Current location - Trademark Inquiry Complete Network - Trademark registration - Technical Innovation of TBEA yang shen Transformer Group Co., Ltd.
Technical Innovation of TBEA yang shen Transformer Group Co., Ltd.
-technical research and development team, scientific research means and strategic partners of multi-party technical cooperation.

TBEA Shenbian Company is the earliest enterprise in China to develop and produce 500kV transformers, which has created many firsts in the development of China's electric power industry and pioneered the technological upgrading. With the National Transformer Technology Center, dozens of scientific and technical personnel enjoy government subsidies, and many old experts such as Mr. Yao Xing are employed as senior experts and consultants by State Grid Corporation of China. For a long time, TBEA Shenbian Company has always insisted that "ensuring the core competitiveness of independent research and development of enterprises" is the foundation and cornerstone of long-term sustainable development of enterprises, continuously increased investment in new product development and scientific research, and cooperated with Tsinghua, Xi Jiaotong University, Harbin Institute of Technology, Shenyang University of Technology, harbin university of science and technology and other well-known domestic universities and worked in the Institute of Atomic Energy for a long time. In each "Five-Year Plan", TBEA has undertaken major research achievements and achieved a large number of independent intellectual property achievements. While insisting on independent research and innovation, we also constantly absorb and introduce foreign advanced transformer manufacturing technology. Since 1980s, the design and manufacturing technologies of 500kV large transformers from Alstom Company of France and Hitachi Company of Japan have been introduced successively. From the 1990s to the new century, through technical cooperation and project cooperation, the design and manufacturing technologies of major foreign transformer manufacturers such as Siemens in Germany have been studied and introduced. In 200 1 year, a set of 350kV~ 1 150kV UHV design and verification technology was successfully introduced from Zabrozh Transformer Research Institute in Ukraine. By integrating advanced technology, the ability of independent innovation has been greatly accelerated. On August 15, 2008, the National Development and Reform Commission officially approved that TBEA Shenbian Company and Shenyang Transformer Research Institute would jointly implement the "National Engineering Laboratory Construction Project of UHV Substation Technology". On September 12, the National Development and Reform Commission held a ceremony to officially award the license. This is the only national engineering laboratory in China transformer industry, the first national engineering laboratory in Liaoning Province and the first national engineering laboratory in Shenyang. The approval to implement this project is the country's full trust and affirmation of TBEA Shenbian Company's independent innovation capability, which indicates that TBEA Shenbian Company has become a leading enterprise in independent innovation of China transformer industry. The further implementation of this project will promote the leap-forward improvement of TBEA Shenbian Company's independent innovation capability, improve the attractiveness of enterprises to high-end talents in the industry, form an agglomeration effect, and promote TBEA Shenbian Company to continuously master the core technology of the industry and become a leader in the technological development of China and even the world.

The internal structure and shielding measures of UHV and UHV test halls of TBEA Shenbian Company are designed and built according to the current international advanced technology. The main test equipment is air cushion moving, and the samples in the hall are also moved by air cushion car. The main test equipment and measuring instruments are produced by famous companies at home and abroad. Good test conditions and advanced test equipment and measuring instruments have greatly improved the test efficiency and technical level, and enabled the museum to test UHV and large-capacity power transmission and transformation equipment.

Effective space in the EHV test hall: length× width× height: 70× 40× 33m. The width× height of the product entrance door is: 1 1 × 17m. Hall grounding resistance is 0.08 Ω. The hall has good electromagnetic shielding and sound shielding efficiency. Electromagnetic shielding is composed of copper mesh and metal conductor, and the shielding effect can reach 65dB. All doors are integrated with a shielding system. Therefore, the background interference level can be as low as 10 pC when the broadband method is used for partial discharge tests of transformers and reactors. The good sound insulation function of the hall makes the background noise level during sound level measurement not exceed 40 dB(A). The laboratory has a controllable central air conditioning ventilation system, which is conducive to ensuring a better test environment. This laboratory is equipped with an automatic control system and a multi-point hook at the top of the laboratory, which simplifies the test steps and improves the test efficiency. There are two independent test benches in the lobby, which can test two products at the same time.

The final electrical performance tests of transformers, reactors and other products are conducted in this hall. These tests include: routine test, type test, special test except short-circuit ability, etc. The test is conducted in strict accordance with the user's technical agreement and corresponding standards, mainly including Chinese national standards, IEC standards, American national standards and other national standards.

The test hall has the following test capabilities:

Dc products:

1000KV large-capacity converter transformer, smoothing reactor, etc.

Communication products:

1000KV large-capacity transformer, reactor, controllable reactor, etc.

Other special project tests and research tests

Excellent test environment and precise test equipment and instruments not only meet the current test requirements, but also meet the test requirements of electrical products with larger capacity and higher voltage grade in the future. The performance of large-capacity products provides valuable manufacturing experience for our company. TBEA yang shen Transformer Group Co., Ltd. started mass production of 500 kV transformers in 1980s, and developed a million-volt transformer at the end of 1990s. Thousands of high-quality 220kV~ 1000kV transformers have been provided for several national key projects, and rich experience in process manufacturing has been accumulated. A large number of skilled professional and technical workers have been trained. For the manufacture of key products, we suggest that the most mature and reliable technical scheme for the core, coil, insulation, oil tank and assembly of nuclear power transformer should be formulated on the basis of the successful manufacturing experience of super-large transformers in the past. Typical product performance is as follows:

1980 made the first 250MVA and 500kV single-phase transformer in China for Jinzhou Dongjia Substation.

1985 360MVA and 500kV on-load voltage regulating autotransformers were manufactured for Gezhouba Hydropower Station.

1993, a1000 mA, 500kV single-phase water-cooled SF6 bushing outlet transformer was manufactured for Manwan Hydropower Station in Yunnan.

1995 A 450 MVA 330kv three-phase power transformer with the largest capacity in China was manufactured for Lijiaxia Hydropower Station.

1998 A 500kV shunt reactor was developed by ourselves, and a complete set of shunt reactors was produced for the Three Gorges Project.

150mva/1000kv1999 developed single-phase transformer has been used as the test equipment for 500kV shunt reactor.

1999, the 720MVA and 500kV three-phase power transformer with the largest voltage level and single unit capacity in China was developed by our institute and has been put into operation in the C plant of Guangdong Shajiao Power Plant.

In 2002, the converter transformer of Lingbao converter station was designed and manufactured by itself.

In 2002-2004, we cooperated with Siemens in Germany to produce 500kV converter transformers and 840MVA/500kV power transformers.

In 2004 and 2006, the 900MVA transformer independently developed by our company was in good condition after being put into operation in the United States, and won the first prize of national machinery industry science and technology.

In 2005, our company sent the domestic single-phase autotransformer with the maximum capacity of 533MVA, which was independently developed and used in 1600MVA substation, to the United States, which fully proved that the enterprise was fully capable of producing similar products instead of imported products.

In 2005, our company successfully repaired the three-phase 1000MVA/500kV main transformer for Suizhong Power Plant, which is the largest generator transformer in China at present.

In 2005, our company repaired a single-phase 4 17MVA/500kV transformer for Tianwan Nuclear Power Station, which was the first in China.

In 2006, our company took the lead in independently producing 500kV DC converter transformer in China, and successfully manufactured the controllable reactor of UHV for the economical society, which provided a new reactive power compensation scheme for the construction of UHV power grid. Based on the first UHV test line in China, we have successfully developed a 40MVA/ 1000kV transformer.

In 2007, our company successfully developed the first large-capacity detachable transformer in China for the 330 kV substation in Heihe, Gansu Province, and further optimized the transportation solution of the large-capacity transformer on the basis of Longtan 780MVA, the world's largest three-phase combined transformer.

At the beginning of 2008, all products of Guiguang Second Ring Road were successfully put into production at one time, and the product performance parameters surpassed Siemens and reached the world leading level. On April 12, our company successfully completed the development task of 750 kV transformer for the follow-up 750 kV transmission project in northwest China. On June 3rd, the first batch of 500 kV DC converter transformers developed by our company for the Sino-Russian DC back-to-back networking project were successfully shipped. The products are completely designed, verified, purchased and manufactured by our company independently, achieving complete autonomy.

On July 4th, 2008, the world's first UHVAC1000 MVA/1000 kV transformer was successfully developed in TBEA, and all the test items were passed. This is another world-class product independently developed by TBEA Shenbian after the successful development of the world's first 800 kV dry smoothing reactor on June 5. The successful development of a series of world-class products indicates that TBEA has built an independent innovation system for UHV products in an all-round way, mastered the most advanced technologies in the field of world communication and DC power transmission and transformation equipment development, and reached the highest level of independent innovation in the same industry in the world. At the same time, it also marks that China's power transmission and transformation technology has reached the world's leading level, and China is realizing the leap from a big transformer manufacturing country to a powerful country! On June 7th, 2008,165438+1October 65438, and the fourth product of UHV 1000 kV also passed the test successfully. TBEA Shenbian Company successfully completed the scheduled delivery of the contract equipment for the 2006 UHV AC test demonstration project signed with State Grid Corporation. On February 8, 2008, from 65438+ to 10, State Grid Corporation of China started the zero boost test and impulse closing test of UHV AC test demonstration project successively. Three transformers and three reactors of TBEA Shenbian Company all passed the test of the highest voltage 1 100kV, and became the only transformer and reactor manufacturer with no problems in debugging.

On February 7th, 2009, the product DFP-4 17000/500 produced by our company for Jiangsu Nuclear Power Co., Ltd. passed the test at one time, and the test results were all better than the technical agreement requirements. This product is the real main transformer of nuclear power in our company and the largest single-phase double-column transformer manufactured by our company at present. Its success shows that our company is fully capable of providing large-capacity transformers for nuclear power plants.

In April 2009, the DFP-380000/500 transformer in Pengcheng Power Plant was successfully put into operation. This transformer is the largest single-phase single-column transformer produced and operated by our company, reaching the world advanced level.

On August 26th, China Southern Power Grid Corporation 800 kV DC Demonstration Project, the world's first successfully tested 800 kV product was successfully developed. The partial discharge index is almost equal to the background value, and the indexes such as no-load, load, temperature rise and noise are far superior to the contract standard requirements. On February 6th, 65438, the 800 kV DC converter transformer developed for Xiangjiaba-Shanghai 800 kV DC transmission demonstration project of State Grid Corporation passed the test with the best index again.

On February 28th, 2009, at 65438, the UHVDC 800kV converter transformer developed by our company was successfully put into operation at the world's highest converter station1850m-Chuxiong converter station of China Southern Power Grid Corporation. The achievement of a series of independent innovation achievements indicates that the research and development technology of UHV products of TBEA Shenbian Company has been fully mature, and it has completed the national "Eleventh Five-Year" major scientific research plan one year ahead of schedule, becoming the first manufacturer in China with a full range of AC and DC products.

In June 5438+February 2009, the first product of the main transformer DFP-420000/500 of Hongyanhe nuclear power project developed by our company was successfully tested in our national engineering laboratory, which accumulated valuable experience for the subsequent batch production of Hongyanhe nuclear power main transformer, Yangjiang nuclear power main transformer and Taishan nuclear power main transformer.

On February 24th, 20 10, the company successfully won the bid for 5 packages of local complete substation projects with 8 765kV substations, including 73 765kV shunt reactors, neutral point reactors, lightning arresters, transformers and other major equipment, with the total contract amount exceeding USD 6,543.8 billion. This bid indicates that our company has not only achieved a leading position in the field of UHV transmission in China, but also been widely recognized in the field of UHV transmission in the world, and its independent innovation capability has been at the forefront of the same industry in the world.

On August 2, 20 10, the company successfully won the bid for all main equipment converter transformers and smoothing reactors in Lhasa converter station of Qinghai-Tibet ±400kv DC power transmission and transformation project. Winning the bid for DC equipment again shows that the converter products produced by our company have been recognized by State Grid Corporation.

On September 20 10, the company successfully won the bid for 26 main transformers, auxiliary transformers and high-voltage auxiliary transformers of Units 3, 4, 5 and 6 of Tianwan Nuclear Power Station expansion project of China Nuclear Power Engineering Company, with a contract value of nearly 200 million yuan. Winning the bid marks that our company has fully entered the nuclear power market and has been recognized by nuclear power customers.

20 10 10 signed the UHV DC project of nuozhadu and Xiluodu of China southern power grid corporation. * * * There are more than 40 converter transformers and smoothing reactors, and the contract amount exceeds 654.38 billion. Winning this project has once again increased our company's share in the DC market. This also marks that our company's DC products have reached a new level.

In February of 20 10, the company successfully won the bid for 5 main transformers in Jinnan-Nanyang-Jingmen 1000kV UHV AC test and demonstration project, with the bid amount of nearly 200 million yuan, ranking first in the same industry, which continued to consolidate our position in the field of UHV and laid a good foundation for our company to fully participate in the construction of the "Twelfth Five-Year Plan" UHV project.

20 1 1,1On June 9, good news came from Beijing: At the just-concluded 20 10 National Science and Technology Awards Conference, the "Three Gorges Power Transmission and Transformation System Project" that the company participated in won the first prize of National Science and Technology Progress. This is the eleventh five-year plan period. Following the project of "Development and Industrialization of Major Complete sets of Technology and Equipment for UHVDC Transmission" and the project of "Research on Key Technologies, Equipment Development and Engineering Application of 750kV AC Power Transmission and Transformation" won the first prize of national scientific and technological progress in 20 10 and 2007 respectively, the company's third scientific and technological achievement was recorded in the history of the national highest scientific and technological achievement award. "Three Gorges Power Transmission System Project" is a national key scientific and technological project, a complete set of national major technical equipment development and national industrialization, and belongs to the cutting-edge technology of the international electrician industry. The research and application of this technology is of great significance to the technical upgrading of complete sets of power transmission and transformation equipment in China, breaking the market monopoly and technical barriers of foreign companies, implementing the optimal allocation of national power resources, ensuring national power security and promoting social and economic development. The company provided products such as "Converter Transformer of Zhengping Converter Station of Three Gorges-Changzhou 500 kV DC Transmission Project" and "Smoothing Reactor of Gehu DC 500 kV Fengjing Converter Station" for the Three Gorges transmission system project respectively. In the whole project, * * * undertook the development task of 8 DC and 9 AC products, and most of these products have been put into operation in the Three Gorges transmission system project, which has been highly praised by users. During the implementation of the project, the company solved the main insulation design problem of converter transformer under the action of AC and DC composite voltage through scientific research, broke the monopoly of foreign technology and realized independent design, independent procurement and independent production; An independent DC project development system has been formed, creating a precedent for the localization of major equipment. After appraisal, the technical performance indexes of the above products have reached the international advanced level, which has made great contributions to the transmission system and industrial development of the Three Gorges Project.

20 1 1 February, in the bidding process of Jinping-Sunan 800 kV UHVDC transmission project, the company won the bid of 690 million yuan, ranking first among the three domestic bidders. This tender shows that our company's ability to fully absorb and master the core technology of DC transmission has been recognized by State Grid Corporation.

2012,6543813, Shenbian Company successfully won the bid for all six converter transformers and four oil-immersed smoothing reactors in North China in the first batch of equipment project bidding for the back-to-back expansion project of Northeast-North China interconnection of State Grid Corporation, with a winning rate of 50%.

On March 9, 20 12, in the bidding of the State Grid Corporation's Wandian East Transmission Project, Shenbian Company successfully won the bid for 7 ODF PS- 10000/ 1000 transformers and 7 BKD-240000/ 1000 reactors, and the winning amount of transformers accounted for the total number of transformers in the project. The contract amount is more than 400 million yuan. Power transmission from Anhui to East is a landmark project of large-scale UHV AC power transmission and transformation technology, and it is also a key UHV AC project built by the State Grid during the Twelfth Five-Year Plan period, which is a world-class major innovation project. Winning such a big order for Anhui power transmission and transformation project not only shows that the comprehensive strength of Shenbian Company, such as technical level, has been fully recognized by customers, but also provides a platform for enterprises to improve quality and innovate, and constantly consolidates Shenbian's leading position in the world's leading technology field of power transmission and transformation.

On may 24th, 20 12, in the main equipment bidding project of the second channel power transmission and transformation project of Xinjiang and northwest main power grid connected by State Grid Corporation of China in 20 12, Shenbian Company successfully won the bid for 17 750kV reactors, including the world's first 750kV magnetically controlled controllable reactor. This is the second time in 20 10 that Shenbian Company undertook the research and development of 750kV main transformers and reactors for the 750 kV interconnection project between Xinjiang and Northwest China. It is also the first 500kV UHV magnetically controlled reactor in Jingzhou Converter Station in 2006, and then climbs the technical peak in the reactor field. Among all the bid-winning enterprises, TBEA Power Transmission and Transformation Industry Group ranks first in the bid-winning amount, and Shenbian Company ranks among the best among all the bid-winning enterprises, and continues to maintain its leading position in the state grid market.

On September 4th, 20 12, 12, in the bidding for the 800 kV UHVDC transmission project of State Grid Corporation Haminan-Zhengzhou, Shenbian Company successfully won the bid for 1 * * 26 sets of high and low-end converter transformer packages, with the winning bid amount of155 million yuan, which is the only one among all bidders. Hami South-Zhengzhou 800 kV third transmission line project is the third Third project built by State Grid Corporation of China after the "Uplink" and "Jinsu" projects. This is the first UHV DC project sent by a large-scale thermal power base in northwest China since the country implemented the strategy of "sending electricity from Xinjiang". It is also the second UHV DC project dispatched by Shenbian Company after Uplink, Ningdong, Julio, Lingbao, Qinghai-Tibet, Gaoling, Jinping, Heihe and Qinghai-Tibet. This bid adds a lot of color to the performance of TBEA DC drive, further enhancing the company's popularity and influence in the field of UHV.

The successful development of these products, which represent the most advanced technology of power transmission and transformation in the world today, shows that the country fully affirms the comprehensive technical strength of TBEA Shenbian Company, and also fully demonstrates the innovative ability and development vitality of TBEA Shenbian. The technology center is the key core department of TBEA, including the technology center directly under the headquarters, four sub-centers and a laboratory under its leadership. The center has gathered a group of top experts and technical teams, including industry academicians, and is committed to the research and development of key equipment, technologies, processes and standards in the fields of power transmission and transformation, new energy and new materials. The technology center constantly develops new products and technologies to meet the needs of users, and at the same time constantly improves and improves the existing technologies. The mission of the center is to provide reliable, energy-saving, convenient and applicable products and new alternative technical solutions for users in different countries and regions, reduce the cost of users and make the company gain sustainable competitiveness.

With a global perspective, the center cooperates with more than 0/0 respected scientific research institutions in the fields of power transmission and transformation, new energy and new materials, such as Tsinghua University, Institute of Electrical Engineering, Chinese Academy of Sciences, Zabuluo Thermal Transformer Research Institute, Croatia and Xi 'an Jiaotong University, exchanges and studies with global technology leaders, carries out technology introduction, digestion, absorption and re-innovation, continuously commercializes new technological achievements, and promotes the development of power transmission and transformation in China. Patented technology and certificate

1.OSFSZ9—900000/230 On-load tap-changer autotransformer, first prize of scientific and technological progress of China machinery industry in 2005;

2.500kV low-loss and low-noise shunt reactor won the first prize of scientific and technological progress in China machinery industry in 2004;

3.OSFPS-400000/400 three-phase oil-immersed no-load voltage-regulating autotransformer, the first prize of scientific and technological progress of China machinery industry in 2004;