Current location - Trademark Inquiry Complete Network - Trademark registration - Safety construction agreement
Safety construction agreement
In today's social life, agreements are used more and more frequently, and signing agreements can solve disputes in real life. Want to write an agreement but don't know who to consult? The following are five safety construction agreements I have collected. Welcome to reading. I hope you will like them.

Safety Construction Agreement 1 Party A: Wuhan * * Building Decoration Engineering Co., Ltd.

Party B:

According to the policy of "safety first, prevention first", in order to care for and cherish the safety of construction workers and make "safety first, production must be safe" truly and effectively implemented, Party A and Party B hereby sign this safety agreement through consultation:

1. Before Party B enters the site for construction, it is necessary to conduct detailed safety inspection on the construction site to check whether the external scaffolding is safe and complete and whether the fasteners of the scaffolding are firm and loose. If it does not meet the requirements of safe construction, it must be reported to Party A and civil engineering, and it can only enter the site after rectification meets the requirements of safe construction.

2. Party A shall provide Party B with scaffolding and bamboo rafts for construction, but Party B shall be responsible for the quality inspection of bamboo rafts. Party B shall not use unqualified, aged and rotten bamboo rafts in this project, and shall bear the safety responsibility and all related economic losses caused by poor inspection of bamboo rafts.

3. Party B must wear safety helmet and safety belt (provided by Party B) during the construction, and bear the safety responsibility and all related economic losses caused by not wearing safety helmet and safety belt.

4. In the process of construction, Party B shall obey the safety supervision, inspection and management of the site owner, Party A and the supervision company, listen carefully to the reasonable suggestions and opinions put forward by all parties on Party B's safety measures, and promptly remedy and correct the operations that do not meet the safety requirements. Party B shall bear the safety responsibility and all economic losses for failing to comply with site safety management and construction according to safety operation regulations.

5. Party B shall be responsible for identifying the identity of the employed construction personnel, and shall not employ child laborers, criminals or personnel unsuitable for external wall construction. Employed construction workers are not allowed to bring their families and children into the construction site. All construction personnel are prohibited from drinking alcohol before operation, from frolicking at the construction site and during operation, and from using or moving mechanical equipment and signs unrelated to construction. Party B shall bear all consequences caused by the above-mentioned poor screening and inadequate supervision, and bear all related safety responsibilities and economic losses.

6. Party B and its construction personnel shall be responsible for accidents (incidents) that violate laws and regulations or Wuhan Regulations on Administrative Penalties for Public Security or occur outside the construction site, and have nothing to do with Party A. ..

Seven, this responsibility for safety construction once signed by both parties, which has legal effect.

Eight. This Safety Construction Responsibility Letter is made in duplicate, with each party holding one copy. For matters not covered, both parties may sign a supplementary agreement.

Party A (seal): Wuhan * * Building Decoration Engineering Co., Ltd. Representative of Party A (signature): Contact information:

Party B (seal): Contact information of Party B's representative (signature):

Date of signature: 20xx year month day.

In order to ensure the smooth progress of the company's equipment maintenance work in 20xx, maintain a good working order at the work site and the safety of maintenance and construction, Party A and Party B (the maintenance and construction outsourcing unit) signed this agreement on matters such as ensuring safe production and construction quality through consultation.

1. Party B shall earnestly implement the policy of "safety first, prevention first". Before the overhaul construction, the safety supervisor of Party B must give safety education to the overhaul construction personnel of the unit, improve the corresponding safety protection facilities, and take full responsibility for their own safety;

2. Party B's personnel involved in maintenance and construction must be familiar with the safety technical regulations of this system, this type of work and this position, and at the same time abide by the relevant safety system of Party A's unit and relevant national laws and regulations, and accept the supervision and management of Party A; Personnel who belong to special operations should have corresponding qualifications and hold valid operation certificates.

3. Party B's use of electricity, gas welding (cutting), blowtorch, electric drill, grinding wheel and other temporary operations that can produce flames, sparks and hot surfaces in flammable and explosive areas are all hot work, and it is necessary to apply for a hot work permit from Party A before construction can be started;

4. During the hot work, Party B must set up a guardian. The guardian is not allowed to leave the scene during the operation. If any abnormal situation is found, it shall immediately notify to stop the operation, contact relevant personnel to take measures in time, arrange to clean up the site in time after the operation, and conduct safety inspection with relevant personnel to confirm that there is no residual fire before leaving the site.

5. The temporary electricity consumption of Party B's construction site shall be managed by Party A, and the electrical equipment, tools and lines shall be maintained and managed by full-time electricians;

6. When Party B enters the equipment or container containing corrosive, asphyxiating, flammable, explosive and toxic substances, he must wear appropriate personal labor protection articles and anti-virus appliances, and Party B shall arrange a guardian with rescue ability to do the guardianship work. If any abnormality is found, stop the operation immediately, evacuate personnel quickly and report to Party A in time;

7. Party B's personnel who are not suitable for aerial work shall not engage in aerial work. Aerial work personnel must fasten their safety belts and helmets, and the tools, parts and materials they carry with them must be put into tool bags, and aerial work shall not be crossed;

8. If Party A's equipment and personal safety are damaged within the scope of work due to Party B's own reasons, Party B shall be responsible for all problems arising therefrom.

Party A: Party B:

Representative: representative:

20XX June 25th

Safety construction agreement 3 Party A: Henan Xinlianxin Chemical Fertilizer Co., Ltd.

Party B: Beijing Guohe Construction Group Co., Ltd.

Date: Year Month Day

Project Name: Henan Xinlianxin Fertilizer Co., Ltd. Raw Material Structure Adjustment Project Work Content: Coal Silo Project

According to the operation of the construction contract signed by Party A and Party B, and in accordance with the provisions of laws and regulations such as "People's Republic of China (PRC) Law on Work Safety" and "Construction Law", in order to ensure construction safety, prevent various construction accidents and clarify the responsibilities of both parties, this agreement is hereby signed through consultation.

I. Responsibility of Party A

1. Party A must review the qualifications and conditions of Party B, and the project construction can only be carried out after it is qualified. Confirm that the following conditions are met: holding business license, qualification certificate and safety production license issued by relevant departments; Holding the identity certificate or power of attorney of the legal representative; The configuration and certificates of relevant responsible persons, engineers and technicians and special operators meet the requirements of safe production.

2. Before starting work, Party A must make a comprehensive disclosure of safety technology and civilized construction to the project leader and engineering technicians of Party B.. , and should have a complete disclosure of information and disclosure records, signed by the disclosure personnel of both parties. Party B is also required to make a construction plan in advance and specify the "three measures" (organizational measures, safety measures and technical measures), which can only be started after being examined and qualified by Party A's project department and technical and safety departments.

3. During the commissioning stage of the new device or during the construction of the existing production device area, the relevant personnel of Party A must make a special disclosure to the relevant personnel of Party B on the dangerous sources of the chemical production system on the construction site, and ask Party B to fully identify the dangerous sources and unfavorable environmental factors on the construction site, formulate a special construction plan or special safety measures for the dangerous sources and environmental factors that need to be controlled, and supervise the implementation during the construction process after passing the examination.

4. Supervise Party B to do a good job in safety education, conduct a safety inspection on its employees before the project starts and every year, and establish safety training, safety meetings and safety inspection files.

5. Review the construction safety technical measures submitted by Party B, and assist Party B to prepare the construction safety technical measures when necessary.

6. Organize Party B to participate in safety inspection activities and regular meetings on safety work, and timely convey the documents, notices and meeting spirit of superiors on safety work.

7. Inspect Party B's construction site regularly and irregularly, and stop and correct the behaviors of Party B's personnel in violation of relevant safety production rules and regulations in production; If Party B violates relevant safety rules and regulations during construction, it shall be dealt with according to relevant punishment regulations of Party A, and a penalty notice shall be issued; Issue a "written rectification notice" for serious violations, and order them to stop work and rectify.

8. When Party B's construction personnel violate the relevant safety production rules and regulations, Party A's security department has the right to correct and stop it, and has the right to notify Party B and impose economic penalties until Party B stops working.

9. Party A shall be responsible for Party B's injury caused by Party A..

Two. Party B's responsibilities

1. Party B must formulate a construction plan for the construction project undertaken, and formulate "three major measures" (organizational, technical and safety measures) in combination with the project, and supervise the implementation after being reviewed by the competent engineering department, technical and safety departments of Party A. ..

2. Party B must have a safety management organization and a full-time security officer; There must be a complete safety production responsibility system, safety production management rules and regulations, including safety operation rules for each type of work, post responsibility system for safety production at all levels, regular safety inspection and safety education.

3. Party B must implement the national guidelines, policies, decrees and regulations on production safety; Abide by national and industrial management regulations and relevant construction management regulations for safe construction and civilized construction formulated by Party A, and abide by various rules and regulations on site.

4. Party B shall employ workers in accordance with the Labor Law of People's Republic of China (PRC) and other laws and regulations, and the employment contract is strictly prohibited.

Adult workers and personnel with occupational taboos carry out construction operations. All registered construction personnel shall not be replaced at will, and shall not be an impostor.

5. Before the project starts, Party B must organize all construction personnel to carry out safety education and safety examination, and only after passing the examination can they enter the site for construction. If it is necessary to change jobs, increase or transfer personnel, safety education and safety inspection must be carried out before taking up their posts and reported to Party A's safety supervisor for the record. Special operations personnel must hold a valid special operation certificate.

6. Party B must provide qualified labor protection articles and safety appliances for the construction personnel in accordance with relevant state regulations, and ensure the safety of construction tools and appliances. Its machinery, safety protection facilities and safety appliances must meet the needs of safe production.

7. Before the project starts, the safety technical disclosure must be made to the construction personnel, so that all construction personnel can master the engineering characteristics and construction safety measures.

8. Before starting work, the construction machinery, instruments and safety protection facilities shall be inspected to ensure compliance with safety regulations, and the inspection period shall not exceed. Party B's construction personnel shall carefully inspect the construction area, working environment, operating facilities, equipment and tools. Stop the construction immediately if any hidden danger is found, and continue the construction after the rectification is implemented. All kinds of equipment and construction tools used in the construction should meet the construction requirements. Assign special personnel to inspect the construction site every day before starting work, and rectify in time if any hidden danger is found. Party B shall not dismantle or change all kinds of safety protection facilities, fences, safety signs, warning signs and grounding wires without authorization.

9. In the process of construction, Party B must fully identify the hazards and unfavorable environmental factors that need to be controlled in each construction stage, each part and each site according to the characteristics and conditions of the construction project, and formulate effective preventive measures. If Party A needs help to solve the problem, it must submit a written application.

10. When carrying out construction work, Party B must prepare safety construction measures in advance and fill in the safety construction working ticket; Must strictly implement the operation ticket, working ticket, hot work permit, ground-breaking permit, tower and tank entry and other related ticket systems, and may not start work without a license or approval.

1 1. Party B shall consciously accept the supervision and guidance of Party A's security department. The safety rectification notice put forward by the safety supervision department of Party A must be rectified in time. In case of personal accident or unsafe situation endangering production operation during construction, it must be reported to the safety supervision department of Party A immediately.

12. Party B has the right to refuse Party A's illegal command. If Party A is found to have forced construction in violation of regulations, it shall actively appeal to Party A's superior competent department or administrative competent department, and Party A shall be responsible for the economic losses caused thereby.

13. Subcontracting of the project undertaken by Party B is strictly prohibited. If subcontracting is required for non-principal projects, it must be reported to the competent project department and security department of Party A for approval. Party B must manage and supervise its safety.

14. Party B shall be responsible for the safety technical measures taken in the work area, the status of the work team and the safety responsibilities during the construction period.

15. If all accidents or losses are caused to the third party due to improper safety measures of Party B, violation of relevant safety operation rules and regulations, and violation of safety matters listed in this agreement, Party B shall bear the economic losses and legal responsibilities caused thereby. And is responsible for reporting to the competent government departments for investigation and handling.

16. When Party B uses Party A's electrical and other related equipment, it must apply to the relevant functional management department of Party A, and it can only be used after approval. Do not connect the power supply and use Party A's equipment and facilities without authorization. Party A is responsible for confirming that Party B's electricity consumption on the construction site is safe and reliable and meets the requirements before putting it into use.

17. Party B shall carry out safe and civilized construction, and the raw materials, goods, tools and equipment required in the construction shall be neatly stacked according to the requirements of the factory, and shall not litter, misplace, block roads or affect fire control facilities.

Article 4 of the Safety Construction Agreement: The construction unit (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

Project name:

Project location:

In order to effectively strengthen the safety production management on the construction site, Party A and Party B shall strictly abide by the rights, responsibilities and obligations stipulated in this agreement according to the Law of People's Republic of China (PRC) on Safety in Production, the Law of People's Republic of China (PRC) on Construction, the Contract Law of People's Republic of China (PRC) and the Regulations on the Safety Production of Construction Projects, the Technical Specification for the Safety of Temporary Electricity Use on the Construction Site (JGJ46-88) and the Safety Inspection Standard for Construction (jgj 46-88) of the Ministry of Construction.

I. Rights, responsibilities and obligations of Party A:

1. Implement national laws and regulations on safe production and civilized construction on the construction site, conduct comprehensive safety production management and supervision and inspection on the construction site and area of Party B, and conduct safety inspection and guidance on temporary electricity consumption on the construction site.

2. Timely correct the illegal command and operation of Party B's construction personnel, and investigate and deal with them in accordance with relevant regulations. For the hidden dangers of major safety accidents in the construction area of Party B, a hidden danger notice shall be issued.

3. Ask Party B to provide emergency rescue plan for production safety accidents on the construction site.

4. Establish and improve various safety production management systems on the construction site.

5. Guide Party B's safety production training, use of labor protection articles and hazard prediction, and supervise the implementation.

6. Actively assist the safety production requirements put forward by Party B. ..

7. When supplying power to Party B, the handover and acceptance formalities shall be handled with Party B. ..

8. Supervise and inspect Party B's temporary electricity equipment and facilities according to relevant temporary electricity consumption standards. If there are hidden dangers in Party B's temporary electricity use, Party B must be instructed to rectify. And supervise the implementation of rectification.

9. Archive the list of Party B's special operators, copies of operation certificates and training records.

Two. Rights, responsibilities and obligations of Party B:

1. Abide by the national laws, regulations and management systems related to production safety on the construction site, and establish and improve the responsibility system and management system for production safety. Strictly implement the national technical specifications and safety operation procedures for temporary electricity use and mechanical equipment use in the construction site, and take overall management responsibility for temporary electricity use in the construction area under its jurisdiction.

2. Obey the safety production management of Party A. ..

3. Party B must take out personal accident insurance for the construction personnel.

4. When Party B causes production safety accidents and causes casualties, Party B shall bear the accident responsibility and economic responsibility.

5, without safety education and training and undocumented personnel, shall not work at his post.

Three. Agreement content:

(1) climbing frame requirements

1. Scaffolds and safety nets for construction must be set up by professionals, and they can only be put into use after the project manager (site manager) organizes relevant personnel in the technical and safety departments to pass the inspection. Should be checked item by item according to the category, and there are acceptance records.

2. When working high above the ground, it is forbidden to exchange. When working horizontally, there must be a certain distance between stations. Operators must be equipped with corresponding labor protection articles, such as safety helmet, safety belt, protective glasses, protective gloves and protective work clothes. , they should be used correctly. Relevant safety signs should be set around the construction site, and special personnel should patrol.

3. Personnel entering the construction site must wear safety helmets. Anyone who works at a height of more than 2m must use the safety belt correctly, and the safety belt should be hung high and used low.

4. Before the construction of the project, in addition to the written safety technical disclosure by the engineering and technical personnel to the construction personnel and the signing formalities, each construction team leader must make the team disclosure to the construction personnel and perform the signing formalities.

5. Special engineering construction projects such as; Electrical, flammable and explosive containers and pipelines must be operated by professionals with valid certificates and employment certificates.

6. To dismantle the construction site, it is necessary to set up temporary emergency personnel and medicines or set up a temporary ambulance station.

7. It is forbidden to drink alcohol before and during work, and it is forbidden to wear high heels, hard shoes and slippers. You should wear non-slip shoes.

8. When entering the construction site, you must obey the command of leaders and security personnel, observe labor discipline, strictly observe your post, do not string posts, and concentrate on your work.

9. It is strictly prohibited to dismantle or damage protective railings, tie rods, safety nets, springboard, scaffolding, support and other protective facilities at will.

10. Pay attention to safety when handling and installing tiles to prevent tiles from falling and hurting people.

1 1. Pay attention to operation safety and construction electricity when processing various materials, and don't connect wires casually.

12. All surrounding holes in the construction site must have safety protection that meets the requirements of safety specifications. If it is removed due to the requirements of the construction site, it will be restored immediately after the operation.

13. It is forbidden to have probe plates and springboard on scaffolding. Scaffolding should be covered with scaffolding, and materials such as mortar, bricks and tiles are prohibited from piling up on scaffolding.

14. In case of emergency, you are not allowed to pass under the hoisted or transported objects, run or jump from a height; Do not walk on unprotected buildings such as external walls and overhanging slabs; It is not allowed to operate on unstable objects such as trolleys; Do not climb the boom, rope, scaffolding, tic-tac-toe, hanging plate and hanging basket, and the lifting objects attached when transporting materials; It is forbidden to carry people on the derrick basket.

15. During the operation, objects, broken bricks, ashes, etc. Do not throw it down, and set a chute or trash can when cleaning materials; Hand-held tools and scattered materials should be kept in the tool bag at any time.

16. Those under 18 who suffer from heart disease, anemia, hypertension, hypotension, epilepsy and other diseases that are not suitable for aerial work are strictly prohibited from engaging in external wall construction.

17. In case of thunderstorm, strong wind and other weather, the external wall construction should be suspended.

18. Hand-held electric tools should be inspected before use, and can be used only after the no-load test run is normal and qualified. When moving the working point, cut off the power supply, and hand-held power tools are strictly prohibited in wet places.

19. Before operation, the safety devices of mechanical equipment must be carefully checked. When adjusting the machine or replacing tools, the power supply should be cut off first, and the mechanic should do it.

(2) Power consumption requirements

1. The door of the distribution box should have the name, purpose, shunt, mark and internal system wiring diagram to prevent misoperation.

2. All power distribution devices should be locked, and a special person should be responsible for unlocking and locking.

3. When using electricity, electricians and electricity users must wear insulating protective articles and use insulating tools according to regulations.

4. When the construction site is shut down after work, the power distribution devices that are not used after work must be cut off and locked. When the work in the shift stops for more than 1 hour, the relevant power switch box should be cut off and locked, and the power distribution devices that are not used for the time being should also be cut off and locked.

5. The electrical configuration and wiring in the distribution box and switch box shall not be changed at will, and other electrical equipment shall not be hung at will.

6. The leakage protector of power distribution device should be tried with the test button every time it is used, and it can only be used after the test is normal.

7. The protective grounding wire of electrical equipment should be grounded in parallel, and it is forbidden to connect in series or connect to zero.

8. Electrical equipment in use should be kept in good working condition, and it is forbidden to run with faults.

9. The site temporary electricity and lighting must be approved by the project manager, and operated by professional electricians according to the requirements of JGJ46-88 Technical Specification for Temporary Electricity Safety on Construction Site.

10. All electrical equipment on site must be connected to the patch panel with plugs. It is forbidden to directly insert the wire ends into the patch panel.

(3) the use of electric welding machine requirements

1. The operator shall have a work license, and it is forbidden to operate without a license.

2. All AC and DC metal casings must be protected by grounding or zero connection. The welding metal and the structure itself are grounded.

3. When the secondary welding handle wire and grounding wire of electric welding machine need to be extended, the overlapping area should be guaranteed, and the contact should be wrapped with insulating tape, and the grounding wire should be good without skin crack.

4. In case of rain, snow, fog or gale of magnitude 6 or above, which affects the construction safety, outdoor welding shall be stopped. After rain and snow, the accumulated water and snow on the construction site should be removed before welding.

5. When welding, the operator should wear all protective equipment.

6. All kinds of electrical equipment and lighting equipment used in the open air must have waterproof and rainproof facilities, and the protective covers of all kinds of equipment must be complete.

7 The electrical equipment without chrome brand shall not be connected to the power supply at will, and all kinds of electrical equipment shall have complete chrome brand.

(4) Requirements for hot work

1 When entering the construction site, the constructors shall be educated on fire control and hot work.

Smoking and hot work at will are strictly prohibited on the construction site. If hot work is needed, an application must be made to the project manager, and it can only be used after the project manager agrees to sign it.

Flammable articles used in construction, such as gasoline and steam bottles, must be set in special temporary storage warehouses, equipped with fire extinguishers and sandbags. And managed by a special person.

4. The management system of "three clean-ups and five good" should be implemented in the construction site, especially the shavings, sawdust and wood scraps should be cleaned up after work every day, and all kinds of materials should be packed in piles and neatly stacked.

5 Before electric welding and gas welding, the task must be clearly defined, the working environment should be carefully understood, the fire danger area should be determined, and obvious signs should be set. All combustible substances in the dangerous area must be removed, and reliable protective measures should be taken for combustible substances that cannot be removed.

6 Welders must hold relevant certificates, and those without certificates cannot operate.

7. Welding and cutting operations within the scope of Class I, II and III fire protection shall not be carried out without going through the formalities for examination and approval of hot work.

8. When the wind is above level 5, it is forbidden to use electric welding.

(5) Outdoor hanging basket construction requirements

1. Before construction, the welding points, bars, wire ropes and cranes of the hanging basket must be inspected for damage and corrosion. If yes, it must be derusted, repaired and replaced before use.

2. The construction personnel on the shelf must wear work clothes and non-slip shoes, wear safety belts correctly, and be firmly connected with the steel wire rope.

3. The construction personnel in the hanging basket can only keep three people, carrying no more than 2 barrels of paint and coating, and fixing them on the hanging basket with strong ropes or hooks.

4. Operators entering the construction site must be trained by skilled workers, and coolies or untrained personnel are forbidden to operate on the hanging basket.

5. When hanging blue moves up and down, two people must cooperate.

6. The bottom of the hanging basket must be made of bamboo plywood for building and tied firmly with strong ropes.

7. There must be a protective fence and skirting board around the hanging basket, and the basket body should be tightly closed with a safety net.

8. Scattered tools such as steel trowels and grey knives placed in the basket must be packed in bags and fixed on the basket.

(6) Personal safety protection measures

1 members of the installation team must wear safety helmets when entering the construction site. To select qualified products, there are batch verification and ex-factory inspection certificates from the inspection department. Before the construction personnel enter the site, they must fasten the lower forehead belt to prevent the phenomenon of falling from a height and falling off their hats.

You must fasten your seat belt when working at height. Seat belts should be made of qualified products, with the trademark and certificate of manufacturer's permanent words. Check whether the safety belt is in good condition before entering the site. Seat belts must be hung in a solid place.

Construction personnel should prepare tool bags and tool boxes to prevent tools from falling. Put the tools into the tool bag and toolbox after use. The horizontal distance between the construction materials and the hole and the ground is greater than1m. After work, do it after work.

(7) Safety management

1 set up a leading group for production safety, which shall be the responsibility of the project manager, and set up full-time security officers to check the production safety of the project, and strictly implement the provisions of the production safety system and safety operation procedures.

2 when compiling the construction organization design scheme and technical measures, targeted safety measures must be taken.

3 to do a good job of safety disclosure of each division and sub-division, and the construction team will hold a briefing every day to provide targeted safety education for workers. New workers are not allowed to work without three-level safety education.

4. Ensure and improve various safety publicity measures, and set up safety production billboards in eye-catching positions for on-site warning.

(eight) civilized construction requirements

1. Enter the construction site, and it is forbidden to drink, make trouble and fight, engage in various gambling and other illegal acts. Those who are light will be cleared, and those who are heavy will be sent to law enforcement agencies for legal treatment.

2. Dormitory rest time, in addition to working overtime at night, you must ensure that you rest after 10 at night to ensure your mental state the next day.

3. It is strictly prohibited to work in spite of illness. Once found, the shift change or rest must be arranged by the construction team leader to ensure the personal safety of all construction personnel.

4. It is forbidden to urinate anywhere on the construction site.

5. It is strictly forbidden for field personnel to steal tools and materials. Once found, they must clean up the scene and impose certain financial penalties on the team leader according to the circumstances.

6. It is forbidden to block all unidentified non-working personnel on the construction site, and children are not allowed to enter.

Construction site.

7. Enter the construction site shall not violate all rules and regulations, if there is any violation, depending on the seriousness of the team leader and violators will be punished.

(9) Environmental requirements of the construction site

1. Set up 10 square meter brick-enclosed construction waste station and 5 square meter brick-enclosed domestic waste station at the construction site respectively, and regularly clean up the outbound construction waste.

2. When loading and unloading fine-grained materials on the construction site, effective measures such as covering must be taken to store the materials in the warehouse, and cars entering and leaving the factory should ensure that the muck is not scattered in the factory.

3. The construction site should set up a closed oil depot and paint depot, which must be waterproof and have no leakage. Flammable and explosive dangerous chemicals such as oil and paint shall not be placed outdoors.

4. When all kinds of machinery are used in the construction site, effective noise reduction measures must be taken to reduce the noise frequency, and closed measures should be taken for machinery with strong noise.

5. In places prone to dust, construction workers must wear protective masks and take effective dust removal and dust reduction measures to ensure the health of construction workers.

(10) engineering quality requirements

The project quality shall conform to the current national construction acceptance specifications (including national or industrial safety technical standards) and the safety technical requirements and needs of Party A's project, and must reach the excellent grade of professional quality inspection and evaluation. Due to Party B's blind recklessness, pursuit of speed and non-compliance with operating rules, the project quality does not meet the design safety technical requirements and the quality is unqualified. Party A may require Party B to stop work or rework, and the cost of rework shall be borne by Party B, and all the material waste and economic losses caused thereby shall be compensated by Party B, and the construction period shall not be postponed.

This agreement has the same term as the construction contract signed by both parties. This agreement is made in duplicate, each party holds one copy, and this agreement is signed at the same time as the construction contract. After the expiration of the construction contract, this agreement shall be terminated at the same time.

Party A's unit (seal) and Party B's unit (seal)

Representative: Project leader:

date month year