when people are on site. My family wasn't there when I put up the tiles. Later, when I went to see them, a lot of bricks were wasted, which was very painful. All sweat and rice.
35. Length and height of the wall. If a bathroom has four walls, the length and height of each wall should be measured. Then deduct the area of a window and door. Finally, calculate the area of the ground. After you have measured your size, you can also take it to the shop selling tiles, and they will help you satisfy it again. Just add a 5% loss.
36. It is best to control the ceiling lamp in the bedroom, one by the door and the other by the bed, so as to avoid lying in bed and turning off the lights in winter.
37. The location, height and spacing of sockets must be calculated. Occasionally, the position of the card holder was hit by steel bars first, and then the card holder was found to be blocked by TV cabinets, microwave ovens and desks, so we had to move the position of the first two pieces of furniture higher. Finally, it is found that not only the height is not ergonomic, but also the stainless steel cabinet feet can't be bought properly, so we can only order aluminum feet.
38. Just install a light at the corner of the aisle, which is bright and effective.
39. I didn't consider the position of the dining table when I installed the lamp. Now the light is not in the middle of the table.
40. Don't use bathroom tiles in Tai Su. First, it is easy to get dirty, and second, it is too dull after a long time!
4 1. More sockets should be installed, furniture should be bought outside, the floor should be dirt-resistant and safe, the model rooms should be seen more, and the principle should be adhered to.
42. There is no need to buy expensive aluminum gusset plates. Very cheap aluminum gusset plate is far superior to PVC, and no matter how much it costs, there is no obvious difference in effect. Pay special attention to the keel rather than the aluminum gusset itself when buying aluminum gusset plates (the goal of aluminum gusset plates is too big to be easily tampered with), and ghosts often end up on the keel.
43. It was difficult to find a floor tile with a satisfactory color, so I didn't find it. However, two unsatisfactory colors can be staggered and then turned at a 45-degree angle to achieve satisfactory results. This is a good suggestion put forward by the bricklayer himself.
44. If you hit the cabinet on the top of the balcony, add a layer of foam plastic board behind the cabinet, which has a very good heat insulation and waterproof effect. It is best to use fire-proof boards for balcony doors. The environment of the balcony is relatively poor.
45. If there is no suitable wood thread, it may be customized. The customized quality seems to be better than the sample. And customization is more personalized.
46. Stainless steel feet used in bathroom cabinets are profiteering, and it is very cheap to find some places on the back of the store.
47. When installing the door lock, you should pay attention to some wax on the lock tongue. If it is damaged, it will be too late to wax it. If there is no door suction, pay attention to prevent the handle from hitting the wall and being damaged.
48.Paco floor is very good. I like it. The only thing to remind is that it may be better to talk about the price directly with the boss than with the salesperson.
49. matte paint is just more beautiful than highlights.
50. If you redecorate, you will choose the finished putty instead of talcum powder. 50. If you redecorate, you will choose the finished putty instead of talcum powder.
5 1. The installation of leakage protector and air switch junction box cannot be omitted, and it should be placed indoors, not outdoors. I wanted to save money by using the old junction box outside the door. The electrician suggested putting it indoors for a new one, but now I think his suggestion is very valuable.
52. Leakage protectors and air switches should be famous brands. I used "Mei Lan Ri Lan". It's easy to buy the real thing. Just make a phone call to check the telephone number of Meilan Rilan headquarters, and then make a phone call to ask the telephone number of the local branch.
53. The basin under the stage is more exquisite, beautiful and easy to clean than the basin on the stage. Pay attention to the faucet under the platform. Considering the thickness of the basin edge, the faucet mouth should be longer.
54. The top corner of the wall is beautiful, without any decoration, but when looking for a painter, you should clearly ask the painter in advance. The top corner line helps to straighten the top corner line.
55. It is very important to treat the surface of the cement surface of the wire trough before putty is approved, and it is more appropriate to treat the weak surface with a cleaning ball.
Gypsum is suitable for filling big holes in the wall. Of course, if the hole is too big, cement is needed.
57. Be sure to protect the paint on the back of frosted glass, which is difficult to clean!
58. The faucet of the vegetable basin must be turned on and off with the back of your hand. It is not easy to keep clean with your fingers, and it is difficult to turn with oil on your hands.
59. The price of luxury automatic clothes hangers is too high. After comparison, it is found that some unknown brands are better than the first-line brands in structural design, but their prices are much lower.
60. Consider using a metal socket installed on the ground. This kind of socket 100 yuan, but it is very convenient. Usually flush with the ground, you can pop up when you step on it. Suitable for living room. Or installed under the dining room table, used to insert hot pot (to prevent hanging wires when walking back and forth)
6 1. Storage room. TX mentioned it, but I didn't make a cupboard door, which looks not very beautiful, and the cupboard where clothes are put is also easy to get dirty.
62. The starting frame of the bed (is that what it is called? I bought a cloth bed from a professional bed company, and I spent 350 yuan to add this thing. When you pull the handle at the end of the bed, the bed board will turn up, exposing the storage space below. Great!
63. Unpractical double-knife towel rack! At present, as with single pole use, towels are basically not hung on the inner pole.
64. I don't think the trash can in the cupboard is practical enough. It's better to put it outside. In addition, do not install door trash cans and countertop trash cans. Opening the cupboard door in summer will stink. You'd better put the trash can outside.
65. The small cupboard near the dining table is nice, and it is convenient to put something.
66. Personally, the performance requirements of mop bucket are not high. You can build one by yourself, laying tiles or mosaics to match the surrounding environment, which is both beautiful and economical.
67. The bathroom can be hung with hooks.
68. The bathroom is designed with a small cupboard for clothes, so you don't have to worry about forgetting to take clean clothes when taking a shower.
69. The belt drying of washing machine is seriously unrealistic, except for the only yellow mildew day in a year. Thick clothes and bath towels are still wet, just let the sun sterilize them. I'm overdrawn and need to deposit some money.
70. I made a laundry pool in the laundry room to wash some things by hand. I thought I used it less, so I bought a cheap terry faucet. I didn't expect this washbasin to be so convenient that it became the most commonly used washroom in my home. What rags, socks and floor towels are all washed inside, and even hand washing is mostly there.
7 1 .. optical tape is really not practical. It hasn't been opened since the renovation. The guests came, just showing off the spotlight. I forgot to install this thing myself. I wanted to have a romantic party, but now there are not many opportunities to turn on the spotlights.
72. The biggest lesson is that the simpler the decoration, the better, less pollution, less money and peace of mind.
73. Practical things: ① A reasonably designed storage room. (2) The sink on the north balcony. It is different from the washbasin in the bathroom and the bucket for washing vegetables and dishes in the kitchen. (3) You can pull the faucet to wash your hair in the bathroom. Never wash your hair in the basin.
The first is to go through the admission procedures: generally speaking, the original and copy of the ID card of the person in charge of the decoration team are needed to go through the admission procedures.
Original and photocopy of owner's ID card, business license of decoration company and construction permit of decoration company.
There is also a decoration deposit. Of course, you need to specifically ask your management office to handle it.
Next is knocking on the wall: after knocking on the wall, the garbage is cleared, and the clay figurine is going to enter the field. The knocking area can be calculated according to the floor plan of the house, which has all kinds of detailed data of your house. Remember to knock on the wall first, and you should know that knocking on the wall is calculated by area.
Masons are mainly responsible for building walls, plastering, repairing, tiling, waterproofing, leveling the ground and installing floor drains. Cement mortar is used for wall building and plastering, and the difference is only in different proportions. Building walls and plastering are the preliminary work of plasterers. After these two items are finished, the plasterer's union will first measure the actual area of the building wall and plastering, and then he will re-measure these dimensions with the owner. In addition, it is best to stick the tiles alone. If it is done by two people, the effect may be different because of different styles. It is best to use joint filler for joint filling of ceramic tiles. The white cement in my house has turned yellow in some places. Masons should pay attention: river sand should be used for decoration.
After the wall is built in Plaster workers, before plastering, the plumber enters the site and carries out hydropower transformation at the same time. The main work of hydropower transformation includes hydropower positioning, slotting, pipe burying and threading. Although slotting is not important, it indirectly affects the quality of pipe burying and threading. The first step of hydropower transformation is hydropower positioning, which is to determine the position of switch socket and waterway interface in the whole house according to your needs. The plumber should draw the line between the outlet pipe and the electric wire on the wall according to the faucet position of the switch socket, that is, arrange the lines well. Remember to ask your decoration team for the water and electricity diagram, and let the plumber tell you clearly the route direction according to the diagram. Don't be afraid of trouble, the plumber will certainly meet your requirements. If you don't sign after the hydropower transformation, the plumber won't want to take the money of the decoration team leader.
After hydropower positioning, the next step is to make a trough. The groove made by a good beautician is basically a straight line, and the edge of the groove
Basically no hair teeth. Note that before slotting, be sure to ask the plumber to mark all the water and electricity trends on the wall, and remember to compare them with the water and electricity diagram to see if they are consistent.
There are several points to be noted about hydropower transformation: 1. It is best to indicate the brand of wire used in circuit transformation in the contract. 2, the switch of the whole house should be basically in the same horizontal position. 3. The sockets in the whole house should be in the same horizontal position as far as possible.
Air conditioners, refrigerators and other special sockets and exceptions with special requirements. 4. The color of phase line and zero line in circuit transformation should be one in each room.
Therefore, if possible, it is best to indicate the colors of live wire, zero wire and control wire in the contract, and the protective wire is yellow-green. 5. It is best to use 3 wires with more than 4.0 strands for socket wires (including air-conditioned refrigerators) and 2 wires with more than 2.5 strands for lighting wires. 6, the bottom box is buried, if possible, it is best to buy the bottom box yourself, please report the installation fee to the decoration team. 7. As for audio cable, if you are not a professional enthusiast, it is best not to install audio cable: the housing area in Shenzhen is basically around 100 square meter, and the living room area is generally not very large. Ordinary people really don't need to install sound effects in such an area. Air traffic control is also silver.
I think it is necessary to say something about waterway reconstruction: the problem of frozen water comes from the weather in Shenzhen.
Say, even the washbasin and kitchen sink need boiling water? If you need hot water, just turn on the water heater. Just like many mobile phones now have the function of surfing the Internet, how many of us use mobile phones to surf the Internet? But we really need to spend a lot of money on mobile phones with Internet access. When I got the statement, I could only sigh that it was so easy to make money without spending money!
Finally, it should be noted that it is best to indicate in the contract that carpenters must enter the site after the completion of hydropower transformation. The advantage of this is that you don't have to pay attention to two things at the same time. Hydropower transformation is a very important expenditure in decoration, and it is also a large part of the profit of decoration company. Moreover, the hydropower transformation is very hidden. If carpenters enter the site at the same time, it will distract you from the hydropower transformation. When the waterway is rebuilt, pay attention to the cleanliness of the surrounding area. When signing a waterway reconstruction contract, it is best to indicate the materials used for waterway reconstruction. In addition, attention should be paid to the size of the original sewer in waterway reconstruction, and the pipes connected with the original sewer in the house should be matched with the original sewer.
In the circuit transformation, attention should be paid to where the lamps in the whole house are installed in advance to determine the position of the switch socket, and at the same time, attention should be paid to the different prices of newly buried wires and replaced wires. It is best to buy a wireless doorbell when buying a doorbell. Main work of hydropower transformation
10 1. Any increase or decrease in the construction process must be clearly marked and then written in black and white.
102. Check whether there are necessary construction protection measures, such as wrapping the entrance door with pearl cotton and properly protecting the paved windowsill and ground.
103. Communicate with the construction personnel as much as possible to determine whether he understands your intention. Put yourself in the position of respecting the works of every master, respect him, and make people feel their importance. Is it more responsible to work like this? Isn't there an old saying that "people don't doubt"? But if you are dealing with a treacherous and cunning bully, you should argue it over and over again. ), especially some marginal projects, need the cooperation of several jobs, and the responsible workers coordinate with each other to do their jobs well, otherwise everyone will kick the ball back and forth and pass the buck to each other. Like my mason, he helped me solve some carpentry problems and the electrician solved some masons' problems. Because every master has different experience, as long as he is willing to help you find a way.
104. It is best not to fix the furniture, because some layouts may not change. If you must do it, you must pay attention to the quality, otherwise there will be endless troubles.
105. Be careful when changing water pipes. First, it costs money; Secondly, if the ceiling is not suspended, the water pipe must be connected from under the floor. If there is something wrong with the water pipe, you are in big trouble.
Also, if there is a socket in or under the shoe cabinet, you can use the shoe dryer. Now I regret not having this thread.
107. The bathroom should be divided into dry and wet areas as far as possible. If the area is small, it is good to use a cylindrical basin (glass basin is particularly dirty, lazy people should use it with caution); It is best to set up a small waterproof cabinet to store sundries, which will definitely not look good outside.
108. polyester is better than nitro when wood is painted with smooth white paint (this is what experienced painters say).
109. The cabinets must be carefully selected, and the quality of several cabinets should be compared, so it is good to be firm. Because this item is worth thousands of dollars now, and it is related to the cooker and sink, so it is better not to be greedy and cheap. But it is best not to make a trash can on the table or in the cabinet; Also, if the funds are limited, you can save the expensive food basket, seasoning basket and rice barrel of general cabinet companies.
1 10. The wardrobe should be more than less, and the big one is smaller than the small one. Women should remember! Hanging space should be able to put down the longest skirt.
1 1 1. Things that are not easy to carry, such as glass or mirrors, are best bought nearby, or the mode of transportation is decided first.
1 12. Curtains should be made after all furniture and appliances enter the site to match the overall style and color. But the track can be installed before cleaning.
1 13. It is best to change the gas pipe before tiling, otherwise the wall may be damaged. It's best to let the gas company draw a picture or mark it on the wall, because the cabinet company needs to open holes in the cabinet as required.
1 14. The installation time of cabinets is long, ranging from 4 to 5 hours to 2 days, so be prepared psychologically. When installing, you can check whether the material used is the material you ordered (the cabinet material can be seen through the hinge hole). Clean the kitchen before installing the cupboard, because once the cupboard is installed, there is no way to clean those dead corners.
1 15. When installing furniture, it is best to look from the side, especially when there are several holes in the shelf of the wardrobe. I didn't look at it at that time, but as a result, the shelf spacing was too small to pull the clothes, so I have to adjust them later.
1 16. Considering the pollution of formaldehyde to the environment, green plants such as chlorophytum can be placed indoors, and the cupboard doors of furniture are all opened to emit odor, or you can buy something specially designed to eliminate odor to spray.
1 17. Install gas alarm and make an appointment for gas ignition.
1 18. Time for painting wood: it is best to wait until the floor tiles or wooden floors are laid indoors. If you must brush, you'd better clean the room. There is no floor tile, no wood floor and a lot of dust in the room. If you brush wood paint at this time, dust can easily attach to the surface of wood products that have been painted with wood paint, and it feels prickly. Although this situation can be solved by polishing with more advanced sandpaper and brushing again, the feel and overall effect of the brush will be a little warped. Brush the floor tiles after the room is paved. At that time, the dust content in the air was much less than before, and there was basically no dust attached to the surface of wood products after painting wood. The reason for saying this is because Xiao Wu's home is decorated in this way. Now I post my own plan sample table as follows for your reference: Take the data in the table as an example.
It is convenient to use this list as a purchasing plan. Before construction, the corresponding projects can be reclassified and merged according to the type of work, and divided into
Masons, carpenters, utilities, paints, etc. Be re-listed. You can also add a column of "Construction Requirements" to the right of the table. Such as (three batches and three brushes of wall latex paint; Leaf Wei board for shoe cabinet, coated with polyurethane varnish, etc.
127. For the rear speakers of home theater, it is very important that the audio cable should be embedded under the living room!
128. The balcony is equipped with a sink and embedded with water pipes for decoration. The balcony sink is very important, such as watering flowers and washing hands.
129. If the bathroom and kitchen need background music, audio cables should be embedded before decoration.
130. There must be sockets on both sides of the balcony, and lanterns should be hung to get electricity during the New Year.
13 1. The light switch at the entrance is suggested to be inductive. Go home in the dark so as not to be kept in the dark.
132. Description of foundation engineering construction
1, hydropower transformation
A. Before the construction team enters the site for construction, the water pipe must be subjected to "pressure-down" test (10 kg water pressure15min test). If the "pressure gauge pointer" has not changed, the water exchange pipe is safe; Otherwise, it is not allowed to replace the water pipe. It is necessary to notify the management office first and let it overhaul until the "suppression" is normal. ) and "circuit" test (test with "bulb with socket", just light the "bulb")
B. Trenching cannot destroy the bearing wall and the cast-in-place part of the ground, but it can knock off the floating layer. If it is necessary to install a "wire box" on the load-bearing wall, it is not necessary to destroy the internal steel structure.
C before burying the catheter, the catheter should be treated against termites. The connection between conduits shall be direct connection or elbow connection. A cup-shaped comb should be installed at the joint between the conduit and the bottom box, and all walls must form a 90-degree angle with the grounding circuit. If the original line needs to be rebuilt, it cannot be connected by "straight" or "elbow", but it needs to be connected by "yellow wax pipe", and the "yellow wax pipe" enters the conduits at both ends not less than 10 cm.
D, it is best to use "3 branches" when the circuit needs to be buried in the wall, and "4 branches" can be used for ceiling wiring. There must be no "connector" in the catheter, which can be found in another "box", and the "conductor in the catheter" must not exceed 60% of the "pipe diameter".
E. The high-voltage "live wire" should be red, the "neutral wire" should be black, and the "ground wire" should be yellow or blue-yellow separation wire; "Telephone line" needs "four-core telephone line"; Network cable, audio cable and TV cable should be selected according to the actual situation.
F after the "water circuit" transformation is completed, the waterway needs to be pressed again. After pressing normally, seal the tank with cement mortar.
133. Waterproof material
A. After the "hydropower transformation" of the kitchen and bathroom is completed, the next process can be "waterproof".
B. "Waterproofing" has different construction methods according to different materials. Take "Shanghai Huili 9 1 1" as an example: the top floor of the bathroom is the best waterproof, the kitchen is generally waterproof 1 m high, the ground is waterproof twice, 30 cm away from the wall, and the door cover is made once.
C. After waterproofing is completed, conduct "water test" for 48 hours. After 48 hours, go to the next floor. If there are no wet marks on smallpox, it can pass, otherwise it is necessary to redo the waterproof layer The most easily leaking place is the "floor drain".
134. Tiles
A, the owner needs to identify the quality of ceramic tiles when selecting them. The method is as follows: first, look at whether the color is uniform and whether there are mottled holes and black spots; Secondly, it depends on whether its size is standard. Measure the length and width of tiles with a ruler. The measured size should be consistent with the ex-factory size of its trademark, and then the diagonal of its tile should be measured. If the diagonals are the same size, the tiles are positive. Next, it depends on the flatness of the tiles. The simplest and most effective way is to overlap two tiles of the same brand. If two tiles overlap and have obvious gaps or can rotate, the tiles are uneven. Finally, it depends on whether the tiles have color difference. The method is to take out several samples of the same type of tiles and compare them in a bright place. If there is no color difference, you can order it.
B, ceramic tile paste can't have the whole brick empty drum (local empty drum can't exceed 20% of the whole brick). If the whole brick is empty, it needs to be reworked. In general, for every 100 brick pasted, the wall brick is allowed to be hollowed out 1 brick, and the floor tile is allowed to be hollowed out with 2 bricks, but it must be reworked, and the rework of the main material (included in the loss) is caused by.
C, in general, the levelness of the floor tile is allowed to have an error of 2mm, the gap of the floor tile must be consistent, and the diagonal between bricks should be flat (an error of 0.5mm is allowed). Except the diagonal between bricks, kitchen and bathroom tiles should be flat, horizontal (allowable error 65438±0mm) and vertical (allowable error 2mm). Floor drains should be considered first for the floor tiles in bathrooms and balconies.
D, after the wall brick and floor tile are laid, use "caulking agent" or "white cement" for wet slurry caulking.
135. termite control
A, after the wall and trough garbage cleaning, a comprehensive termite prevention (i.e., spraying termites throughout the house).
B, all plates need to be treated against termites after entering the site (specifically for plates).
C, before laying the wooden floor, the ground where the wooden floor is laid shall be treated against termites.
D, spraying termite medicine is best to spray wet (that is, you can see clearly when it is wet)
136. A calculator is also designed. Now the calculator has the function of setting decimal multiples, and there will be different standards for operation. Therefore, it is necessary for us to carry a calculator with us. Nowadays, mobile phones also have computing functions, but the functions are not necessarily good.
137. I prepared two good neutral glass adhesives (1 transparent, 1 white) and recommended them to American General Company. B&Q has 49 pieces. It is needed when installing toilets, sinks, cabinets and security doors. Although general manufacturers will bring their own glass glue for installation, most of the glass glue they provide is of poor quality, and it is easy to change color or become moldy in the future.
138. Don't use shapeshifters in toilets unless absolutely necessary. This thing is easy to block the toilet water.
139. The aluminum gusset in the kitchen and the two pieces above the range hood must be installed after the range hood is installed. My home was installed in the early days, and then it was dismantled when the range hood was installed. Workers changed its shape, and seamless smallpox became joint smallpox.
140. If wooden doors are installed in the kitchen and bathroom, glass glue should be applied to the joint between the door frame and the ground immediately after installation for the sake of uniformity and beauty. My family didn't handle it in time, and the workers used water carelessly. A lot of water spilled on the ground and penetrated into the door frame, and the bottom was a little black (moldy).
14 1. The balcony must be tiled! The corner of the balcony should be paved in a circle, and the life balcony should be paved to the same height as the railing. The corner of the balcony and my balcony are not paved, so we need to prepare a bucket of exterior wall paint and refresh it regularly. ...
142. Be sure to ask the decoration master to provide detailed water and electricity drawings before sealing the wall.
143. If you plan to paint the wall in color, you should consider the problem of replacing the wires during the electrical transformation. My home has changed a lot of wires and air conditioning sockets. But in order to save money, we didn't change the whole line, but connected it. Whiteboards must be installed in all places wired in this way for future maintenance. Later, when the colorful wall paint was finished, I found out how dazzling these whiteboards were. I regret it ~ ~ ~
144. This is the lowest mistake I made. I took it for granted that the bed width of1.5m was1.5m, and I forgot the thickness beside the bed. And leave an accurate lamp holder on the wall behind the bedside table. As a result, the socket was blocked and could not be used.
145. Before construction, let the decoration team leader analyze how to deal with the wall, and it is necessary to shovel off all the original powder. Especially the students who are going to outsource the wall project to the coating company. My family was contracted to a paint company, and the painter didn't come to see it until the carpentry was finished. The original wall ash was really poor, so it was best to shovel it all off and re-approve it. But now that the carpentry has been finished, it is not easy to shovel the original ash. Finally, we had to paint the surface with a layer of 108 glue.
146. The added lines must be rewired. However, the wiring may branch from the nearest terminal. It is not allowed to add connectors to the original wires.
147. The control switch of air conditioner can only be at the power supply end. It is not allowed to add on the line.
148. When changing the position of telephone and network cable, you can take out the original cable and continue to use it. But if the construction is improper, there will be many hidden dangers. So it's best to change the line from the weak box in the room.
149. The workload of measuring circuit transformation is generally measured by three different wiring methods.
1, trenching and burying pipes (measured by the length of trunking, if there are multiple pipes in a trunking, it is calculated as half of the number of pipes. The other half is included in the overhead line).
2, overhead lines (only through the pipeline without slot), calculated according to the length of the pipeline.
3. Change the line as much as you want (tell the construction team not to throw away the changed line).
4, weak current transformation, calculated according to the first method. The difference is to pay attention to who bought the weak wire. Owners must deduct the price when buying wires.
150. How to fix the toilet on the ground with screws? And the joint between the base and the pipeline. What kind of seal is better inside and outside? The toilet is fixed with expansion screws. The inside of the joint between the base and the pipeline is sealed with special sealant for toilet. Cement slurry mixed with white cement and white glue. When buying a toilet, it is usually equipped with special sealant.