Summary of capital construction work
Model essay on summary of capital construction work (selected 6 articles)

Time flies and a piece of work is over. After a period of accumulation and precipitation, we have made great progress and changes. I think you need to write a work summary. So how do you sum up your works and write new tricks? The following is a summary essay (6 selected essays) carefully arranged by me for reference only. Let's have a look.

Summary of capital construction work 1 In order to grasp the family background, make overall planning and implement it step by step, a thorough investigation has been made on the school buildings in the county since 20xx. At that time, the total area of school buildings in the county was 327,830 square meters, including D-class dangerous buildings153,658 square meters. Through the implementation of school safety projects, the construction of canteens in weak schools, teachers' low-rent housing, teachers' revolving dormitories, pre-school education and ordinary high schools in the past five years, our county has eliminated D-class dangerous houses138,928 square meters, built 277,925 square meters of new school buildings and started the standardization construction of 27 schools. At present, 20 schools have been basically completed.

Existing shortcomings

(1) Due to the large-scale simultaneous promotion of school infrastructure construction in the county, although the conditions for running schools have been greatly improved, it has also caused excessive education debt. Personality is one of the agent systems of school security projects, with more than 50,000 square meters without project support and more than 70 million debts. It is very difficult to implement the follow-up projects.

(2) Since the implementation of the education infrastructure project in our county, there has never been a major quality and safety accident, but there are also some shortcomings in management, such as inadequate process management, which leads to some details in the decoration stage.

The focus of the next step

(1) Organize the implementation of urban school construction. The focus of capital construction in 20xx is mainly on the construction of Chengnan School, Siyuan Experimental School and County Vocational Education Center, and strive to complete the construction of the main building of County No.1 Middle School, Chengnan Complete Primary School, Siyuan Experimental School and the training building of Vocational Education Center this year.

(2) Implement the "overall thinning" project in 20xx and 20xx, and plan to build more than 46,000 square meters of new school buildings.

(3) To implement the teachers' turnover dormitory project, 6090 square meters of teachers' turnover dormitory in 10 schools should be completed within this year.

(4) Implement the second three-year action plan for preschool education, start 14 rural kindergartens this year, and plan to build 23,220 square meters of new kindergartens.

(5) Complete the construction of six standardized schools.

(6) Complete the drinking water safety project of 16 schools within this year, with a planned total investment of 2.4 million yuan.

(seven) before May, cooperate with the financial planning unit to complete the formulation of the management measures for teachers' turnover rooms (including all teachers' rooms in the school).

(eight) before July, complete the final acceptance project settlement and education debt cleaning.

Summary of Infrastructure Work In the first half of 20xx, the Infrastructure Department was in charge of the General Management Office. The work data of the infrastructure department is still in two aspects: new construction and maintenance. The work of the Capital Construction Department in the first half of 20xx is summarized as follows:

First of all, new

In recent years, the new construction work has been the handling of the preliminary construction procedures of the fourth school project. In the second half of 20xx, due to the property right formalities of construction land, the project planning permit could not be handled and the project could not be started as scheduled. Now, with the support and help of school leaders, the relevant problems have been solved, and the state-owned land use certificate and construction project planning permit have been obtained. At the same time, Beijing Municipal Development and Reform Commission allocated 30 million yuan of project funds to support the project construction. At present, the fourth phase of the project is under construction general contracting tender, and construction is expected to start in X years this year.

Second, maintenance

In the first half of the year, the maintenance work of the Infrastructure Office was tight and the task was heavy. Most of them are carried out in summer, which is very difficult. For example, the adjustment of external policies and internal problems involving a wide range of personnel and departments make construction difficult. Through the coordination of school leaders and department leaders, the Infrastructure Department has completed the following maintenance tasks:

1, renovation project of painting dormitory in the red chamber corridor.

2, professional building and cultural building corridor decoration engineering.

3. Maintenance of Beixinqiao Dormitory and Baijiazhuang.

4. Repair works along professional buildings.

5. Waterproof project of West Dormitory.

6. Anti-seismic reinforcement project of acrobatic training hall and teachers' dormitory building, in which the reinforcement part has been completed and the decoration part of dormitory building is under construction.

7. Restoration project of ground collapse and resurgence in student dormitory building.

Summary of Infrastructure Work In the past 3 20xx years, under the leadership of the Party and government of the factory, the Infrastructure Section has actively organized and worked hard around the two key points of production maintenance and fixed assets investment project construction, completed various tasks and achieved certain results. The work of the past year is summarized as follows:

I. Completion of Target Responsibility

Comparing the work report of the workers' congress with the target responsibility letter of the Ministry of Infrastructure, our Ministry has made detailed arrangements for all the work from the beginning of the year, defined the responsibilities and determined the goals. At present, the objectives have been successfully completed.

According to KKK's 20xx fixed assets investment plan, our department is responsible for four infrastructure projects: the new fire building project, the west slope treatment project of thermal power, the KKK square landscape project and the Dongshan Road project.

Second, the main achievements

1, closely around the production, service production, fully completed the coordination of installation, maintenance and overhaul:

Over the past year, our department has focused on service production, and the maintenance plan declared by each production unit can always be compiled and audited in the shortest time, and implemented in time according to the requirements of the reporting unit to ensure the normal operation of production equipment. In the process of maintenance, we completely obeyed the arrangement of the maintenance headquarters and completed the civil engineering cooperation.

2, the construction safety without accidents

Safety work is very important. The Capital Construction Section has always attached great importance to construction safety and always regarded safety as the primary task in its work. According to the characteristics of maintenance and construction, focus on checking the implementation of construction fire safety and the safety precautions of operators themselves, strengthen bill management, and implement on-site supervision on key areas. Organize safety inspection and appraisal activities on a regular basis, organize safety inspection and appraisal activities for 6 times throughout the year, conduct safety inspection on each construction site item by item, * * * find out safety problems 12, put forward rectification in time for the problems found, and no construction safety accidents occurred.

3. Standardize the plan declaration procedure, and the work efficiency is obviously improved.

In order to fully adapt to the standardized management procedures, combined with the specific work of our department, after a year of exploration and practice, a complete set of plan management methods has been summarized, from the collection and screening of plans to the preparation of construction plans, from the classification and reorganization of plans to the implementation of plans, as well as acceptance and visa, and improvements have been made in the following aspects:

(1) Change the past weekly plan into monthly plan, specify the time requirements of each work node, which is completely consistent with the statistical rhythm of the whole plant plan, and is convenient for unified management and declaration.

(2) Classify and integrate the plans, and merge all the maintenance plans of this unit in the current month into a big plan for implementation according to the workshop or department, which is convenient for construction and management.

(3) The construction scheme is more detailed and the budget estimate is more accurate.

(4) The plan management is more standardized and the information is more comprehensive. A perfect plan management registration system has been established, and each plan has detailed records from taking over to completion, with clear data and ready reference.

5], the project quality and schedule management is strict, organize the project quality and schedule inspection regularly every month, and the monthly plan must be completed that month.

[6], project acceptance and visa more timely. In the past, the quarterly acceptance of maintenance projects was changed to monthly acceptance, and the visa must be completed within one month after the completion of the project acceptance.

Once, the online plan declaration and approval procedures were fully implemented, and the work efficiency was significantly improved. In the past, a plan was often not approved for several weeks, and builders spent most of their time in the plan approval stage. After the implementation of online declaration, the plan declaration becomes convenient and fast.

4. The problem of over-planned investment in infrastructure projects has been significantly reduced.

Over the years, the problem of over-planned investment in infrastructure projects has not been effectively solved. This year, on the basis of previous project management experience, our department carefully analyzed the causes of such problems, and learned from good management methods of other units, and accumulated some experience. The specific method is as follows:

(1), strengthen the management of design and budget estimate, try to avoid design errors and omissions, and the budget estimate should be comprehensive and detailed to avoid omitting major expenses.

(2) Strengthen the management of project bidding list, and make the list comprehensive and detailed. The selection of engineering materials should be based on the list. Without the list, the material grade and decoration grade will be improved without authorization, which will inevitably lead to the increase of engineering investment. In the past, many projects in our factory had similar problems.

(3) On the premise of controlling investment, reduce engineering changes. Where necessary changes are involved in the engineering structure, the increase of investment shall be controlled as far as possible under the condition of meeting the requirements.

(4) Real-time control of project investment and flexible adjustment of construction scheme. When the cost of a single project increases due to some necessary changes in the project, on the premise of meeting the use function, measures such as appropriate adjustment of non-critical parts of the project are taken to ensure that the total investment of the project will not change greatly.

5. Strengthen the ideological education of workers and do a good job in grassroots party building.

My department has always regarded the ideological and political work of employees as an important task, and studied the party's policies and rules as its daily work, and constantly communicated with employees in order to keep abreast of their ideological trends and help them solve problems in their lives. Carry out rectification and self-examination of leading cadres in party member, and consciously accept supervision by the masses. Through the study, the political and ideological awareness of all employees has been significantly improved, and their work attitude and work efficiency have been significantly improved. No violation of rules and regulations.

6. Strengthen institutional learning and consciously abide by the post integrity system.

In order to improve employees' consciousness of observing discipline, our department regularly organizes employees' learning system, from the relevant management systems of group companies, KKK companies and factories to the management systems of departments and post responsibilities, and evaluates the learning effect once a month. Employees who are at the bottom of the assessment will be punished according to the relevant system of the factory, and the bonus of the month will be deducted.

Summary of Infrastructure Work In the first half of 20xx, under the correct leadership of the Infrastructure Office, in accordance with the spirit of the annual work report and the annual work task breakdown table of this department, and with the careful support of relevant departments, all departments of Qi Xin made concerted efforts, earnestly performed their duties, paid close attention to project quality, strictly controlled investment costs, improved work efficiency, worked hard, made innovations with heart, and all the work progressed as planned. The work in the first half of this year is reported as follows:

First, strengthen the study of political theory and pay attention to professional ethics.

1, consciously study and strive to improve.

Organize all employees in this department to study political theory, laws and regulations and professional knowledge every week, enhance moral awareness, professional ethics and humanistic quality, and strive to improve the political quality and professional level of all employees in this department.

2. Diligence and integrity.

Insist on reporting major issues to superior leaders and the masses for study and solution; Adhere to a clear assignment of tasks and check them carefully on a regular basis; Adhere to the principle of bidding for construction projects and bulk building materials, handle affairs in strict accordance with relevant procedures, be fair, open and just, and never practice favoritism; Adhere to the "Regulations on Construction Management of XX Province" and other relevant documents, regardless of the scale of the project, both inside and outside the budget are strictly implemented in accordance with the infrastructure management procedures, and never vary from person to person, violating the procedures; Adhere to the provisions and prohibitions of clean politics, constantly carry out anti-corruption education, wake up the alarm, conscientiously implement the responsibility system for building a clean and honest party style, and prevent violations of discipline and law.

The second is to pay close attention to project construction management and strictly control quality.

1, do a good job in promoting the supporting projects of the distribution center.

In the first half of 2008, our department strengthened the supervision of the construction progress of the bid winner, communicated with the design institute in time about the difficulties and uncertainties in the project, confirmed the changed parts in the construction, strictly reviewed the materials, completed the acceptance of the decoration areas of each division in time, determined the key parts and links, and timely supervised the implementation of materials and experiments that need to be tested. And contacted and coordinated the fire fighting unit, weak current unit, air conditioning unit, elevator unit and other decoration units to cooperate with each other, and completed XXX pairs on time.

During the construction period, our department will assign special personnel to work on site regularly and take the form of weekend rotation to be on duty at the construction site, so as to achieve the purpose of working and sleeping at the same time with the construction unit as required by the company.

At the same time, according to the progress of the project, our department prepares the project briefing, organizes the project regular meeting on time, and conducts on-site safety inspection together with the security department every day.

2, the new office building relocation work

According to the unified deployment of XXX, our department cooperated with the office and other departments in time to complete the relocation of the new office building, dealt with the problems in the process of relocation in time, arranged the installation of the hall chandelier, the production of the cultural wall and the installation of the fountain in time, and inspected and commissioned the important parts and electronic equipment of each floor. Minimize the impact of moving to a new location on the work of various departments, summarize the feedback from various departments in time after each unit moves in, and arrange the construction personnel to solve it at the first time.

3, comprehensive service facilities engineering

In the first half of the year, the canteen completed the template making, steel binding and concrete pouring, and completed the termite control work. The canteen has been capped and has now entered the stage of building walls indoors. Our department will promptly urge the construction unit to speed up the construction progress and put it into operation as soon as possible.

4, outdoor engineering

In the first half of the year, we will complete the outdoor project bidding work such as greening bidding, road bidding, general layout weak current bidding, landscape electrical bidding and doorpost bidding, and coordinate the bidding with the winning bidder in time. At present, all projects are basically ready as planned.

5. Do all kinds of sporadic maintenance projects in time.

In the first half of 20XX, our department started sporadic projects one after another. Some projects that meet the requirements will be confirmed by the negotiation meeting held by XXX bidding office. Sporadic project construction, there will be someone who is in charge of the site, and other departments will go to the site for inspection and supervision from time to time. After the construction, many departments will be organized for completion acceptance. After the completion of the project, the project will be initially reviewed, and the audit department and intermediary institutions will strictly check and do a good job in the final accounts audit.

Three, grasp the building materials market, do a good job of price confirmation.

1, know the market and master the information.

Adhere to the basic practices of excellent quality, low price, timely delivery and complete three certificates and one list (product license, product production license, product factory certificate and product quality inspection list) in the construction process. In the implementation of the canteen project, in order to confirm the quality and price of materials, our department subscribes to market information price publications, makes market inquiries, makes telephone and online inquiries, and pays attention to the current situation of material manufacturers and the market conditions at any time.

2. Adhere to the principle of strict control.

In the confirmation of the quality and price of building materials, we should follow the design principle and adhere to the principle of quality first and reasonable and low price on the premise of satisfying the design and use. Pay attention to the cost performance of products, select the best with the same quality, select the best at the same price, and strictly control the investment cost. In the price audit of decorative materials, adhere to the careful audit list, and strive to avoid missing items; Repeatedly scrutinize the contract terms, adhere to the contract offer, and resist unreasonable changes.

Fourth, cooperate with construction and improve infrastructure management.

1, and do a good job of cooperation inspection.

According to the document requirements of the relevant departments of the provincial bureau and the municipal bureau, meet the inspection of supporting projects, rearrange the archives of infrastructure projects since the start of construction, and strengthen the trace management. In accordance with the implementation requirements of "Procedural Provisions" in XXX Province, we will do a good job in the pilot work of implementing the "Procedural Provisions", further summarize and improve it on the basis of standardized operation, earnestly carry out the key self-inspection work of "three tasks", and effectively improve the level of investment management. Passed the inspection of the audit department of the provincial and municipal bureaus.

2. Promotion of safety management system

In the first half of 2008, the security system of our department operated well. At the same time, according to the unified requirements of the company's system operation, our department has steadily promoted the operation of the safety system. Before the project construction, we identify the construction hazards, conduct safety training for the construction party, preach the safety objectives and requirements of our company, remind the construction party to prevent the hazards, sign a safety agreement with the construction party, and conduct safety inspection on schedule during the construction process.

3. Quality system construction

In the first half of 2006, our department carried out the quality system operation according to the company's requirements, promoted the quality system work in time according to the company's unified requirements, completed the tasks in various stages and improved the department's work.

4, infrastructure archives filing

According to the national, provincial and municipal regulations, as well as XXX file management regulations, our department will file infrastructure files in time. During the construction process, the project log should be recorded, and the whole process should be recorded and photographed for archiving; Concealed works should have verification data; Classify, arrange and file the project contact list, economic visa and meeting minutes to prepare for the completion audit.

5. Other completed work

In addition, according to the company's unified deployment and requirements, our department completes the monthly budget submission and status analysis, and submits the annual budget in time.

At the same time, in the first half of the year, the funds for exceeding the project were paid in time according to the audit amount of the tracking audit unit, which effectively accelerated the construction progress, completed the analysis and reporting of the public nodes of government and enterprise affairs, reported the information that departments need to disclose on time, carried out departmental heart-to-heart, improved departmental communication channels, and harmonized personnel relations. Timely report to the department for communication.

Five, the second half of the work ideas and main tasks

Looking back and looking forward, there is still a necessary gap between the expectations of our departments and leaders. Continue to carry forward the work style of daring to bear hardships and struggle hard, and further improve the political and ideological consciousness and professional quality of all employees in the department; Improve the internal management system and unremittingly do a good job in building a clean government; Establish and improve the management mechanism to meet the requirements of market economy and development needs, and firmly establish the sense of service; In order to ensure the smooth construction of the canteen project and make greater contributions to the construction of high-quality and high-level supporting projects.

Main tasks in the second half of the year:

1, speed up the project progress and complete the canteen construction on time and with good quality.

2, earnestly comprehensive service facilities engineering decoration bidding and construction.

3. Organize the completion acceptance of supporting projects.

4. Do well other sporadic projects of the company.

5. Promote the company's safety system, quality system, openness of government and enterprise affairs, budget management and other phased work.

The most important thing in the second half of the year is to improve the supporting facilities of the office building-canteen project as soon as possible. My department discussed and analyzed the problems from top to bottom, and summarized the following shortcomings:

1, some projects are not satisfactory, and there is still a necessary distance from the requirements of XXX.

2. Personnel training and knowledge updating are slow, and many management work is still at a low level, with unclear responsibilities and buck passing.

3. Insufficient communication with relevant departments is also the main reason that directly affects the smooth development of infrastructure.

4.* * * Management of accounts is not in place, which leads to the phenomenon that the project funds are not earmarked.

5. The on-site management level is not enough, the on-site personnel can't meet the construction requirements, and the progress is difficult to advance, which leads to repeated adjustment of the construction progress.

The above problems urgently need to be solved in the future work, and effective measures should be taken to keep pace with the times and catch up. The main measures are:

1, we should closely focus on XXX's task, carry forward the democratic style, solicit opinions extensively, organically combine the talents of infrastructure engineering technicians and managers with the practical experience of relevant management functional departments, and jointly create a new situation.

2. Give full play to the intentions and creativity of existing engineers and technicians, strengthen professional quality education, seriously study business theoretical knowledge, improve service awareness in combination with project management practice, adhere to the principle of "bringing the old with the new, supporting the old with the new, and advancing with * * * *", update technology in time, adhere to the principle without losing flexibility, and comprehensively improve the potential and level of professional and technical management.

3. Strive for horizontal communication and departmental cooperation. The staff of XXX related management departments have worked in the front line for a long time and have rich work experience. This is an indispensable resource in the work of our department. We should listen carefully to their opinions and suggestions, communicate with them attentively, coordinate the working relationship between departments, and make the infrastructure work subtle and trivial.

4, strengthen the management of * * * tube account, strictly audit each batch of project funds. Record and report the project payment in the ledger of steel bar, cement and block, and ensure that the project payment is special.

5. Learn the relevant knowledge of engineering construction management, check the construction site status together with the supervisor, prepare the construction progress plan, and carry out stage inspection in strict accordance with the plan. Once the progress is delayed, immediately hold a site meeting to find out the reason and take measures to implement it.

Summary of Infrastructure Work During the 5-20xx years, under the correct leadership of the Party Committee of the school and with the strong support of the faculty of the whole school, all the comrades of the Infrastructure Office are proud to participate in the construction of the new school. Qixin Qi Xin worked together, united and cooperated, managed scientifically, overcame all kinds of difficulties regardless of the severe cold and heat, fought in the construction line and successfully completed all tasks. The summary is as follows:

At the beginning of 1 20xx, after many hardships and twists and turns, all land procedures were completed and land certificates were obtained.

2. On the basis of the 56,000-square-meter first-phase project approved last year, we have won the new project approved by the National Development and Reform Commission, with an additional construction area of 1.25 million square meters, which will be used to build 4# student apartments, expert apartments and an additional comprehensive office building.

In March, March and August, the construction application procedures for 1#, 2# teaching building, 1# experimental building, 1 # ~ 3 # student apartment and 2# restaurant were completed respectively, and the planning permit for the construction project of 56,000 square meters was completed. For the above-mentioned single project, public bidding was conducted in seven blocks, and the bidding work of various projects was completed openly, fairly, justly and reasonably, which received good social response. In the process of going through the construction application procedures, we strive for various preferential policies to apply for reduction and exemption, and reduce the construction application fee by several hundred thousand yuan, saving a lot of construction funds for the school. At present, the construction of seven buildings has been started in an all-round way, with the foundation excavation and backfilling of 66,000 m, the groove foundation construction of some buildings, and the capping of the 1# teaching building, basically completing the main construction. Others are under construction according to the construction progress.

4. More than 80 rules and regulations related to the construction of new campus have been established and improved. There are laws to follow and rules to follow. The construction site strictly follows the safety and civilized construction regulations, strictly implements the system of inspection and regular meeting, corrects violations in time for many times, eliminates hidden dangers of accidents and puts an end to safety accidents.

5. Through market research and reasonable recommendation, the school adopts the scheme of mixing concrete on site in the new school building construction project, which can save money 165438+ ten thousand yuan.

6. Strictly control materials and quality. Since the start of construction, 8 batches of unqualified steel, 4 1 ton, have been found and cleaned up in time; Seven unqualified parts were found, and all of them were reworked.

7.500KVA transformer has been approved and installed. Four drainage pipes (700m)180m have been laid, 850m flood control ditches have been dug, 4 self-prepared wells have been drilled, and 620m water supply pipes have been installed, thus ensuring the construction of the new campus and the living electricity of 4,000 teachers and students next year.

8. The basketball court, road network and reservoir were blasted with 6 100m stones, and the court was further leveled, basically meeting the design requirements of the first phase. Road network foundation excavation, transportation, backfilling earthwork 13000m, laying gypsum road network 1020m to ensure smooth construction roads. In the course of course leveling, road network foundation acceptance, and changes in concealed works of various buildings, careful planning and demonstration have saved more than 200,000 yuan.

9. Complete the overall demolition of small enterprises in the new campus, laying a good foundation for the overall construction of the project.

10, finishing the site, electricity, toilets and roads for the groundbreaking ceremony of the new campus, and organizing construction personnel and machinery, thus effectively ensuring the smooth holding of the groundbreaking ceremony of the new campus.

1 1. At present, the application procedures for the construction of the comprehensive office building and the 4# student apartment are being handled, and the tender will be prepared in the near future. The geological exploration of the expert apartment to be built has also been completed.

In the new year, the first phase of the project has reached a critical stage, facing more difficulties and heavier tasks. Under the correct leadership of the Party Committee of the new campus, with the great concern and strong support of all the teaching staff, all the comrades in the new campus will, as always, work hard and have the confidence to ensure higher construction quality and faster construction progress, lay a solid foundation for ensuring the new students to move in next year and contribute all their strength to the early completion of the new campus.

Summary of Infrastructure Work Since 6-20xx years ago, under the correct leadership of the school leaders and principals in charge, with the help and support of all units, departments and faculty of the school, and through the joint efforts of all comrades in the department, the work tasks have been successfully completed closely around the key points of the school infrastructure. Now, the work of 20xx is summarized as follows:

First, some progress has been made in handling the preliminary procedures:

1, in 20xx, the third teaching building project completed five procedures such as site selection approval 15 and nine procedures such as construction land approval, construction contract, supervision contract, safety filing, quality supervision, bidding review, construction drawing review, design contract review and fire protection design approval.

2.20xx years, the gymnasium project completed fifteen procedures and four procedures, namely, the review of construction land design contract, construction drawing review and fire protection design approval.

3. Procedures such as temporary planning of small garage in East Campus, examination and approval of construction land, temporary planning of animal laboratory and traffic laboratory have been completed.

Two, strengthen the management of engineering technology, to ensure the realization of the project design, bidding stage cost control objectives:

1, engineering design, construction drawing review and design change, mainly completed the following aspects:

(1) supporting engineering design of the third teaching building.

(2) Construction drawing review of the third teaching building and gymnasium project.

③ Project design of animal laboratory.

(4) Design change and change price audit of the third teaching building 10.

2, bidding (including bidding) work and list preparation, budget audit mainly completed the following aspects:

(1) Bidding for supporting projects outside the third teaching building.

② Animal bidding in experimental projects.

(3) the third teaching building professional engineering (fire, ventilation, weak current) project bidding.

④ Bidding for sports venues.

In 3.20xx years, more than 65,438+00 engineering, design and consulting contracts were signed and approved.

Third, strengthen the management of engineering construction links to ensure the quality and progress of the project. Mainly completed the following aspects:

1, east campus power supply project (internal network and external network).

2, 20xx 14th project settlement review (internal audit).

3, 9 external audit project settlement audit work (library, south campus student apartment, east campus 12 # student apartment, overpass, main school gate, library electronic reading room network wiring project, southeast campus street lamp project, scientific research building and small garage).

4, fire control and quality inspection and acceptance.

5. The main project of the third teaching building in the east campus ensures the smooth relocation of the west campus.

Four, strengthen management awareness, cost control work has achieved certain results:

1, actively communicate and coordinate with relevant departments in the city, saving about 3.5 million yuan for the school.

2. By adopting the mode of bill of quantities and cost tracking management, it is estimated that the construction cost of the third teaching building will be lower by 200 yuan /m2 than in previous years, saving about 4.6 million yuan.

3. Increase the transparency of project management, and set up a leading group for capital construction work composed of audit, discipline inspection commission, finance and other departments to conduct collective research on changes, payment and material pricing involved in the construction process, so as to eliminate loopholes in the management process.

5. Strive for funds through multiple channels, actively communicate and coordinate with higher authorities, and complete the sorting and declaration of all materials of Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run Run

6. Completed the compilation of infrastructure management manual, which laid the foundation for the scientific management of campus infrastructure.

The above is a brief review of the work of the infrastructure sector in 20xx. In the past year, although some achievements have been made. However, there are still some shortcomings, which should be gradually improved in the next work process to successfully complete the task of 20xx.

;