1, lump sum deposit and withdrawal: principal and interest due = principal ×( 1+ annual interest rate× deposit term ÷365).
2. installment withdrawal: due principal and interest = principal × annual interest rate × (deposit term ÷365)×(n÷ 12)+ principal.
3. Current savings: interest = account balance × annual interest rate ÷365.