Current location - Trademark Inquiry Complete Network - Trademark registration - 5 sample standard formats for letters of commitment
5 sample standard formats for letters of commitment

How to write a letter of commitment? Below is the written letter of commitment I brought to you, I hope it can help you!

Part 1: Written letter of commitment

Letter of Commitment

In order to maintain the order of the construction industry market and strengthen the daily management of construction industry enterprises

, our company solemnly commits to the following:

1. The personnel allocated to the project by our unit are consistent with the scale of the project in accordance with relevant laws and regulations, and they remain on duty.

2. During the construction activities in Feidong, our unit will resolutely stop any violations of laws, regulations, or violations of the relevant regulations of the Feidong County construction market.

3. During the fertilizer period, our unit will resolutely prevent the occurrence of complaints about migrant workers’ wage arrears and petitions.

4. Our company solemnly promises that if the above situation occurs in our project department and causes serious consequences, our company will bear all responsibilities.

Legal name of the promisee (official seal of the company):

Legal address of the promisee: No. 4, Building 3, Sanshan Street, Sanshan Town, Fuqing City

Promisor or authorized representative (Signature or official seal of the legal person)

Tel: 0551-4392470 Fax: 0551-4392470

April 28, 2012

Legal person’s power of attorney

This power of attorney declares: I, Wei Changgui, am the legal representative of Fujian Changhong Construction Engineering Co., Ltd., and I hereby authorize Guo Zijian of Fujian Changhong Construction Engineering Co., Ltd. to be the legal agent of our company to provide services to Anhui Kai Bidding, filing, construction, completion and warranty of No. 3 Factory Building of Yi Industrial and Trading Co., Ltd., signing the bid document in the name of the company, explaining the bid documents, negotiating, signing the contract and handling all matters related to it.

The agent does not have the right to sub-entrust and is hereby entrusted.

Agent: (Signature) Gender: Male Age: 47 ID number: 340123196607100338 Position: Manager Bidder: (Seal) Legal representative: (Signature or seal)

Authorization date: April 28, 2012

Part 2: Letter of Commitment of Testing Unit (New)

Attachment 8:

Hengyang City Construction Engineering Inspection Unit Project Leader

Letter of Commitment on Quality Inspection Responsibility

Project Name:

Name of Inspection Unit:

Hengyang City Housing and Urban-Rural Development Construction Bureau System

Quality Inspection Responsibilities of the Project Leader of the Inspection Unit

Letter of Commitment

I promise to conscientiously perform the following responsibilities during the quality inspection of this project, and Take responsibility for testing.

1. Undertake testing tasks strictly in accordance with the qualification level and business scope, and do not transfer the testing business; do not allow other units or individuals to undertake testing business in the name of the unit; sign a written entrustment contract with the project entrusting unit; seriously Prepare a testing plan, specify the quality requirements and implementation standards in the plan, and submit it to the engineering quality supervision agency for registration. 2. Select inspectors with corresponding qualifications to conduct project quality inspections in accordance with relevant national laws and regulations and mandatory standards for engineering construction, and promptly notify the project construction and management of any discovered violations of laws and regulations, violations of mandatory standards for engineering construction, and unqualified inspections. The supervision unit shall report to the project quality supervision agency.

3. The inspection report issued must have complete signature procedures and truly reflect the quality of the project. False reports will never be issued, and inspection data shall be collected and archived in a timely manner.

4. Witness the testing and sampling, be responsible for the source of the samples, be responsible for the testing results, and bear other legal liabilities arising therefrom.

Signature of the promisee:

Time: Year, month and day

Description: This letter of commitment is made in triplicate, one to be submitted to the project quality supervision agency for record and the other to After the project is completed, accepted, recorded and verified, it will be submitted together with the archives to the urban construction archives management department for archiving, and a copy will be kept in the respective responsible entities for future reference.

Authorization letter of legal representative

We hereby authorize comrades from our unit to serve as the project leader of the testing unit of the project, to conscientiously perform the corresponding duties of the project leader on behalf of our unit, and to monitor the source of samples and test results. Responsible.

Name of project leader: Gender

ID card number:

Name of professional qualification certificate:

Professional qualification certificate number:

p>

Authorized unit (seal): Legal representative (signature):

Issuance date: year, month, day

Remarks: The professional qualification certificate of the project leader is required. Copy of ID card; copy of legal representative’s ID card.

Part Three: Commitment Letter of Construction Unit

Commitment Letter of Lifetime Responsibility System for Project Quality of Construction Unit

Project Name: I promise to be serious in the construction process of this project Perform the following corresponding responsibilities and assume corresponding lifelong quality and safety responsibilities.

1. Contracting projects within the business scope permitted by the qualification level. No other units or individuals are allowed to contract projects in the name of the unit. After contracting the project, the contract will be signed in accordance with the law. After receiving the construction Construction can only begin after the permit is obtained.

2. No part of the contracted project shall be subcontracted at will without the consent of the construction unit.

Do not subcontract all the contracted projects or dismember all the contracted projects and subcontract them to others in the name of subcontracting.

3. Allocate key personnel in the construction project department in strict accordance with regulations, and ensure that all personnel are present to perform their duties.

4. Strictly organize the construction in accordance with the engineering design documents that have been approved by the construction drawing review agency and stamped with a special seal, as well as the construction technical standards and the quality standards agreed in the contract. Modify the engineering design without authorization and do not cut corners. The building materials, construction components, equipment and commercial concrete used in the construction shall be witnessed and sampled strictly in accordance with the regulations. After the inspection, there shall be a written record and signature of a dedicated person; if it has not been inspected or failed to pass the inspection, it shall not be used in the project. .

5. Establish and improve the quality and safety inspection and acceptance system, strictly manage the process

, and do a good job in quality inspection and records of concealed projects. Before the concealed project is concealed, the construction, design, supervision units and project quality supervision agencies shall be promptly notified for inspection and acceptance.

6. The data collection is true, accurate and complete, the signature procedures are complete, and it is organized and handed over to the construction unit for archiving in a timely manner.

7. Responsible for repairs of quality problems that occur during construction or projects that fail to pass the completion acceptance. Issue a quality warranty letter to the construction unit, which clearly clarifies the warranty scope, warranty period and warranty responsibilities of the construction project. If quality problems occur in construction projects within the warranty scope and period, warranty obligations must be performed strictly in accordance with laws and regulations, and the company shall be liable for compensation for the losses caused.

8. Other responsibilities prescribed by laws and regulations.

Promisor unit (official seal):

Promisor (project manager):

Year, month and day

Chapter 4: Construction unit Letter of Commitment

Letter of Commitment on Quality and Safety of Construction Projects

The projects constructed by our unit shall be carried out in accordance with the "Construction Law of the People's Republic of China", "Construction Project Quality Management Regulations", " "Construction Project Safety Production Management Regulations" and related laws and regulations, in order to strengthen the quality and safety production of construction projects, promote our unit to strengthen quality and safety responsibility awareness, and ensure that there are zero quality accidents and zero production safety accidents, we hereby solemnly commit to the following:

(1) Our unit shall obtain the qualification certificate of the corresponding level in accordance with the law and undertake projects within the scope permitted by its qualification level.

It is prohibited to exceed the business scope permitted by the unit’s qualification level or to undertake projects in the name of other construction units. It is prohibited to allow other units or individuals to undertake projects in the name of this unit.

My unit is not allowed to subcontract or illegally subcontract projects.

(2) Our unit is responsible for the construction quality of the construction project.

Our unit should establish a quality responsibility system and determine the project manager, technical person in charge and construction management person in charge of the project.

If a construction project is subject to general contracting, the general contracting unit shall be responsible for the quality of the entire construction project; if one or more of the construction project survey, design, construction, and equipment procurement are subject to general contracting, the general contracting unit shall Be responsible for the quality of the construction projects they contract or the equipment they purchase.

(3) If the general contractor subcontracts the construction project to other units in accordance with the law, the subcontractor shall be responsible to the general contractor for the quality of its subcontracted project in accordance with the subcontract. The general contractor shall Bear joint and several liability with the subcontracting unit for the quality of the subcontracted project.

(4) Our unit must construct in accordance with the engineering design drawings and construction technical standards, and shall not modify the engineering design without authorization, or cut corners.

If our unit discovers errors in design documents and drawings during the construction process, it should promptly provide opinions and suggestions.

(5) Our unit must inspect building materials, building components, equipment and commercial concrete in accordance with engineering design requirements, construction technical standards and contract stipulations. The inspection should have written records and signatures of dedicated personnel; Those that have been inspected or failed to pass the inspection shall not be used.

(6) Our unit must establish and improve the construction quality inspection system, strictly manage the process, and make quality inspections and records of concealed projects. Before concealing a concealed project, the construction unit shall notify the construction unit and the supervision unit. Supervisory authorities conduct random inspections.

(7) Construction personnel shall take on-site samples of test blocks, test pieces and related materials related to structural safety under the supervision of the construction unit or project supervision unit, and send them to a quality inspection unit with corresponding qualification levels for inspection. detection.

(8) Our unit shall be responsible for repairs of construction projects that have quality problems during construction or construction projects that fail to pass the completion inspection.

(9) Our unit should establish and improve the education and training system and strengthen the education and training of employees; personnel who have not received education and training or who have failed the assessment are not allowed to work.

(10) Responsibilities that are otherwise stipulated by laws and regulations.

(11) Our unit promises to punish those who fail to perform their duties on projects under construction in accordance with the following principles:

1. A safety production accident occurs during the construction process, and less than 2 people die. According to the "Regulations on Quality Management of Construction Projects", "Regulations on the Management of Safety Production of Construction Projects" and other relevant regulations, strict and maximum penalties will be imposed, and a bad record will be recorded for 9 months.

2. If a production safety accident occurs during the construction process and 3 or more people die, strict and maximum penalties will be imposed in accordance with the "Construction Project Quality Management Regulations", "Construction Project Safety Production Management Regulations" and other relevant regulations , and have a negative record for 12 months.

3. The supervision team randomly inspected and found that the construction unit refused to rectify the rectification notice issued by the supervision unit within one year, the installation, disassembly and acceptance of construction hoisting machinery did not meet the requirements, and the adjacent openings were not inspected. If the safety protection and special construction plans are not compiled, reviewed or demonstrated, or if the branch projects are not accepted according to the procedures and requirements and other responsibilities are not fulfilled, a bad record will be recorded for 3 months for the first time, and a bad record will be recorded for 6 months for the second time. Administrative penalties will be imposed; for the third time, a bad record will be recorded for 9 months until being blacklisted.

4. Failure to respond to the deadline for rectification issued by the regulatory department will be deemed as failure to implement the rectification, and a negative record will be recorded for 2 months for the first time; a negative record will be recorded for 4 months for the second time, and administrative penalties will be imposed. ; The third time, the bad record will be recorded for 6 months until it is blacklisted.

After a random inspection after the reply, if the rectification is not implemented in place for the first time, a negative record will be recorded for 1 month; for the second time, a negative record will be recorded for 2 months and administrative penalties will be imposed; for the third time, a negative record will be recorded for 3 months months until blacklisted.

Those who continue production despite being issued a notice of suspension and rectification will be recorded as having a negative record for 6 months, and will be reported to the relevant departments for further punishment and blacklisted.

5. According to Jianzhi [2014] No. 124 and Provincial Department of Housing and Urban-Rural Development Qianjian Jiantong [2014] No. 409, if the employees of the enterprise fail to perform their duties, record the bad records and make corresponding responses according to regulations. punishment.

Construction unit (official seal)

Date: Year, month and day

Legal representative: Telephone:

Authorized representative: Telephone:

Part 5: Commitment Letter Style

Attachment: 2-1

Construction Unit Project Leader Project Quality

Lifetime Responsibility Commitment Letter

I promise: During the project construction process, I will conscientiously perform the following responsibilities and assume corresponding lifelong quality responsibilities.

1. Project construction adheres to the principle of survey first, then design, and then construction. Provide authentic, accurate and complete original materials related to construction projects to units such as survey, design, construction, supervision, inspection and construction drawing review.

2. Promptly handle procedures such as project site selection, land use planning permission, construction project planning permission, project construction drawing review and filing, quality and safety supervision, contract filing, review of safety production conditions for start-up, and obtain a construction license Construction started on the rear.

3. The project is contracted to construction, supervision, survey, design, inspection and construction drawing review units with corresponding qualification levels. Projects that are required to be tendered are strictly conducted in accordance with the law and regulations, and the construction is not included in the contract. When a project is divided into subcontracts, the contractor shall not be forced to bid at a price lower than the cost, and the reasonable construction period shall not be arbitrarily compressed. Provide relevant design documents such as construction drawings and design changes that have been reviewed and approved by the construction drawing review agency and stamped with a special seal to the construction site.

4. It is not stated or implied that the survey, design, construction, testing and other units violate the mandatory standards for project construction or use unqualified building materials, construction accessories and equipment, reducing the quality of the project.

5. Our unit will strictly follow the "Construction Project Document Archiving Specifications" (GB/T50328-2014), organize documents and information in a timely manner, establish and improve project archives, and ensure the authenticity, accuracy and completeness of the archives. Before the completion acceptance and filing of the project, the "Quality Responsibility Information File" and the acceptance project data shall be submitted to the urban construction archives management agency, and the construction project files shall be handed over to the urban construction archives management agency within three months from the completion and acceptance filing.

6. For quality problems that occur in residential projects during the warranty period, our company will be responsible for repairs in accordance with relevant national regulations.

7. Earnestly perform other relevant legal duties and assume corresponding lifelong responsibilities. This letter of commitment is made in quadruplicate, one copy shall be submitted to the project quality supervision agency for record, and three copies shall be included in the project quality lifelong responsibility information file by the construction unit.

Attachment: 2-2

Project quality of the project leader of the survey unit

Life-long responsibility commitment letter

I promise: During the project construction During the process, we will conscientiously perform the following responsibilities and assume corresponding lifelong quality responsibilities.

1. Carry out survey business strictly in accordance with the engineering survey qualification level and business scope approved by the unit, do not conduct surveys beyond the level or scope, or undertake survey business in the name of other engineering survey units, and do not subcontract or illegally subcontract The surveying business contracted by the company. Sign engineering survey business contracts in accordance with the law, consciously implement the engineering survey charging standards stipulated by the state, and avoid vicious price competition.

2. Strictly implement the engineering survey standards and the engineering survey on-site witness system, and resolutely put an end to cutting corners, falsifying, and not providing false survey results.

3. During the survey process, organize and check the original records of the project survey work in a timely manner to ensure that the sampling and records are true and accurate, and do not leave the site to record or supplement the information.

4. The unit ensures that the survey documents provided to the owner are authentic and accurate, that the relevant signature and seal procedures are complete, comply with the national requirements for the depth of survey document preparation, and promptly submit the survey report and relevant original data. Archive and save.

5. Earnestly perform other relevant legal duties and assume corresponding lifelong responsibilities. This letter of commitment is made in five copies. One copy is retained by the surveying unit, one copy is submitted to the project quality supervision agency for filing, and three copies are included in the project quality life-long responsibility information file by the construction unit.

Attachment: 2-3

Design Unit Project Leader Project Quality

Lifetime Responsibility Commitment Letter

I promise: In the project construction During the process, we will conscientiously perform the following responsibilities and assume corresponding lifelong quality responsibilities.

1. Carry out design business strictly in accordance with the approved engineering design qualification level and business scope, do not design beyond the level or scope, or undertake design business in the name of other engineering design units, sign engineering design business contracts in accordance with the law, and do not Design business undertaken by subcontracting or illegal subcontracting. Consciously implement the engineering design charging standards stipulated by the state and avoid vicious price competition.

2. Design in strict accordance with the mandatory standards for engineering construction and relevant engineering construction specifications and standards. Construction drawing design is carried out strictly in accordance with the survey results witnessed on site and the approved preliminary design documents.

3. This unit ensures that the design documents provided have gone through strict internal review and proofreading procedures, have complete relevant signature and seal procedures, comply with the national document preparation depth requirements, and promptly submit the design documents and related information. Archive and save.

4. Supervise the construction unit to submit it for review in a timely manner and deliver the approved drawings to the construction unit for construction. If the construction unit uses unqualified drawings, our unit will not accept them.

5. Provide relevant units with legal and valid construction drawings stamped with the special seal of the design unit for drawings, the seal of the practitioner and the special seal of the review agency. Provide design briefings to construction units and supervisory units in accordance with regulations, and actively provide follow-up design services.

Related articles:

1. Complete sample letter of commitment

2. Sample letter of commitment format

3. Written commitment letter for style construction Sample essay

4. Sample personal commitment letter

5. Complete collection of personal commitment letters