The term "construction projects" as mentioned in these Measures includes housing and its ancillary facilities construction projects and municipal infrastructure construction projects.
Where there are other provisions in laws and regulations on civilized construction management of construction projects, such provisions shall prevail. Article 3 The municipal construction administrative department shall be responsible for coordinating the supervision and management of civilized construction of construction projects in the whole city.
Administrative departments such as municipal construction, municipal utilities, landscaping, city appearance and environment, and urban management administrative law enforcement (hereinafter referred to as civilized construction administrative departments) are responsible for the supervision and management of civilized construction of construction projects in accordance with the division of responsibilities.
The administrative departments in charge of civilized construction in each district shall be responsible for the supervision and management of civilized construction of construction projects within their respective administrative areas in accordance with the division of responsibilities. Article 4 Construction projects shall take measures in accordance with regulations to ensure the working environment, the quality of city appearance and environmental sanitation and the health and safety of personnel. Article 5 The construction unit shall be responsible for civilized construction. In the construction project under general contracting, the general contractor shall take overall responsibility for civilized construction, and the subcontractors shall obey the management of the general contractor and be responsible to the general contractor. Article 6 Construction units shall organize the preparation and implementation of civilized construction plans, establish safety, fire prevention, public security and sanitation systems, implement the responsibility system for civilized construction, and implement civilized construction target management. Seventh construction units shall carry out construction in the approved construction site. If it is necessary to expand the construction site or temporarily occupy roads, green spaces and other municipal infrastructure, it shall go through the examination and approval procedures with the relevant administrative departments according to law. Article 8 The construction unit shall set up construction signs and the general plan of the construction site in an eye-catching position on the construction site, as well as system cards for safety production, fire protection, environmental protection and civilized construction.
Construction signs shall indicate the name of the construction project, the name of the construction unit, design unit, construction unit and project supervision unit, the name and contact number of the project manager, the commencement date and planned completion date, and the approval number of the construction permit.
Construction site management personnel should wear work cards. Ninth construction units should implement a closed enclosure on the construction site. Fences should be stable, safe, clean and beautiful, and meet the following requirements:
(a) using masonry or special-shaped plate, masonry enclosure should have coping and lighting;
(two) the height shall not be less than 1.8 meters, and the main roads in urban areas shall not be less than 2.5 meters;
(3) The gate shall be made of metal.
The enclosure at the construction site of municipal infrastructure construction project can be set continuously or in sections according to the progress of the project. Tenth construction scaffolding should be in accordance with the provisions of the use of fully enclosed safety nets to prevent falling objects and dust. The safety net should be kept clean. Article 11 The ground and roads on the construction site shall be hardened and kept flat and solid.
The construction unit shall designate a special person to clean the construction site. Twelfth main entrances and exits of the construction site should be equipped with vehicle washing facilities. Among them, if the transportation volume of earthwork, muck and construction waste is more than 500 square meters, a vehicle washing platform shall be set up; If the transportation volume of earthwork, muck and construction waste is less than 500 cubic meters, simple vehicle washing facilities shall be set up.
Drainage ditches and sedimentation tanks should be set up at the construction site, and the construction sewage can be discharged into urban drainage facilities or rivers after sedimentation. Thirteenth construction units shall, before the completion of the main two-story structure of the construction project, complete the backfill of the foundation pit as required. Fourteenth construction site building materials, building components, tools and other materials should be stored in the area designated by the general construction plan, hanging names, varieties, specifications and other signs, and shall not occupy the site roads and safety protection facilities, and shall not be mixed. Fifteenth construction site stacking sand, stone and other bulk materials, should be set up a fence with a height of not less than 50 cm.
The residual soil produced on the construction site shall be stacked in a stacking pool with a height of not less than 30 cm, and the stacking place shall not be close to the enclosure, and the stacking height shall not exceed 2 meters, and covering, curing or greening measures shall be taken. Sixteenth construction site waste soil and construction waste should be cleaned up and transported in time in accordance with the regulations, and closed transport vehicles or covering measures should be adopted. It is forbidden to burn construction and domestic garbage at the construction site. Seventeenth in the urban noise sensitive buildings concentrated area, it is forbidden to carry out noise-producing construction at night (from 22: 00 to 6: 00 the next morning) and at noon (from 12 to 14). If continuous operation is necessary due to special needs, it shall be reported to the administrative department of civilized construction and the administrative department of environmental protection for approval, and the nearby residents shall be announced. Eighteenth construction may cause the surrounding units and residents access obstacles or road traffic jams, the construction unit shall take effective measures in advance, and set up civilized public welfare slogans and warning signs. Article 19 The office area and living area of the construction site shall be set separately from the construction area, and a safe distance shall be kept. The office and living facilities shall be scientifically and reasonably laid out, in line with the relevant provisions of urban environment, sanitation, fire protection, safety and civilized construction management.
The construction unit shall not set up staff dormitory in the unfinished building.