21X hospital preparation project acceptance request report
The report website authoritatively released the 21X hospital preparation project acceptance request report. For more information about the 218 hospital preparation project acceptance request report, please visit the report website.
xx Municipal Health Bureau:
After nearly two years of preparatory work, XXXX Hospital has been basically completed and basically meets the conditions for opening. Now, the acceptance report of our hospital and all the materials are submitted together. Please allow the acceptance and guidance.
this is to
salute
xxxx hospital preparation team
December 19th, 21x
1. Basic information of the hospital:
With the care and help of leaders at all levels and relevant departments, our hospital has been progressing smoothly and all the work has been completed well since it received the approval document for setting up medical institutions from the Municipal Bureau on April 1th, 212. In the early stage, according to the functions and department settings of the hospital, the decoration and supporting facilities were completed, all kinds of professionals at all levels were recruited, technical talents were introduced, and various large and medium-sized medical equipment were purchased. Some are gradually entering the stage of installation and debugging. The construction of various systems and on-the-job training for all staff have been completed. According to the current situation of the hospital, it has basically met the conditions for opening a clinic. Please give further guidance to the leaders and experts.
second, the establishment of hospital departments:
third, the composition of hospital personnel:
At present, the total number of employees in the hospital is 121. All kinds of personnel at senior, middle and junior levels are basically in place and the structure is reasonable, which can meet the needs of clinical medical work. (Attached with personnel roster)
IV. Hospital system construction:
In order to strengthen medical quality management, prevent medical errors and accidents, further improve medical quality and level, and better serve people's health. According to the actual situation of our hospital, we have formulated various medical rules and regulations, administrative management system, operating rules of medical technology, hospital emergency plan and employee handbook, etc., and compiled them into books for the convenience of employees. The establishment of the above-mentioned systems will undoubtedly have sufficient guarantee for strengthening and improving the management of our hospital, standardizing medical behaviors, further improving medical quality and promoting the healthy development of the hospital. (Attached to the regulations and technical operation procedures of medical institutions)
V. Purchase of basic instruments and equipment:
According to the needs of hospital business, various kinds of clinical medical equipment have been equipped, which have arrived one after another, and some of them are still being installed and debugged. The basic equipment and infrastructure of the outpatient ward are all available, which can meet the needs of clinical medical work. (Attached with equipment list)
VI. Staff training in the whole hospital:
In order to further improve the quality of employees, fully tap the potential of each employee, continuously enhance the ideological awareness, work awareness, responsibility awareness and service awareness of all employees, and establish the spirit of hardship, professionalism, dedication and team spirit of employees; The hospital attaches great importance to staff training, and has conducted various trainings for all staff. We also organized employees to learn different knowledge such as hospital rules and regulations, technical operating procedures, prevention and treatment of infectious diseases, nosocomial infection knowledge, disinfection and isolation knowledge, and medical waste disposal. We also held a lecture on fire protection knowledge, which enabled employees to enhance their awareness of fire protection, learn fire protection knowledge, avoid and eliminate the occurrence of potential dangerous factors, and ensure the safety of collective and individual lives and property. Hospitals often organize employees to give business lectures, constantly improve their business knowledge and skills, and enhance their academic awareness and knowledge level, thus improving their medical knowledge level. Above all, the preparations we made before the clinic laid the foundation for the smooth opening of our hospital and will also play a positive role in promoting the hospital work in the future.
VII. Basic information of disinfection supply room:
Disinfection supply room is an important department of the hospital, which is mainly responsible for medical disinfection supply in the whole hospital. In this regard, the hospital leaders attached great importance to it, invited professional health technicians to guide the construction, and now it has been debugged and completed, and equipped with senior nursing staff as the head of the department, which can meet the disinfection supply work of the hospital.
VIII. Treatment of medical wastes:
Hospital leaders attach great importance to the treatment of medical wastes. We have signed an intention contract with Kangsheng Company for incineration of medical wastes, and all medical wastes in the hospital will be recycled and disposed by the company.
our hospital has set up temporary storage places for medical wastes, and marked different storage places for medical wastes and domestic wastes respectively, and designated persons are responsible for recycling, and all registration work is well done. The temporary storage place of medical waste meets all requirements, the room is sealed, locked, rat-proof and anti-theft, and the safety measures meet the requirements. Indoor lighting, and installation of ultraviolet light, do regular disinfection, in case of iatrogenic waste pollution to the environment.
IX. Hospital environmental assessment:
Hospitals attach great importance to environmental protection. The medical waste hospital has signed an intention contract with Kangsheng Company for the incineration of medical waste, and all the medical waste in the hospital has been recycled and disposed by the company, which has become an infection department, and established relevant rules and regulations such as hospital infection, disinfection supply and garbage disposal, as well as a hospital infection team, which has positive significance for protecting the environment and reducing pollution.
in view of all the preparations in our hospital, we hereby apply for the superior to arrange experts to come to our hospital for inspection and guidance.
Equipment acceptance report template
Equipment unpacking acceptance record
Xxxxxx unit October
I. Appearance inspection
1. Take photos of the equipment and its outer packaging, check whether the outer packaging of the equipment is in good condition, whether it is damaged, wet, damp and deformed, and check the surface and packaging state of the outer packaging box;
2. Check whether the surfaces of equipment and accessories are damaged, rusted, bruised, etc., and mainly check whether the transfer impeller is damaged, main components and main working faces;
3. If the packaging is damaged, the equipment and accessories are damaged, rusted, used and other problems are found, detailed records should be made, and photos should be taken for the record, and the procedures for returning and claiming compensation should be handled with the supplier in time.
2. Quantity inspection
1. The quantity inspection shall be based on the supply contract and packing list, and the specifications, models, configurations and quantities of the main engine, accessories and other equipment shall be checked one by one;
2. Carefully check whether the accompanying materials are complete, such as instruction manual, product inspection certificate, warranty certificate, etc.
3. Pay attention to check the serial number and factory number of the equipment, and check online if necessary;
4. carefully record the unpacking inventory, indicating the location, time, participants, case number, product name, arrival and actual quantity. if there are any problems such as shortage and wrong delivery, timely record them and keep relevant materials.
3. Fill in the acceptance record form
1. After the box acceptance, if any item is found not to meet the requirements of the contract documents, it must be approved (signed and sealed) by the supplier's representative.
2. Write the equipment unpacking inspection record, serial number, factory number and field photos as part of the equipment acceptance document.
equipment unpacking acceptance record form
No.:
house decoration completion acceptance report
The report website authoritatively publishes the house decoration completion acceptance report. For more information about the house decoration completion acceptance report, please visit the report website.
Client:
Client's Tel:
Entrusted project acceptance unit:
Project acceptance inspectors:
Supervisor:
Project acceptance address:
Project completion acceptance basis: Quality acceptance standard for family bedroom decoration project
Project overview:
This project has two bedrooms, two halls and one bathroom.
conclusion of house decoration completion acceptance:
1. the decorative surface of the project was hollowed and cracked in many places (see the schematic diagram of the entrustment sheet ③ ⑤ ⑨ ⑾), and the acceptance was unqualified.
basis: putty with water resistance should be used in standard 9..2, and the combination of putty and matrix should be solid and firm, without peeling, powdering and cracking.
second, the paint of the door and door frame of hall 1 is brushed and sagged (see the sketch of the entrustment form ⑿), and the acceptance is unqualified.
basis: according to standard 9..3, the paint surface should be smooth, bright and clean, free from brush leakage, peeling and spot marks, with clear wood grain of varnish, no edges, sagging and wrinkled skin on the large surface, basically the same color and no brush lines. Hardware and glass are clean.
the hollowing rate of floor tiles in hall 3 and hall 1 is 2.8%, that of floor tiles in hall 2 is 12.5% and that of wall tiles in bathroom is 5.98% (see sketch ② ⑩ ⒀ of the entrustment sheet), and the acceptance is unqualified.
basis: according to the standard 8.1.4, the wall and floor tiles shall be laid flat and firm, with clear patterns, no dirt and slurry marks, basically the same surface color, even joints, no cracks, corners and missing edges, and the hollowing rate of corners of a single board shall not exceed 5% of the quantity.
iv. The wall power cord is directly buried in the plastering layer without a sleeve of conduit, and the joint at the branch of the top power cord is not put into the wire box (see the schematic diagram of the entrustment sheet ⑦), so the acceptance is unqualified.
basis: according to standard 3..2, the electrical wiring should be laid with concealed pipes, and the wires should not be knotted and twisted in the pipes. The distance between the wires and telephone lines and closed-circuit television lines should not be less than 5 cm. Exposed wires are not allowed in the ceiling, and it is forbidden to bury the wires directly in the plastering layer.
5. The water supply pipe is not fixed, and the pipeline is bent (see the schematic diagram of the entrustment sheet), and the acceptance is unqualified.
according to the standard 2..2, the pipeline installation should be horizontal, firm and straight, the laying should be firm, the slope should meet the requirements, the valves and faucets should be installed level and straight, and the use should be flexible and convenient. The exposed pipes should be painted with antirust paint, and the concealed pipes should be painted with anticorrosive paint.
VI. There are traces of water seepage around the water outlet of the toilet (see intention ① of the power of attorney). Because there is no water source, it is impossible to do the water test (to be determined after the result is confirmed).
by: